August 26, 2015
TO: Mark VanDomelen, Building official
Community Development/Building Division, City of Tigard 13125 SW Hall
Boulevard Tigard OR 97
FROM: Rebai Tamerhoulet, PE, SE
RE: Muslim Educational Trust Community Center
10330 Scholls Ferry Roadj Tigard OR 97223
This correspondence shall serve as certification that all engineering designs
and construction works on the above mentioned project have been completed in
accordance with all applicable state building codes. Any design changes made
during construction have been pre-approved by engineer of record and the city
if Tigard.
Based on field inspections/observations and the review of all the special
nsp t pn reports, it is my professional opinion that all work has been installed
a is in` ubstantial compliance with the approved construction drawings and
see ificgtions.
x secontact me ifou should have any y questions or need additional
information.
�k y
tAto
3
siRucTUR,14
\<c-c().,"
� PROFESS
�G I NEF4, '°
i/ 16953PE
//nfRFON
i)
"PF`6, 16, No����
4/ TAMER
EXPIRES: 6/30/16
REBAI TAMERHOULET, PE; SE