Loading...
Report (21) ",,..af 7409 SW Tech Center Dr,Ste. 145 �+:rrrKr,rrr Tigard,OR 97223 r�., Ph:503-443-3799 Fax:503-620-2748 503.44i3799 Special Inspection Final Report Date: 10-23-15 Job# 15-5930 Permit#BUP2015-00036 Mail To: Project: KLEINFELDER COSTCO FUEL STATION-TIGARD 550 W C ST,STE 1200 7850 SW DARTMOUTH SAN DIEGO,CA 92101 TIGARD,OR 97224 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Reinforced Concrete Steel Construction—High Strength Bolts Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. -6'1\)(17:2It Approved b d pp :Y Bob Brown/President BB/sa J ..se, Proud to be Nationally Accredited by International Accrediting Service ACCREDITED