Report (128) MAYES TESTING ENGINEERS, INC. Seattle Office20225 Cedar Valey
Road
, ffi Sate 110
Lynnwood,WA 98036
Project No. P16149 ph 425.742.9360
fax 425.745.1737
Project Rose City Futsal
Address 10831 Cascade Avpnita, Tigard, OR Tacoma Office
10029 S.Tacoma Way
Permit No. BUP2016-00189 Side E-2
Bldg Dept. City of Tigard Tacoma,WA98499
ph 253.584.3720
fax 253.584.3707
Client JH Kelly
Architect EL,A Portland Office
Engineer Froelich Consulting Engineers, Inc. 7911Stitlee 190
rdorne
90
Contractor JH Kelly Potland,OR97211
ph 503281.7515
fax 503281.7579
Record No. 001
Date 7/29/2016
Weather Indoors
Inspection Proprietary Anchors
Sample(s) None
Provided continuous epoxy anchor installation inspection for rebar dowels at intermediate footings
between gridlines 3-5/C-F, old footings to new footings connections and new footings between
gridlines 2-3/A-G. Contractor used a 5/8" ANSI bit to drill all holes for #4 dowels at old footings to
new footings, a 7/8" ANSI bit for#6 dowels at new footings and a 1/2" ANSI bit for#3 dowels at new
footings under steel posts. All holes were drilled to minimum embedment depth of 6" and cleaned
using blow, brush, and blow method. Contractor used sufficient amounts of Simpson SET(Lot#SET
XP22 123X214X, Expiration date: 10/25/17). All work performed is per approved plans,
manufacturers' recommendations and ICC ES ESR 2508.
To the best of our knowledge, all items inspected today are in conformance with approved plans and
specifications.
Inspector: Cliff Zenger
OBOA# 909
.7
Reviewed By: jj��;, 7J (/'
Mark A. Galusha, P.E.
Branch Manager
Information in this repot applies ony to the actual items inspected or tested and shal not be reproduced euept in full,without the approtel of Mayes Testing Engineers,Inc