Loading...
Report (128) MAYES TESTING ENGINEERS, INC. Seattle Office20225 Cedar Valey Road , ffi Sate 110 Lynnwood,WA 98036 Project No. P16149 ph 425.742.9360 fax 425.745.1737 Project Rose City Futsal Address 10831 Cascade Avpnita, Tigard, OR Tacoma Office 10029 S.Tacoma Way Permit No. BUP2016-00189 Side E-2 Bldg Dept. City of Tigard Tacoma,WA98499 ph 253.584.3720 fax 253.584.3707 Client JH Kelly Architect EL,A Portland Office Engineer Froelich Consulting Engineers, Inc. 7911Stitlee 190 rdorne 90 Contractor JH Kelly Potland,OR97211 ph 503281.7515 fax 503281.7579 Record No. 001 Date 7/29/2016 Weather Indoors Inspection Proprietary Anchors Sample(s) None Provided continuous epoxy anchor installation inspection for rebar dowels at intermediate footings between gridlines 3-5/C-F, old footings to new footings connections and new footings between gridlines 2-3/A-G. Contractor used a 5/8" ANSI bit to drill all holes for #4 dowels at old footings to new footings, a 7/8" ANSI bit for#6 dowels at new footings and a 1/2" ANSI bit for#3 dowels at new footings under steel posts. All holes were drilled to minimum embedment depth of 6" and cleaned using blow, brush, and blow method. Contractor used sufficient amounts of Simpson SET(Lot#SET XP22 123X214X, Expiration date: 10/25/17). All work performed is per approved plans, manufacturers' recommendations and ICC ES ESR 2508. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Cliff Zenger OBOA# 909 .7 Reviewed By: jj��;, 7J (/' Mark A. Galusha, P.E. Branch Manager Information in this repot applies ony to the actual items inspected or tested and shal not be reproduced euept in full,without the approtel of Mayes Testing Engineers,Inc Page 1 of 1