Loading...
Report (2) s OPERATION 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC PIPING SUPERVISED 0 YES 0 NO DETECTING MEDIA SUPERVISED 0 YES 0 NO DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS 0 YES 0 NO IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR IF NO, EXPLAIN TESTING 0 YES 0 NO DELUGE& PREACTION DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO VALVES OPERATE SUPERVISION OPERATE VALVE OPERATE RELEASE MAKE MODEL LOSS ALARM? RELEASE? YES NO YES NO MIN. SEC. 0 0 0 HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi(13.6 bars)for two hours or 50 psi(3.4 bars)above static pressure in excess of 150 psi(10.2 bars)for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent TEST damage.All aboveground piping leakage shall be stopped. DESCRIPTION PNEUMATIC: Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1-1/2 psi(0.1 bars)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1-1/2 psi(0.1 bars)in 24 hours. ALL,PIPING HYDROSTATICALLY TESTED AT 200 ,PSI FOR 2 HRS. IF NO,STATE REASON: DRY PIPING PNEUMATICALLY TESTED 0 YES ® NO EQUIPMENT OPERATES PROPERLY Z YES 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS,SODIUM SILICATE OR DERIVATIVES OF SODIUM SILICATE, BRINE,OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? Z YES 0 NO TESTS DRAIN READING OF GAGE LOCATED NEAR WATER SUPPLY RESIDUAL PRESSURE WITH VALVE IN TEST TEST TEST CONNECTION: PSI CONNECTION OPEN WIDE PSI UNDERGROUND MAIN AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING VERIFIED BY COPY OF THE U FORM NO. 85B 0 YES ® NO FLUSHED BY INSTALLER OF UNDER- NOTES: GROUND SPRINKLER PIPING 0 YES ❑ NO *Measured from time inspector's test connection is opened. *NFPA 13 only requires the 60-second limitation in specific sections. BLANK NUMBER USED LOCATIONS: NUMBER TESTING 0 GASKETS REMOVED WELDED PIPING ®YES 0 NO IF YES. . . DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3? ®YES 0 NO WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3? YES 0 NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? ®YES 0 NO CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL (DISCS) CUTOUTS(DISCS)ARE RETRIEVED?®YES 0 NO HYDRAULIC IF NO,EXPLAIN: DATA NAME PLATE PROVIDED ®YES 0 NO • NAMEPLATE REMARKS DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: Month: Day: Year: NAME OF SPRINKLER CONTRACTOR: Delta Fire, Inc. TESTS WITNESSED BY FOR PROPERTY OWNER(SIGNED) TITLE DATE FOR SPRINKLER CONTRACTOR(SIGNED TITLE DATE SIGNATURES FOR LOCAL FIRE MARSHAL(SIGNED) TITLE DATE FOR RESPONSIBLE MANAGING EMPLOYEE(SIGNED) TITLE DATE ADDITIONAL EXPLANATION AND NOTES a