Loading...
Report (64) Bend Office (541)330-9155 • Geotechnical Office (503)601-8250 arlson Testing, Inc. Eugene Office Salem Office (541)345-0289 (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: June 16, 2017 Job#: T1606782 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Durham Primary Treatment(#6755) Address: 16580 SW 85th Ave.—Tigard, OR Permit#: BUP2016-00073/ME.b2016-00157 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Structural Steel The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:\Projects\General\2016\T1606782\06-16-17 Final Letter.doc Updated 11/30/11 D June 16, 2017 • Job#: T1606782 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. St en W. Leach Project Manager SWL/jng cc: Clean Water Services (Durham)— Randy Naef- EADOC City of Tigard Building Division—Walter'Chip' Barnett✓ WALTER@TIGARD-OR.GOV McClure &Sons Inc Carlson Testing, Inc. Incompleted Items List (NCL) Jun 16,2017 T1606782. Project Name: DURHAM PRIMARY TREATMENT (#6755) Project Address: 16580 SW 85TH AVE TIGARD OR Permit No: BUP2016-00073 / MEC2016-00157 P.O.No: 29502 Project Manager: STEVEN W. LEACH Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 DEL 07/27/2016 WELDER CERTIFICATIONS WERE NOT AVAILABLE FOR REVIEWED. A. IDZARDI 08/11/2017 REVIEW COVERING SMAW SHEET TO SHEET AND SPOT WELDING. 2 AI 10/19/2016 SMALL WELDS SIZE (LESS THAN 5/16") WELDS HAVE BEEN REPAIRED K. LARKIN 10/21/2016 AND MEET 5/16" REQUIREMENT. CC:CLEAN WATER SERVICES (DURHAM) - RANDY NAEF CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT MCCLURE & SONS INC Page: 1