Resolution No. 17-34 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 17-3'-(
A RESOLUTION AMENDING THE CITYWIDE MASTER FEES AND CHARGES SCHEDULE
WHICH WAS ADOPTED UNDER RESOLUTION NO 17-27.
WHEREAS, the City of Tigard has a Master Fees and Charges Schedule that was adopted during the fiscal year
2017-2018 budget hearings as Resolution 17-27;and
WHEREAS,city staff has reviewed fees and services provided; and
WHEREAS, city staff has proposed new fees and changes to certain fees related to parks and recreation and
public engineering;and
WHEREAS,the city's Master Fees and Charges Schedule includes fees set by other agencies; and
WHEREAS, Tigard Municipal Code (TMC) 3.32.050 requires that the City Council review fees and charges
annually.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the attached
schedule (Exhibit A).
SECTION 2: This resolution is effective July 26,2017.
PASSED: This 23--kA—day ofQ,&,42017.
Mayo City of Tigard
ATTEST:
gLl
City Recorder-City of Tigard
RESOLUTION NO. 17-_?
Page 1
Exhibit A
City of Tigard, Oregon
Master Fees & Charges Schedule
Fiscal Year 2017 - 2018
Revised
June 28,2017
1,
TIGARD
Page 1
1"leeA. Tlate
CITY MANAGEMENT
Claims Application Fee(TMC 1.21.050&1.22,Ord.08-09) $1,000.00 /deposit' 6/24/2008
* Claim fee shall be actual cost incurred by the city to process claim.
Any funds remaining from the deposit after the claim has been processed will be
refunded to the claimant.Payment of any costs exceeding the amount of the deposit
is required prior to issuance of a final decision by the city on the claim.
ADMINISTRATIVE SERVICES
Municipal Court Fees
Civil Compromise $150.00 8/28/2008
Traffic School and Compliance Program Fee
Criminal $150.00 8/28/2008
Juvenile non-traffic $130.00 7/1/2017
Traffic School Equal to the relevant fine provided for the 8/28/2008
violation in the Violations Bureau Fine Schedule
License Reinstatement $15.00 8/28/2008
Payment Agreement Administrative Fee $15.00 8/28/2008
Overdue Pavment Letter $10.00 8/28/2008
Show Cause Hearings-Court Costs 8/28/2008
Non-compliance $25.00
Non-payment- fees paid prior
to hearing No Fee
Warrant Fee $50.00 8/28/2008
CITY MANAGEMENT
Public Assembly 8/25/1970
Application Fee
Persons Reasonably Anticipated
1,000 to 2,499 $100.00
2,500 to 4,999 $150.00
5,000 to 9,999 $500.00
10,000 to 49,999 $1,000.00
50,000 and over $1,500.00
ADMINISTRATIVE SERVICES/RECORDS
Tigard Municipal Code(TMC)(Titles 1-17)or TMC/CDC(Titles 1-18)
Compact Dish (CD) $10.00 7/1/2009
Page 2
CITYWIDE
Attorney Time Current attorney billing rate 1999
4GB Flash Drives $11.00 each 7/1/2011
Candidate Nomination Petition Fee $50.00
DVD/CD $10.00 7/1/2015
Faxes for Public $2.00 /first page 7/1/2007
$1.00 /each additional page
Microfiche Sheet Copies $1.00 /sheet up to 50 sheets plus 7/1/2007
staff time
Photocopies
8-1/2 x 11 $0.25 /page 1999
8-1/2 x 14 $0.50 /page 1999
11 x 17 $1.00 /page 7/1/2005
17 x 24 $1.50 /page 7/1/2007
36 x 36 $2.50 /page 7/1/2007
Candidate Nomination Petition Fee $50.00 7/1/2008
Oversized Copies $2.50 /page 7/1/2011
Photographs _actual Cost 1999
Recording of Documents _actual Cost 1999
Research Fee Staff hourly rate + Cit}-vAde Overhead 2/7/2002
Fee +Materials
Staff Hourly Rate for Miscellaneous Billing Staff hourly rate + benefits +paid time off+ 7/1/2015
and Reimbursement Agreements administrative time +department overhead+citywide overhead
as determined by most recent A-87 Indirect Cost Study
Based on the agreement,all,or part,of the components
of the A-87 Indirect Cost Study may be used.
Page 3
€ec
e Date
FINANCIAL&INFORMATION SERVICES
Assessment Assumption $50.00 4/22/1985
Budget Document
Compact Disk(CD) $10.00 7/1/2007
Paper $50.00
Business License
Annual Fee*
0-2 employees $91 /per year 7/1/2017
3-5 employees $122 /per year 7/1/2017
6-10 employees $428 /per year 7/1/2017
11-20 employees $702 /per year 7/1/2017
21-50 employees $805 /per year 7/1/2017
51-75 employees $877 /per year 7/1/2017
greater than 75 employees $1,187 /per year 7/1/2017
*Adjrr.cted annrmJly nr eorrjrurctiorr uvillj the Por1larrd Corrsurraer Price Irrdex�(CPI)-2.1410 in rr.ce fa•07/01/2017 fees.
Pro-Rated Fee Schedule
Issued January 1 -June 30 See Fee Schedule above
Issued July 1 -December 31 1/2 the annual fee
Temporary License $25.00 1/1/2008
Duplicate License/Change of Ownership Fee
Change in ownership or name only $10.00 1/1/2008
Copy/replacement of license $10.00 1/1/2008
Delinquency Charge
the original business license fee due and payable shall be added for each calendar month or fraction thereof that the fee remains
unpaid. The total amount of the delinquency penalty for any business license year shall not exceed one hundred percent(100%)
of the business license fee due and payable for such year.
Page 4
16>reeYe � gRec ive Date
Comprehensive Annual Financial Report $0.00 2/7/2002
Franchise Fee/Right of Way Usage Fee(See TMC 15.06)
(Owns facility in ROW and provides service to customers
Electricite within Tigard) 5%of gross revenue or$4,000 whichever is greater 1/9/2015
(Owns facility in ROW and provides no service to customers
Electricity within Tigard) $2.90/linear foot of installation in right-of-way 1/9/2015
or$4,000,whichever is greater
(Using a non-owned facility in ROW and provides service to
Electricite- customers within Tigard) 5%of gross revenue 1/9/2015
(Owns facility in ROW and provides service to customers
Natural Gas within Tigard) 5%of gross revenue or$4,000 whichever is greater 1/9/2015
(Owns facility in ROW and provides no service to customers
Natural Gas within Tigard) $2.90/linear foot of installation in right-of-way 1/9/2015
or$4,000,whichever is greater
(Using a non-owned facility in ROW and provides service to
Natural Gas customers within Tigard) 5%of gross revenue 1/9/2015
(Owns facility in ROW and provides service to customers
Telecom* within Tigard) 5%of gross revenue or$4,000 whichever is greater 1/9/2015
Telecom* (Provides no service to customers within Tigard) $2.90/linear foot of installation in right-of-way 1/9/2015
or$4,000,whichever is greater
(Using a non-owned facility in ROW and provides service to
Telecom* customers within Tigard) 5%of gross revenue 1/9/2015
*(Iochrdes telecommunication utilities, kng distance providers,
private networks and corrrpetitive access providers)
Utility Franchise Application Fee $2,000.00 8/8/2006
Solid Waste Disposal (See TIMC 11.04) 5%of gross revenue 7/1/2013
Cable TV(See TMC 5.12) 5%of gross revenue 1/26/1999
Application filed with YAMCC(email matt c�i maccor.or�
Lien Search Fee $35.00 2/1/2004
Overhead Fee
Added to charges for property damage/repair 10%of total charge
Page 5
fere Date
Passport Execution Fee $25.00 2/1/2008
Passport Photographs Fee $10.00 4/1/2007
Returned Check Fee $20.00 10/9/2001
Sewer Reimbursement District Loans
Interest Rate applicable Federal Rate (AFR),Table,Long-term,semiannual for the
month the loan is approved
System Development Charge Financing(other than Sewer Reimbursement District Loans
_Application Fee $25.00
Interest Rate Prime rate as published in the Wall Street Journal as of the date of the
application plus 4%
Page 6
Deyat'BtlxC t lky"09 eu e,
..,_ �',�fih=,� __: .., ')effective Date
LIBRARY -
Collection AgencyFee S10.00 7/1/2007
Disk or CD(Blank) S1.00 2/7/2002
Flash Drive S5.00 each 7/1/2013
Library Card Fee(non-residents only) c„4`00 pef year ,'
$140.00 peryear 8/1/2017
Lost Items Replacement cost+S5.00 processing fee 7/1/2003
Overdue Cultural Passes S10.00 per day 7/l/2013
Overdue Items
Daily Charge S0.25 /item 7/1/2017
(.Adult and Young.Adult Materials-Not Including luvcnilc Materials)
51-00 �/teerra =f1f200�
Maximum Charge 55.00 /item 7/1/2005
iri s e4.00tiptt) ffiftxttrftttmper
Public Copier and Printer Charges
S0.10 /page for black&white 2001
S0.50 /page for color 7/1/2011
Replacement Library Card Fee S1.00 7/1/2007
page 7
Depaomertt esmt Qi se r►r;` ., ` Effective Date
POLICE
Alarm Permit Fee Residential&Commercial)
(Gooernmernt ggencief, disabled rejzdentr or over the age of 60 are exempt) $25.00 7/l/2009
Late payment of fees/fines (after 60 days) $100.00 7/1/2013
Failure to Obtain Permit within 60 Days of Alarm Installation $100.00 7/1/2013
Reinstatement Fee,Once Revoked(_after 90 days past due) $100.00 7/1/2014
Non-permitted or Revoked Alarm Permit $500.00 7/1/2013
Distracted Driving Diversion Program $25.00 7/1/2014
False Alarm Fines
1st false alarm No Charge No Charge 7/1/2013
2nd false alarm No Charge No Charge 7/1/2013
3rd false alarm $100.00 7/1/2013
4th false alarm $150.00 7/1/2013
5th false alarm $200.00 7/1/2013
6 or more false alarms $250.00 7/1/2013
Fingerprint Card $15.00 per card 7/1/2012
Good Conduct Background/Letter $10.00 7/1/2012
Law Enforcement Officers Safety Act Qualification Fee $25.00 7/1/2006
Liquor License $25.00 7/10/2001
Police Services Fees
D\'D/audio/V'HS Evidence Copies $20.00 7/1/2012
Police Documents/Reports $10.00 /for the first 15 pages and 7/1/2008
$0.30 /page thereafter
Police Digital Photo CD Copies $10.00 /CD 7/1/2005
Police Photograph Copies $10.00 /roll 7/1/2003
Page 8
Dep _attmnt Raeane iuxe . Effective Date
POLICE
Property Forfeiture for Criminal Activity Varies 5/25/1999
Second Hand Dealers and Transient Merchant License
Occasional $40.00 7/1/2010
Full-Time $100.00 7/1/2010
Reporting Forms $0.80 each 7/1/2010
Special Event Permit Application Fee
For-Profit Fee(Resident) $150.00 7/1/2015
For-Profit Fee (Non-Resident) $200.00 7/1/2015
Non-Profit Fee(Resident) $75.00 7/1/2015
Non-Profit Fee(Non-Resident) $125.00 7/1/2015
Social Gaming License
Annual fee due January 1sT $100.00 1/1/2014
If a business applies on or after July 1st $50.00 7/l/2014
Vehicle Release Fee $125.00 7/1/2013
Page 9
beget �lp. -'_ � Effective Date
COMMUNITY DEVELOPMENT-BUILDING
Building Permit Fees
(New Commercial) 10/1/2009
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof.
$2,000.01 to$25,000.00 $91.44 /for the first$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $540.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
(New Single Family&Multi-Family) 10/1/2009
Total Valuation:
$0.00 to$2,000.00 $66.25 /minimum
$2,000.01 to$25,000.00 $66.25 /for the first$2,000 and
$11.48 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $33039 /for the first$25,000 and
$8.75 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $549.04 /for the first$50,000 and
$6.25 /for each additional$1,000 or fraction thereof
$100,000.01 to$250,000.00 $861.54 /for the first$100,000 and
$4.46 /for each additional$1,000 or fraction thereof
$250,000.01 to$500,000.00 $1,530.54 /for the first$250,000 and
$4.42 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $2,635.54 /for the first$500,000 and
Page 10 $4.10 /for each additional$1,000 or fraction thereof
Dep x Ment a €g t ective Dale
$1,000,000.01 to$2,000,000.00 $4,685.54 /for the first$1,000,000 and
$3.33 /for each additional$1,000 or fraction thereof
$2,000,000.01 and over $8,015.54 /for the first$2,000,000 and
$3.18 /for each additional$1,000 or fraction thereof
(Additions,Alterations,and Demolitions for
Single Family,Multi-Family,Commercial,&Industrial) 10/1/2009
"Total Valuation:
$0.00 to$500.00 $53.27 /minimum
$500.01 to$2,000.00 $53.27 /for the first$500 and
$3.39 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $104.12 /for the first$2,000 and
$15.21 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $453.95 /for the first$25,000 and
$11.02 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $729.45 /for the first$50,000 and
$7.53 /for each additional$1,000 or fraction thereof
$100,000.01 to$500,000.00 $1,105.95 /for the first$100,000 and
$6.04 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 $3,521.95 /for the first$500,000 and
$5.09 /for each additional$1,000 or fraction thereof
$1,000,000.01 and over $6,066.95 /for the first$1,000,000 and
$3.39 /for each additional$1,000 or fraction thereof
Building Plan Review Fee 65%of base building permit fee 9/26/2000
Deferred Submittals $200.00 minimum fee 9/24/2002
Plan Review plus 65%of building permit fee based on valuation
of the particular portion or portions of the project.
Phased Permitting $200.00 9/24/2002
Plan Review plus 10%of building permit fee based on total project valuation
Page 11 not to exceed$1,500 for each phase
�WiWve Date
Photovoltaic Solar Panel System $180.00 (includes plan review and administrative fees) 1/1/2011
plus 12%state surcharge of permit fee
Electrical Fees 10/l/2009
New residential,single or multi-family per dwelling unit;service included:
1000 square feet or less $168.54
Each additional 500 square
feet or portion thereof $33.92
Limited energy,residential or multi-family $75.00
(with above sq ft)
Each manufactured home or
modular dwelling service or feeder $67.84
Services or feeders;installation,alterations or relocation:
200 amps or less $100.70
201 amps to 400 amps $133.56
401 amps to 600 amps $200.34
601 amps to 1000 amps $301.04
Over 1000 amps or volts $552.26
Reconnect only $67.84
Temporary services or feeders;installation,alteration or relocation:
200 amps or less $59.36
201 amps to 400 amps $125.08
401 amps to 600 amps $168.54
Branch circuits;new,alteration or extension per panel:
With purchase of service or
feeder-each branch circuit $7.42
Without purchase of service or feeder
First Branch Circuit $56.18
Each addit.Branch circuit $7.42
Miscellaneous (service or feeder not included):
Each pump or irrigation circuit $67.84
Each sign or outline lighting $67.84
Signal circuit(s)or a limited
energy panel,alteration or extension $75.00
Each additional inspection over
the allowable in any of the above
Per Inspection $66.25 /hour(min 1 hour)
Per Hour $6635 /hour(min 1 hour)
Industrial Plant Inspection $78.18 /hour(min 1 hour)
Page 12
Effective Date
Departme t ..
Renewable Energy Electrical Fees:
5 kva or less $100.70 7/1/2012
5.01 to 15 k-va $133.56 7/1/2012
15.01 to 25 kva $200.34 7/1/2012
Wind generation systems in excess of 25 kva:
25.01 to 50 kva $301.04 7/1/2012
50.01 to 100 kva $552.26 7/1/2012
>100 kva the permit fee shall be calculated
in accordance with OAR 918-309-0040.
Solar generation systems in excess of 25 kva:
Each additional kva over 25 $7.42 7/1/2012
>100 kva no additional charge
Each additional inspection over allowable in any of the above:
Each additional inspection will be charged $66.25/hr 7/1/2012
at an hourly rate(1 hr minimum)
Misc.fees at an hourly rate (1 hr minimum) $90.00/hr 7/1/2012
Electrical permit plan review fee 25%of the electrical permit fee
Fire Protection Systems 10/1/2009
(Commercial Fire Suppression-Sprinkler,Alarm and Type I-Hood systems based on project valuation)
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof
$2,000.01 to$25,000.00 $91.44 /for the first$2,000 and
$10.76 /for each additional$1,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
$8.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $509.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first$100,000 and
$4.49 /for each additional$1,000 or fraction thereof
Page 13
rent
DepF ,� eetsve ate
Fire Life Safety Plan Review 40%of base building permit fee 9/26/2000
(Commercial Only)
Fire Protection Systems 10/1/2009
(Residential Fire Suppression)
Stand.Hone System
Square Footage:
1 to 2,000 $198.75
2,001 to 3,600 $246.45
3601 to 7,200 $310.05
7,201 and over $404.39
Multipurpose or Continuous Loop System
ware Footage-
0 to 2,000 $121.90
2,001 to 3,600 $169.60
3,601 to 7,200 $233.20
7,201 and over $327.54
Manufactured Dwelling Installation $305.50 9/24/2002
(Fee includes placement permit$275.50 and state administration fee$30.00)
Manufactured Dwelling and Mobile Home Per OAR 9/24/22002
Parks,Recreation Camps,and Organizational Camas
Mechanical Fees 10/1/2009
(1&2 Family Dwellings for New,Additions,or Alterations)
Heating/Cooling:
_fir conditioning $46.75
Furnace 100,000 BTU (ducts/vents) $46.75
Furnace 100,000+ BTU (ducts/vents) $54.91
Heat pump $61.06
Duct work $23.32
Hydronic hot water system $23.32
Residential boiler(radiator or hydronic) $23.32
Unit heaters (fuel-type,not electric),
in-wall,in duct,suspended,etc. $46.75
Flue/vent for any of above $23.32
Other $23.32
Page 14
pa ext�t ear' - E eet t*e bate
e
Other fuel appliances:
Water heater $23.32
Gas fireplace $33.39
Flue/vent for water heater or gas fireplace $23.32
Log lighter(gas) $23.32
Wood/pellet stove $33.39
Wood fireplace/insert $23.32
Chimnev/hner/flue/vent $23.32
Other $23.32
Environmental exhaust and ventilation:
Range hood/other kitchen equipment $33.39
Clothes drver exhaust $33.39
Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) $23.32
.attic/crawlspace fans $23.32
Other $23.32
Fuel piping:
First four $14.15
Each additional $4.03
Nfinimum permit fee $90.00
Mechanical plan review fee 25%of Permit Fee
Mechanical Permit Fees 10/1/2009
(Commercial and Multi-family)
Total Valuation:
$0.00 to$500.00 $69.06 /minimum
$500.01 to$5,000.00 $69.06 /for the first$500 and
$3.07 /for each additional$100 or fraction thereof
$5,000.01 to$10,000.00 $207.21 /for the first$5,000 and
$2.81 /for each additional$100 or fraction thereof
$10,000.01 to$50,000.00 $347.71 /for the first$10,000 and
$2.54 /for each additional$100 or fraction thereof
$50,000.01 to$100,000.00 $1,363.71 /for the first$50,000 and
$2.49 /for each additional$100 or fraction thereof
$100,000.01 and over $2,608.71 /for the first$100,000 and
$2.92 /for each additional$100 or fraction thereof
Plan Review Page 11�5%of permit fee 9/24/2002
Effective Date
Hepaxte
Plumbing Fees 10/1/2009
(Commercial,Industrial,Residential, &Multi-Family)
New One&Two Family Dwellings
1 bath $312.70
2 bath $437.78
3 bath $500.32
Each additional bath/kitchen fixture $25.02
Site Utilities
Catch basin or area drain $18.76
Drywell,leach line,or trench drain $18.76
Footing drain,first 100' $50.03
Each additional 100'or part thereof
(footing drain) $37.52
Manufactured home utilities $50.03
:Manholes $18.76
Rain drain connector $18.76
Sanitary sewer,first 100' $62.54
Storm sewer, first 100' $62.54
Water service,first 100' $62.54
Each additional 100'or part thereof
(sanitary,storm,water service) $37.52
Fixture or Item
Backflow preventer $31.27
Backwater valve $12.51
Clothes washer $25.02
Dishwasher $25.02
Drinking fountain $25.02
Ejectors/sump $25.02
Expansion tank $12.51
Fixture/sewer cap $25.02
Floor drain/floor sink/hub $25.02
Garbage disposal $25.02
Hose bib $25.02
Ice maker $12.51
Interceptor/grease trap $25.02
Medical gas (value:$ ) see table
Primer $12.51
Roof drain(commercial) $12.51
Sink/basin/lavatory $25.02
Solar units (potable water) $62.54
Tub/shower/shower pan Page 16 $12.51
]Depa ent Re s, "'
Effetetive mate
Urinal $25.02
Water closet $25.02
Water heater $37.52
Water Piping/DW\' $56.29
Other: $25.02
Minimum permit fee $72.50
Plumbing plan review 25%of permit fee
Medical Gas Systems 9/24/2002
Total Valuation:
$1.00 to$5,000.00 $72.50 /minimum
$5,000.01 to$10,000.00 $72.50 /for the first$5,000 and
$1.52 /for each additional$100 or fraction
thereof,to and including$10,000.
$10,000.01 to$25,000.00 $148.50 /for the first$10,000 and
$1.54 /for each additional$100 or fraction
thereof,to and including$25,000.
$25,000.01 to$50,000.00 $379.50 /for the first$25,000 and
$1.45 /for each additional$100 or fraction
thereof,to and including$50,000.
$50,000.01 and over $742.00 /for the first$50,000 and
$1.20 /for each additional$100 or fraction thereof.
Restricted Energy 6/27/2000
Residential Energy Use,for all systems combined $75.00
Commercial Energy Use,for each system $75.00
Sanitary Sewer Inspection Fee 6/6/2000
Residential $35.00
Commercial $45.00
Industrial $75.00
Site Work/Grading Permit Fees 10/1/2009
Based on pr jea wblalion-See Baiilding Peonit Fees(LVex Coinniercinl).
Page 17
Deparb*ent , ..; Effective Date
Miscellaneous Fees
.administrative fee to change issued permits,including but not limited to:
Address change (minimum charge-one-half hour) $90.00 per hour 7/1/2014
Contractor change(minimum charge-one-half hour) $90.00 per hour 7/1/2014
Process and handling fee to mail permits with plans $5.00 7/1/2014
Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000
Single&Two Family Dwellings $100.00
Apartment Houses&Social
Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3
Hotels $160.00 /plus$5 for each dwelling unit in excess of 5
Information Processing&Archiving(IPA)Fee $2.00 /sheet larger than 11"Z 17" 7/1/2010
$0.50 /sheet 11"117"and smaller
Investigation Fee $90.00 per hour(average cost) 1/1/2014
(rrrirtimnm change: one-half hoeu)
Phased Occupancy $200.00 6/27/2000
Permit or Plan Review Extension $90.00
Tempore Occupancy $90.00
Other Inspections&Fees:
1. Inspections outside of normal business hours 10/1/2009
(minimum charge-2 hours) $90.00 per hour
2 Reinspection fees $90.00 per hour 10/1/2009
3. Inspections for which no fee is specifically 10/1/2009
indicated(minimum charge:one-half hour) $90.00 per hour
4. Additional plan review required by changes, 10/1/2009
additions or revisions to plans (minimum
charge:one-half hour) $90.00 per hour
Nate: A 12%surcharge fee as mandated by the State Building Coder Division is applied to allpei-wit fees,investigation fees and inspection fees listed above.
Page 18
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Accessory Residential Units $253 7/1/2017
Annexation $3,390 7/1/2017
A
�ppeal
Directors Decision (Type II)to Hearings Officer $250 7/1/2011
Expedited Review(Deposit) $300 7/1/2016
Hearings Referee $616 7/1/2017
Planning Commission/Hearing's Officer to
City Council $3,409 7/1/2017
Approval Extension $361 7/l/2017
Colocation(of Wireless Communication Facilities 7/1/2013
Conditional Use
Initial $6,749 7/1/2017
,Nlajor Dlodification $6,749 7/1/2017
\linor Modification $739 7/1/2017
Design Evaluation Team(DET
Recommendation(deposit) $1,884 7/1/2017
Development Code Provision Review
Single-Family Building Plan $91 7/1/2017
New/,Ndditions/.A,ccessory(including,but not
limited to,garages,carports,porches,patios,decks,
storage sheds,awnings,steps and ramps)
Commercial/Industrial/Institution-New $361 7/1/2017
Commercial/Industrial/Institution—
Tenant Improvements in Existing Development
Project Valuation up to$4,999
Project Valuation$5,000-$74,999 $91 7/1/2017
Project Valuation$75,000-$149,999 $226 7/1/2017
Project Valuation$150,000 and more $361 7/1/2017
Page 19
Depart rtt 1kev e i e Rate
„ . ..w .„ ..,._ ,�. b. _ M .
Downtown Review
Downtown Review Compliance Letter $124 7/1/2017
Downtown Design Administrative Review
Under$1,000,000.00 $1,727 + 0.004 x project valuation 7/1/2017
$1,000,000.00 and over(max fee$25,000.00) $6,659 +0.002 x project valuation 7/1/2017
Downtown Design Review-Design Review Board $3,504 +applicable Type II fee 7/1/2017
Hearing Postponement $411 7/1/2017
Historic Overlay/Review District
Historic Overlay Designation $5,277 7/1/2017
Removal Historic Overlay Designation $5,277 7/1/2017
Exterior Alteration in Historic Overlay District $791 7/1/2017
New Construction in Historic Overlay District $791 7/1/2017
Demolition in Historic Overlay District $791 7/1/2017
Home Occupation Permit
TypeI $125 7/1/2017
Type II $303 7/1/2017
Interpretation of the Community Development Code
Director's Interpretation $739 7/1/2017
_Appeal to City Council $3,409 7/1/2017
Land Partition
Residential and Non-Residential(3 Lots) $4,884 7/1/2017
Residential and Non-Residential(2 Lots) $4,061 7/1/2017
Expedited $5,699 7/1/2017
Final Plat $1,134 7/1/2017
Lot Line Adjustment $739 7/1/2017
Marijuana Facility Permit $721 7/1/2017
Minor Modification to an Approved Plan $739 7/1/2017
Non-Conforming Use Confirmation $739 7/1/2017
Page 20
Depa
plate
Planned Development
Conceptual Plan Review $9,388.00 7/1/2017
Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee plus$93.00 per lot 7/1/2016
Detailed Plan Review(Separate Hearing) _Applicable SDR Fee plus$93.00 per lot 7/1/2016
Pre-Application Conference
Type III or IN' $726 7/1/2017
Type I or Type II $303 7/1/2017
Sensitive Lands Review
With Excessive Slopes/Within Drainage Ways/ $739 7/1/2017
Within 100-Fear Floodplain (Type I)
With Excessive Slopes/Within Drainage Ways/ $3,242 7/1/2017
Within Wetlands (Type II)
With Excessive Slopes/Within Drainage Ways/ $3,502 7/1/2017
Within yY'etlands/Within the 100-fear
Floodplain(Type III)
Sign Permit
Existing and Modification to an Existing Sign
(No Size Differential) $203 7/1/2017
Temporary Sign(Per Sign) $64 7/1/2017
Site Development Review&Major Modification
Under$1,000,000.00 $5,726 7/1/2017
$1,000,000.00/Over $7,439 7/1/2017
(+$6.00/per each$10,000.00 over$1,000,000.00)
Minor Modification $303 7/1/2017
Subdivision
Preliminary Plat $8,988 plus$93.00 per lot 7/1/2017
Expedited Preliminary Plat $7,579 plus$93.00 per lot 7/1/2017
Final Plat $2,286 7/1/2017
Plat Name Change $413 7/1/2017
Page 21
De at ent Eff"five Date
TemporaryUse
Director's Decision $361 7/1/2017
Special Exemption/Non-Profit
Special Mixed Use-Central Business District Zone Rate
lst Temporary Use in a Calendar Year $361 7/1/2017
2nd Through 5th Temporary Use With Substantially the
Same Site Plan Within A Calendar Year $64 7/1/2017
Urban Forestry
Type I Modification to the Urban Forestry Plan
Component of an Approved Land Use Permit $711 7/1/2017
Type III Discretionary Urban Forestry Plan Review
Permit with concurrent Type III review $445 7/1/2017
Type III Discretionary-Urban Forestry Plan Review
Permit without concurrent Type III review $2,742 7/l/2017
Variance/Adjustment
:administrative Variance $791 7/1/2017
Development Adjustment $361 7/1/2017
Special Adjustments
Adjustment to a Subdivision $361 7/1/2017
Reduction of:Minimum
Residential Density $361 7/l/2017
Access/Egress Standards
Adjustment $791 7/1/2017
Parking.adjustments
Reduction in Minimum or Increase
In Maximum Parking Ratio $791 7/1/2017
Reduction in New or Existing
Development/Transit Imprvmnt $791 7/1/2017
Reduction in Bicycle Parking $791 7/1/2017
Alternative Parking Garage
Layout $791 7/1/2017
Reduction in Stacking Lane
Length $361 7/1/2017
Sign Code Adjustment $791 7/1/2017
Street Improvement Adjustment $791 7/1/2017
Wireless Communication Facility Adjustments
Setback from Nearby Residence $791 7/1/2017
Distance from Another Tower $361 7/1/2017
Page 22
De. aye t . . e
Zoning Map/Text Amendment
Legislative-Comprehensive Plan $11,335 7/1/2017
Legislative-Community Development Code $4,627 7/1/2017
Quasi-judicial $4,264 7/1/2017
Zoning Analysis(Detailed) $739 7/1/2017
Zoning Inquiry Letter(Simple) $108 7/1/2017
COMMUNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES
Plan Copies $2.50 7/l/2007
Community Development Code
CD Rom $10.00
Tigard Comprehensive Plan
$75.00 7/1/2011
GIS Maps*
8-1/2"x 11"
Non Aerial $2.50 7/1/2011
Aerial $4.00 7/1/2011
11"x 17"
Non Aerial $5.00 7/1/2011
Aerial $7.00 7/1/2011
17"x 22"
Non Aerial $11.00 7/1/2011
Aerial $15.00 7/1/2011
34"x 44"
Non Aerial $25.00 7/1/2011
Aerial $30.00 7/1/2011
Custom Maps Staff Hourly Rate
Information Processing&Archiving(IPA)Fee
Temporary Sign $5.00 7/1/2010
Type I Review $18.00 7/1/2010
Type II Review $175.00 7/1/2010
Type III Review $200.00 7/1/2010
Type IN'Review $200.00 7/1/2010
Neighborhood Meeting Signs Land Use) $2.00 1997
Page 23
Dea x a a ,� v Date
Oversize Load Permit $200.00 7/1/2005
Planimetric Mans
Blueline print-quarter section $5.00
Mylar-quarter section $150.00 /+ reproduction cost
Retrieval of Materials Confiscated in ROW
Lawn and A-board signs $40.00 /sign 7/1/2010
Other signs and materials (based on size and value) City Manager's Discretion(per TMC 7.61.035 Ord 10-06) 7/1/2010
Tigard Transportation System Plan $75.00 7/1/2011
Washington Square Regional Center 1999
Task Force Recommendations $10.00
Master Plan Map (Zoning/Plan) $2.50
Per Ord 03 >9,lee i.,xlju,leel yearl7 barer/on lbe Con.dmdion Cov LLede.-liar die Lilp o/.S ealde a,r pvrbAUed in lbe Ipril i.cvre nl Ln1,ineenn{1Neas Remtzl.
Page 24
Kgpe c_ Date
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Blasting Permit* 5384 7/l/2017
Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998
if sewer was available
(�%W-CBD zone only) the current Washington County:Assessor-determined
real market value of the land(not improvements)by I Wo
Sanitary Sewer Connection Fee S5,500 /dwelling unit 7/1/2017
(This fee is determined by Clean Water Services.
The City of Tigard receives 3.99%of fees collected.)
Water Quality Facility Fee Fee set by Clean Water Services)*** 7/1/2017
(Cin,receives 100%of fees collected)
Residential Single l,amily S238.50 /unit
Commercial&tilulti-family S238.50 /2,640 sq. ft of additional
impervious surface
Water Quantity Facility Fee(Fee set by Clean Water Services)*** 7/1/2017
(City receives 100%of fees collected)
Residential Single family S291.50 /unit
Commercial&iAlulti-family S291.50 /2,640 sq. ft of additional
impervious surface
Metro Construction Excise Tax 12%of building permits for projects 7/l/2006
(City will retain 5%for administrative expenses) with a total valuation of S100,001 or more;
(Tax set by Nleto,but collected by cities) not to exceed S12,000.
School District Construction Excise Tax
(City will retain 4%for administrative expenses)
(Tax set by school districts based on ORS 320.170-189 and collected by cities)
Beaverton School District 51.26 /sq. ft. residential construction 7/1/2017
50.63 /sq.ft. non-residential construction 7/l/2017
S31,400 Non-residential maximum per building permit or 7/1/2017
per structure,whichever is less
Tigard-Tualatin School District 51.23 /sq. tit.residential construction 1/1/2017
S0.61 /sq. ft. non-residential construction 1/1/2017
S30,700 Non-residential maximum per building permit or 1/1/2017
per structure,whichever is less
Page 25
scm�t+ e c Effective Date
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Urban Forestry*
I Iazard''rec Dispute Resolution Fee 5174 + S55.00 each additional tree 7/1/2017
In Lieu of planting Ices(Planting&3 Year Nlaintenancc)
Street'Free S566 per 1.5"caliper tree 7/1/2017
Open Grown Trcc 5566 per 1.5"caliper tree 7/1/2017
Stand Grown'Trec S403 per tree 2'in height or 1 gallon container 7/1/2017
'free permit bees(Complex)
City Hoard or Committee S310 7/1/2017
City Nlanager
Tree Canopy Fee S2.95 per square foot of tree canopy 3/1/2013
Urban Forest Inventory Ices
()pen Grown Trcc S156 + S28.00 each additional tree 7/1/2017
Stand of'1'rces 5306 +S44.00 tach additional stand 7/1/2017
Trcc I?stablishmcnt Bond(Planting&I?arly I"stablishment)
1.5"Caliper Minimum Street or Open
Grown'Trec in Subdivisions or Nlinor
Land Partitions S516 per tree 7/1/2017
1.5"Caliper Nlinimum Street or Open
Grown'l'rcc in land Usc Rcview''vpcs
other than Subdivisions or Nlinor band
Partitions S465 per tree 7/1/2017
2'in I Icight or 1 Gallon Container
Nlinimum Stand Grown Trec in
Subdivisions or Nlinor Land Partitions 5387 per tree 7/1/2017
2'in I fcight or 1 Gallon Container
Nlinimum Stand Grown"Trcc in land Usc
Rcvicw Types other than Subdivisions or
Nlinor land Partitions 5369 per tree 7/1/3017
Vacation(Streets and Public Access)* 52,735 /deposit+actual costs 7/l/2017
*Per Ord 03-i%,lee i,aellusted nearly baarl on the C"/"o-fie",Civ/h de.\/or/he C.i/y o1.1'ealde au pldbti vhed io Me l piil ione o17sn;ineering Neu:c Keawerl.
**5310.00 per npe alp to and int htdi q 10 trees.If over 10 trees,the applice nt submits a deposit of 5310.00 for each nee over 10 nees sip to a maximum o_f,55,000.00. The applicant is charged aaaial sta(J lime to
pro,ess the pemit and will he refunded the balance of the deposit if wiy remains after the inview i;.complete
*** This fee is detemined by Clean IT titer Sei ntvs.
page 26
Dgpcut l4 .. vw, �'
,« �_�:. CEiye Date
PUBLIC WORKS-DEVELOPMENT ENGINEERING
Addressing_Assignment Fee 530.00 Res.99-08
$50.00 /lot or suite(up to first 20) 8/1/2017
$25.00 /lot or suite(for 21 and greater) 8/1/2017
Early Addressing Request $250.00 Prior to Plat Approval 8/1/2017
Erosion Control Inspection Fee
With Development
Construction Cost 1?stimatc SO-S25,000 S80.70 IG,i\w/Clean Water Service 7/1/2014
Construction Cost 1?stimateS25,001-S50,000 5707.60 7/l/2014
Construction Cost I?stimatc 550,001-SI00,000 5161.40 7/1/2014
Construction Cost h;stimate over 5100,000 S161.40 plus S75 per 5100,000 or fraction thereof 7/1/2014
exceeding the first S100,000
Without Development
0-0.99acres S322.80 7/1/2014
1aere of greater S322.80 plus S150 per acre or fraction thereof 7/l/2014
1Zcinspeetion Fcc S96.84 per hour with a minimum of 1 hour 7/1/2014
plan Check included in inspection fee 7/1/2014
plan ltesubmittal Review S96.84 per hour with a minimum of 1/2 hour 7/1/2014
Fee In Lieu Of Bicycle Striping
8-inch white stripe S2.69 /linear foot of frontage 7/1/2014
Bike lane legends S188.30 /each 7/1/3014
Directionalminiarrows 5107.60 /each 7/1/2014
I\lono-directional reflective markers 54.30 /each 7/1/2014
Fee In Lieu of Construction of an Onsite Stormwater Quality Facility
$1.00 /per sq.ft.of untreated impervious area 8/1/2017
Fee In Lieu Of Undergrounding SOA CDC 18.180.120 1 ,4?%n
$65.00 /lineal ffoot of frontage 8/1/2017
Public Facility Improvement-LIDA*Permit $300.00 /equivalent dwelling unit(EDU) 8/1/2017
for review and inspection of LIDA on single lots
*-LIDA+Low Impact Development Approaches per Clean Water Services Design and Construction Standards
Public Facility Improvement Permit 2%plan review plus 7/l/2009
5%of estimated cost of public improvement with a 7/l/2005
S300 minimum
Advanced deposit of 10%of the above or minimum of$300
page 27
Dep# tvz� r c, l �fee>ave})ate
Reimbursement District Application Fee S300.00 1/27/1998
Reimbursement District Fee Not to I?xcced 56,000.00 unless reimbursement fcc exceeds S15,000.00. Res.98-03 7/1/3001
:Any amount over 515,000.00 shall be reimbursed be the owner,S6,000.00 limit
valid for only 3 years from Council approval of district cost.
Streetlight Energy&Maintenance Fee Based upon PGI:Schedule#95 Option",A"for the first two years costs PGI? 2000
Traffic/Pedestrian Signs Cost of materials and labor Dept.Policy 2/7/2002
with Council Direction
Page 28
� >fective Date
PUBLIC WORKS-UTILITIES
Booster Pump Charge
Meter Size(diameter inches)
5/8x3/4 S5.15 /monthhv 1/1/2015
3/4 x 3/4 57.42 /monthly 1/1/2015
1 513.72 /monthly 1/1/2015
1.5 S41.16 /monthh 1/1/2015
2 566.82 /monthly 1/1/2015
3 S117.83 /monthly 1/1/2015
4 S241.65 /monthly 1/1/2015
6 S257.23 /monthly 1/1/2015
8 S411.57 /monthly 1/1/2015
10 5804.11 /monthly 1/1/2015
12 S1,157.91 /monthly 1/1/2015
Page 29
Ile
e to
Customer Chante
(Basicfee chm,�ed to tastoiners to haoe the
Cil),definer water.)
Meter Size(diameter inches)
5/8 x 3/4 S27.54 /monthly 1/1/2017
S28.44 /monthly 1/1/2018
529.36 /monthly 1/1/2019
3/4 x 3/4 S39.67 /monthly 1/1/2017
S40.96 /monthlv 1/1/2018
S42.29 /monthiv 1/1/2019
1 S61.78 /monthly 1/1/2017
563.79 /monthly 1/l/2018
565.86 /monthly 1/1/2019
1.5 5163.16 /monthly 1/1/2017
5168.46 /monthly 1/1/2018
$173.93 /monthly 1/1/2019
2 S264.72 /monthly 1/1/2017
S273.32 /monthly 1/1/2018
S282.20 /monthlv 1/1/2019
Page 30
3 5521.06 /monthly 1/1/2017
5537.99 /monthly 1/1/2018
S555.47 /monthly 1/1/2019
4 S989.75 /monthly 1/1/2017
S1,021.92 /monthly 1/1/2018
51,055.13 /monthly 1/1/2019
6 S1,109.76 /monthly 1/1/2017
S1,145.83 /monthly 1/1/2018
51,183.07 /monthly 1/1/2019
8 S1,733.24 /monthly 1/1/2017
51,789.57 /monthly 1/1/2018
S1,847.73 /monthly 1/1/2019
10 53,198.25 /monthly 1/1/2017
$3,302.19 /monthly 1/1/2018
53,409.51 /monthly 1/1/2019
12 54,525.31 /monthly 1/1/2017
S4,672.38 /monthly 1/1/2018
S4,824.23 /monthly 1/1/2019
Page 31
De artment _ y
Final Notification Process Fee S10.00 /per instance 10/19/3016
Fire Hydrant Flow Test S375.00 /test 7/1/2016
Fire Hydrant Usage-Temporary
3"hydrant meter deposit* S650.00 9/1/3003
"Deposit is refundable if returned in good condition
Hook-up service S50.00 2/27/2001
Continued use S50.00 /month 3/27/2001
Consumption Current irrigation water usage rate 9/l/2002
per 100 cubic feet of water used
Fire Rates(Sprinklers)
6"or smaller 518.69 /month 7/1/3017
8"or larger S24.73 /month 7/1/2017
Fire Service Connection S1,511.74 /+ 12%fee based 7/1/2017
on construction costs.
Meter Disconnection Actual labor and material costs + 10% 9/1/2002
Meter Installation Fees
5/8"x 3/4" Meter S392.00 7/1/3017
3/4"x 3/4" Meter S448.00 7/1/2017
1"Dieter $616.00 7/1/3017
1 1/2"'Meter S952.00 7/1/2017
2"Dleter S1,232.00 7/1/3017
3"or more Dieter actual labor&materials+ 10% 9/1/2011
Meter Out-of-Order Test Nleter calibration cost+actual labor 9/l/2002
and material costs+ 10%
Sanitary Sewer Service(Fee set by Clean Water Services)
(Cita receives 20%of fees collected)
Base Charge S29.49 /dwellingunit/month 7/1/2017
Use Charge 1.95 /100 cubic feet/month for 7/1/2017
individual customer winter average
Page 32
Effective Date
Tigard Sewer Surcharge S2.11 /dwelling unit/month 7/1/2017
Service Installation Fees
Single Trench-Single Residential Service 53,695.00 includes labor c&materials 7/1/2016
1 1/2"Dieter and greater Actual labor and material costs+ 10% 10/1/2011
Storm and Surface Water(Fee set by Clean Water Services)
(Cite retains 75%of Service Charge fees collected)
(City retains 100%of its Surcharge fees collected)
Service Charge S8.25 /ESU/month 7/1/2017
Tigard Stormwater Surcharge 52.00 /ESU/month 7/1/2009
Water After Hours Emergency Turn On Service* S65.00 7/l/2017
*Service Hours Outside of Monday through Friday 8:00 am-5:00 pm
Water Bacteriological Quality Testing
Cost per test 565.00 7/1/2016
Water Disconnection Charge for Non-payment
During business hours S50.00 2/27/2001
Water Line Construction-New Development 12%of Actual Cost 2/27/2001
Water Main Extension
Designed and installed by others 12%of.Actual Cost 9/l/2002
Water Usage Charges
Residential
Tier 1 S3.56 /100 cubic feet of water 1/1/2017
Tier 2 55.20 /100 cubic feet of water 1/1/2017
'Tier 3 S5.95 /100 cubic feet of water 1/1/2017
Tier 1 $3.68 /100 cubic feet of water 1/1/2018
Tier 2 55.37 /100 cubic feet of water 1/1/2018
Tier 3 S6.14 /100 cubic feet of water 1/1/2018
Page 33
De arftnC1Yt
Effective Date
Tier 1 S3.80 /100 cubic feet of water 1/1/2019
Tier 2 55.54 /100 cubic feet of water 1/1/2019
Tier 3 S6.34 /100 cubic feet of water 1/1/2019
Multi-Family
Tier 1 S2.96 /100 cubic feet of water 1/1/2017
'Tier 2 S4.33 /100 cubic feet of water 1/1/2017
Tier 3 S4.96 /100 cubic feet of water 1/1/2017
Tier 1 53.06 /100 cubic feet of water 1/l/2018
Tier 2 54.47 /100 cubic feet of water 1/1/2018
Tier 3 S5.12 /100 cubic feet of water 1/1/2018
Tier 1 53.16 /100 cubic feet ofwater 1/1/2019
Tier 2 S4.62 /100 cubic feet of water 1/1/2019
Tier 3 S5.29 /100 cubic feet of water 1/1/2019
Commercial
Tier 1 S4.05 /100 cubic feet of water 1/1/2017
Tier 2 55.91 /100 cubic feet of water 1/1/2017
Tier 3 S6.75 /100 cubic feet of water 1/1/2017
Tier 1 S4.18 /100 cubic feet of water 1/1/2018
Tier 2 S6.10 /100 cubic feet of water 1/1/2018
Tier 3 S6.97 /100 cubic feet of water 1/1/2018
Tier 1 S4.32 /100 cubic feet of water 1/1/2019
Tier 2 56.30 /100 cubic feet of water 1/1/2019
Tier 3 57.20 /100 cubic feet of water 1/1/2019
Page 34
T}e ar ttmeni .,,P.
Effective Hate
RO
Industrial Uniform Rate S5.64 /month1v 1/1/2017
S5.82 /monthly 1/1/2018
S6.01 /monthly 1/1/2019
Irrigation Uniform Rate 58.00 /monthly 1/l/2017
S8.26 /monthly 1/1/2018
S8.53 /monthly 1/1/2019
Tiered Rate Structure Thresholds (100 cubic feet of water)
Meter Size
5/8 x 3/4 Tier 1 6 ccf
Tier 2 15 ccf
"Pier 3 over 15 ccf
3/4 x 3/4 Tier 1 9 ccf
Tier 2 22 ccf
Tier 3 over 22 ccf
1 Tier 1 16 ccf
Tier 2 40 ccf
Tier 3 over 40 ccf
1.5 Tier 1 48 ccf
Tier 2 120 ccf
Tier 3 over 120 ccf
2 Tier 1 78 ccf
Tier 2 195 ccf
Tier 3 over 195 ccf
3 Tier 1 137 ccf
Tier 2 344 ccf
Tier 3 over 344 ccf
4 Tier 1 282 ccf
Tier 2 705 ccf
Tier 3 over 705 ccf
Page 35
I is nnexri ev tt ee F qtr Effeetive Date
6 Tier 1 300 ccf
Tier 2 750 ccf
Tier 3 over 750 ccf
8 Tier 1 480 ccf
Tier 2 1,200 ccf
Tier 3 over 1,200 ccf
10 Tier 1 938 ccf
Tier 2 2,345 ccf
Tier 3 over 2,345 ccf
12 Tier 1 1,350 ccf
Tier 2 3,376 ccf
Tier 3 over 3,376 ccf
Street Maintenance Fee(TMC 15.20)
Monthly Residential Rate-Single and Multi-Family S6.56 /unit 1/1/2017
S6.69 /unit 1/1/2018
Monthly Non-Residential Rate S2.15 /per min required parking space 1/1/2017
S2.19 /per min required parking space 1/1/2018
Staff Review No Charge
City Council Written Appeal Filing Fee 5300.00
Tigard Transportation Utili, Fee liver Terrace) S5.00 /month 10/1/2016
Meter Maintenance Fee(TMC 12.01) S30.00 per required service 10/19/2016
Page 36
Dvampgat I rl� g tzt l 1S Effective Date
PUBLIC WORKS-PARKS&RECREATION
Community Garden Plot Rental
f rr S4{>.H41exf
Srm11 520.0(
Large(>120 sq.ft.) $60.00 /year 8/1/2017
Medium(60-119 sq.ft.) $45.00 /year 8/1/2017
Small(<60 sq.ft.) $30.00 /year 8/1/2017
Non-resident fee(additional Metzer School Par$5.00 /plot/year 8/]/2017
Park Reservation Fees
Application Fcc
Resident 525.00 /pereA-ent 7/l/2010
Nun-Resident 550.00 /per event 7/1,2010
Renml Change Fee 575.00 /per dent 7;1 i2011
Organized Group FVCut Proecssiug FCC 550.00 per event 7/1,/2012
]dentAlonitor 515.00 'hour 7/1i2(112
Special Use/;Alcohol permit Fee 525.00 /per event 71/11/2010
(I44e ai ire ed ail lime til re.rera[iov)
Special kvent Permit Fee(First 3 hours) 575.00 0 to 100 people 7/1!2013
5775.00 101 to 200 people 7/1/2013
$275.011 201 to 5(N)people 7/1%2013
5475.011 501 to 2000 people 7/1/2013
S1,000.00 200 and more 7,,11/2013
(I(aehAdditionalIIour) 525.00 0to100people 7/1/2013
555.00 101 to 200 people 7/1,/2013
590.00 201 to 500 people 7,,1/2013
$155.00 501 to 2000 people 7./1/2013
5330.00 2001 and more 7/1 13013
Shelter Rental Ices(2 hour minimum)
Shelter#2
Resident 535.00 /hour 7/1/2012
Non-Resident '70.00 /hour 7/1/2012
Shelter#1,#3,#4,Bishop/Seheckh Paiiliun,&Summerlake
Resident 525.00 /hour 7./1/2012
Non-Resident 550.110 ,'hour 7/1;2012
Soccer/Ball Field Rcntal Fee(2 hour minimum)
Rceident 510.00 /hour 7/t/2010
Non-Resident 520.00 /hour '/1/20111
Fanno Creek House Rental Resident $55.00 /hour 8/1/2017
Non-Resident $95.00 /hour 8/1/2017
Resident $400.00 /day 8/1/2017
Non-Resident $700.00 /day 8/1/2017
Page 37
Dirksen Nature Park Meeting Room
Resident $45.00 /hour 8/1/2017
Non-Resident $75.00 /hour 8/1/2017
Resident $400.00 /day 8/1/2017
Non-Resident $700.00 /dav 8/1/2017
Classroom
Resident $40.00 /hour 8/1/2017
Non-Resident $70.00 /hour 8/1/2017
Resident $300.00 /day 8/1/2017
Non-Resident $500.00 /day 8/1/2017
(2nd Room 50%discount)
Room Rental Monitor For Hours Outside City Business Hours $15.00 /hour 8/1/2017
Refundable Sccurtw/Cleaning Deposit Mae be required for some cN cnts to mitigate Not to eNcced 5400 7,'1./2010
possible cleanup and/or damages.
Page 38
. �
..
PUBLIC WORKS-PARKS
Parks&Recreation Fee(TMC 3.70)3.70)
Monthly Residential Rate-Single and Multi-Family $4.00 /equivalent dwelling unit 7/1/2017
,'Monthly Non-Residential Rate $4.00 equivalent dwelling unit R3 7/l/2017
Reduction for Qualified Low Income Single Family 50% 4/1/2016
Notes:
1 Commercial EDU Calculation(rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee ' 0.76 )obs Per Stall)/15 EDU Factor =EDUs
2 Industrial EDU Calculation (rounded to nearest whole EDU):
(Billed Parking Stalls from Street Maintenance Fee* 1.19 Jobs Per Stall)/15 EDU Factor = EDUs
Calculation of the annual Park Maintenance Fee Index(from FCS Group report"Tigard Parks Maintenance Fee:
Report to Council for January 12,2016 Public Hearing"
Cost Center Annual Rate Weight
Personnel 4.80% 0.60
Services/Utilities 3.00% 0.25
Materials/Internal Services 4.20% 0.15
Annual Index(Weighted Average) 4.26%
TMC 3.75.050.D authorizes the establishment of a program to reduce the Park Maintenance Fee for low income individuals
responsible for paving the utility bill.
The reduction will last for 12 billing cycles after which the fee reduction will end or the responsible party can reapply
To(qualify for the reduction,the responsible party:
1 Must be the individual(s)on the utility bill
2 Provide documented proof of income such as most recent tax statement or W-2.
3 Have an income at,or below,50%of the Median Income for Oregon as set by the US Department of Housing
and Urban Development(HUD).
Page 39
Revue ,� e €mate
Solid Waste Collection Rates
Residential Cart Collections
Recycling only(carts&yard debris cart) $13.58 1/1/2017
$13.87 1/1/2018
(recycling cart only) $7.28 1/1/2017
$7.43 1/1/2018
(yard debris only) $6.30 1/1/2017
$6.43 1/1/2018
Mini cart(20 gal)with yard debris $21.83 1/1/2017
$2239 1/1/2018
without Yard debris $19.39 1/1/2017
$19.80 1/1/2018
Cart(32 gal)with yard debris $24.87 1/1/2017
$25.39 1/1/2018
without yard debris $22.32 1/1/2017
$22.79 1/1/2018
Cart(60 gal)with yard debris $36.98 1/1/2017
$37.76 1/1/2018
Cart(90 gal)with Yard debris $44.15 1/1/2017
$45.08 1/1/2018
On-call service (mixed waste,recycling cart and yard debris $12.43 1/1/2017
$12.75 1/1/2018
Overload Fee (Small Extra Bag) $2.14 7/1/2017
Commercial Cart Collections
20 gallon $21.83 1/1/2017
$22.29 1/1/2018
32 gallon $24.87 1/1/2017
$25.39 1/1/2018
60 gallon $36.98 1/1/2017
$37.76 1/1/2018
90 gallon $44.15 1/1/2017
$45.08 1/1/2018
)X'eekly Collection Frequency
Every other Week One Two Three Four Five
One yard $66.44 $108.54 $202.95 $293.69 $384.44 $475.42 1/1/2017
$67.84 $110.82 $207.21 $299.86 $392.51 $485.40 1/1/2018
Page 40
Each additional $71.19 $137.32�� N$203.30 $269.30 $335.44 1/1/2017
$72.68 $140.20 $207.57 $274.96 $342.48 1/1/2018
One and 1/2 yards $78.18 $139.39 $25736 $375.03 $492.81 $610.70 1/1/2017
$79.82 $142.32 $262.66 $382.91 $503.16 $623.52 1/1/2018
Each additional $98.59 $191.63 $284.66 $377.66 $470.72 1/1/2017
$100.66 $195.65 $290.64 $385.59 $480.61 1/1/2018
Two yards $91.64 $166.84 $311.64 $456.43 $601.20 $745.98 1/1/2017
$93.56 $170.34 $318.18 $466.02 $613.83 $761.65
Each additional $126.05 $246.02 $366.04 $486.06 $606.01 1/1/2017
$128.70 $251.19 $373.73 $49627 $618.74 1/1/2018
Three yards $118.65 $221.56 $420.37 $619.08 $817.82 $1,016.64 1/1/2017
$121.14 $226.21 $429.20 $632.08 $834.99 $1,037.99 1/1/2018
Each additional $180.76 $354.74 $528.70 $702.67 $876.66 1/1/2017
$184.56 $362.19 $539.80 $717.43 $895.07 1/1/2018
Four vards $145.68 $276.30 $529.17 $781.80 $1,034.44 $1,290.81 1/1/2017
$148.74 $282.10 $540.28 $798.22 $1,056.16 $1,317.92 1/1/2018
Each additional $236.10 $463.54 $691.41 $919.31 $1,147.33 1/1/2017
$241.06 $473.27 $705.93 $938.62 $1,171.42 1/1/2018
Five yards $172.57 $331.09 $637.77 $944.45 $1,251.13 $1,557.82 1/1/2017
$176.19 $338.04 $651.16 $96428 $1,277.40 $1,590.53 1/1/2018
Each additional $290.30 $572.17 $854.06 $1,135.98 $1,417.84 1/1/2017
$296.40 $584.19 $872.00 $1,159.84 $1,447.61 1/1/2018
Sixyards $199.61 $385.55 $746.28 $1,106.88 $1,467.48 $1,828.19 1/1/2017
$203.80 $393.65 $761.95 $1,130.12 $1,498.30 $1,866.58 1/1/2018
Each additional $344.77 $680.65 $1,016.47 $1,352.33 $1,688.23 1/1/2017
$352.01 $694.94 $1,037.82 $1,380.73 $1,723.68 1/1/2018
Eight yards $253.53 $496.02 $964.58 $1,433.17 $1,901.72 $2,370.31 1/1/2017
$258.85 $506.44 $984.84 $1,463.27 $1,941.66 $2,420.09 1/1/2018
Each additional $455.24 $898.97 $1,342.78 $1,786.58 $2,230.32 1/1/2017
$464.80 $917.85 $1,370.98 $1,824.10 $2,277.16 1/1/2018
Page 41
1 yard compacted $244.22 $456.65 $660.82 $863.92 $1,069.72 1/1/2017
$249.35 $466.24 $674.70 $882.06 $1,092.18 1/1/2018
2 yard compacted $375.40 $701.17 $1,026.97 $1,352.73 $1,678.50 1/1/2017
$383.28 $715.89 $1,048.54 $1,381.14 $1,713.75 1/1/2018
3 yard compacted $498.51 $945.82 $1,392.87 $1,840.04 $2,287.38 1/1/2017
$508.98 $965.68 $1,422.12 $1,878.68 $2,335.41 1/1/2018
4 yard compacted $621.68 $1,190.63 $1,759.06 $2,327.48 $2,904.29 1/1/2017
$634.74 $1,215.63 $1,796.00 $2,376.36 $2,965.28 1/1/2018
Drop Box Collections
10 Cubic Yard Container $145.53 1/1/2017
$ 148.59 1/1/2018
20 Cubic Yard Container $145.53 1/1/2017
$ 148.59 1/1/2018
30 Cubic Yard Container $145.53 1/1/2017
$ 148.59 1/1/2018
40 Cubic Yard Container $145.53 1/1/2017
$ 148.59 1/1/2018
All Compactors $152.05 1/1/2017
$ 155.24 1/1/2018
Delivery $73.85 1/1/2017
$ 75.40 1/1/2018
Demurrage
20 Cubic Yard Container $5.43 10/20 Yard Box after 48 hours 1/1/2017
$5.54 1/1/2018
30 Cubic Yard Container $7.17 30 Yard Box after 48 hours 1/1/2017
$7.32 1/1/2018
40 Cubic Yard Container $7.17 40 Yard Box after 48 hours 1/1/2017
$7.32 1/1/2018
All Compactors $8.69 Drop Box with Lid 1/1/2017
Delivery $8.87 1/1/2018
Service Fee plus actual disposal cost and fi-airchise fee
Medical Waste Collections
On-Site Pick-up Charge $30.96 Rate is the on-site collection 1/l/2017
$31.61 1/1/2018
Disposal Cost per 17 to 31 gallon unit $22.07 charge plus the disposal cost per 1/1/2017
$22.53 1/1/2018
Disposal Cost per 43 gallon unit $26.74 medical container unit 1/1/2017
$27.30 1/l/2018
Page 42
e'Rate
Miscellaneous Service Rates
Extra mixed waste per cart-overload fee(based on 32 gallon capacity) $4.34 /occurrence 1/1/2017
$4.43 1/1/2018
Extra yard debris (manual up to 32 gallon) $3.26 /occurrence 1/1/2017
$3.33 1/1/2018
Additional pard debris service(second 60 gallon cart) $3.81 /occurrence 1/1/2017
$3.89 1/1/2018
Call back/return for pick up of inaccessible cart per service call $13.03 /occurrence 1/1/2017
$13.30 1/1/2018
Ward service rate-extra distance away from curb after first 5 feet $4.34 /occurrence 1/1/2017
$4.43 1/1/2018
Special service fees $78.20 /occurrence 1/1/2017
$79.84 1/1/2018
Account reinstatement fee $30.00 /occurrence 7/1/2014
NSF check fee $35.00 /occurrence 7/1/2014
Tire disposal Hourly Rate+ disposal fee
Solid Waste Compactor Permit $100.00
Page 43
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Park System Development Charge(SDC)*
Single Family Detached Dwelling-Reimbursement $1,351.00 7/1/2017
Single Family Detached Dwelling-Improvement $4,877.00 7/1/2017
Single Family Detached Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $1,808.00 7/1/3017
Inside River Terrace $2,242.00 7/1/2017
Multi-Family Detached Dwelling-Reimbursement $864.00 7/1/2017
Multi-Family Detached Dwelling-Improvement $3,672.00 7/1/2017
:Multi-Family Detached Dwelling-Improvement for Neighborhood Parks
Outside River Terrace $1,361.00 7/1/3017
Inside River Terrace $1,687.00 7/1/2017
Non-Residential(Per Employee) -Reimbursement $76.00 7/1/3017
Non-Residential (Per Employee)- Improvement $421.00 7/1/2017
*See methodology report used to calculate the charges.
The Park System Development Charge(Park SDC)is a City of"Tigard charge that is assessed on new
development to support the acquisition and development of parks,greenways,and paved trails,all of which
are used by residents of Tigard and by those who work here. The Park SDC is a one-time fee charged to
new development to help pay a portion of the costs associated with building additional parks and trails to
meet the needs created by both residential and commercial/industrial growth. The SDC revenues can only
be used on capacity-increasing capital improvements and cannot be used to repair existing park facilities.
Park SDCs are assessed on new residential development on a per-unit basis and against commercial and
industrial development on a per-employee basis.
The amount of the charge for each land use category is adjusted each year,effective July 1st,in
relation to two indices,one reflecting changes in development/construction costs and one
reflecting changes in land acquisition costs.
For more detailed/updated information on calculating Park SDC's see"Parks&Recreation System
Development Charge Methodology Report," by FCS Group,May 19,2015. Adopted by Ord. 15-09.
Page 44
o
PUBLIC WORKS-WATER
Water System Development Charge (SDC)*
5/8"x 3/4" Meter S8,004 7/1/2017
3/4"x 3/4"Meter S11,527 7/1/2017
1"Meter S21,352 7/1/2017
11/2" Meter 564,017 7/1/2017
2" Meter 5103,952 7/1/2017
3" Meter 5183,314 7/1/2017
4" Meter $375,955 7/1/2017
6" Meter S400,202 7/1/2017
8" Meter S640,321 7/1/2017
11-ester system connectimsgreater tban S incl)diameter,City udll forecast the demands on air average-day,peak-day,and peak-bom basis to deternii ie SDC fees.
*Asper ORS 223.304(S)Res. 10-76,the Cite will ase ENR Seattle CCI_for the month of April prior to the bndgetyear imposed.
The ENR Seattle CCI forApii12017 is 1.1%based on a 12-month average. The multiplier 1.011 is used jbr all VaterSDCf effectii,e 71112017.
page 45
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Residential Transportation System Development Charge(SDC)*
Single Family Detached Dwelling-Reimbursement $317 7/1/2017
Single Family Detached Dwelling- Improvement $5,496 7/1/2017
Single Family Detached Dwelling-River Terrace Overlay" $2,688 7/1/2017
Multi-Family Dwelling-Reimbursement $185 7/1/2017
11lulti-Family Dwelling-Improvement $3,206 7/1/2017
Multi-Family Dwelling-River Terrace Overlay $1,568 7/1/2017
*See Adopted Methodology Report used to calculate the charges.
**Based on 50%Credit Policy for the "local" elements of River Terrace Blvd.
For more detailed and updated information on calculating Transportation SDC's see"Transportation
System Development Charge Niethodology Report," by FCS Group,April 28,2015.
Transportation SDC Annual Adjustment 7/1/2015
Transportation SDC fees shall be adjusted annually on July 1st of each year beginning in 2016. The index to
be used for adjusting transportation SDCs will based on the weighted average of the year over year escalation
for two measurements:90 percent multiplied by the Engineering News Record Construction Cost Index for
the Seattle Area percent change plus 10 percent multiplied by the Oregon Department of Transportation
monthly asphalt price (annualized)percent change.
Page 46
De �t a Date
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING
Countywide Transportation Development Tax(TDT)-(Example Land Uses and Charges")
Single Family Detached $8,458 /per unit 7/1/2017
_Apartment $5,533 /per unit 7/1/2017
Residential Condominium/Townhouse $5,059 /per unit 7/1/2017
General Office Building $8,876 (perTSFGFA") 7/1/2017
Shopping Center $11,613 (per TSFGLA ") 7/1/2017
The Countywide Transportation Development Tax(TD'1�is a Washington County Tax approved by the voters in November,
2008,that is administered and collected by the City of Tigard. It went into effect on July 1,2009,replacing the Traffic Impact Fee
(TIF)program.
Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements
needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. It provides
funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit facilities as listed
in the County's Capital Improvements Project List. The TDT is categorized as an Improvement Fee:revenue must be dedicated to
capital improvements that expand capacity and may not be used for maintenance,repair,or other non-capital improvements.
TDTs are assessed on new development on a per-unit basis. For residential uses the units are dwelling units,bedrooms,etc. For
commercial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling positions,
etc.
For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426.
" For more detailed information on calculating TDT charges and a detailed list of Land Uses and TDT charges through
6/30/2013 see Appendix B to Washington County Engrossed Ordinance 691,_august 29,2008 and the Washington County
Countywide Transportation Development Tax Manual.
"` TSFGFA = thousand square feet gross floor area;TSFGLA= thousand square feet gross leasable area.
Page 47