Loading...
Report (43) Bend Office Carlson Testin (541)330-9155 Geotechnical Office (503)601-8250 g1, Inc. Eugene Office Salem Office (541)345-0289 Tigard Office (503)689- 460 Daily Report of Proprietary Anchors (503)684-33460 Project: o/y,. . tlfL/ Q "` 4. 0 Address: --<`--as--�) _ a,'CYC l� ..r ,a CTI representative --- ,. ,f„ :ICr CTI Job#: _z_6___.<-___7,s:: �I � c� a ` was onsite this date -- "�spector Name&Cert.No.) � to perform Special Inspection for hermit ❑ DFS#(s) ---t11. -7.-20 r? --o oa q A. jurisdiction +T'ra s-c� In some cases more than one box may be checked for a given item. ' SCOPE OF INSPECTION Location of proprietary anchors inspected[to include grid 1.Checked in with superintendent or client representative. lines,elevations(floors)and drawing details]: Name: r To ... c. -iv �y, ,�, e, Company: .,/ : �� r 2.Inspection was"IBC" ❑ Continuous �r,...,„„,„,,,,,,,.4,,,,/,, ,47.,- �eriodic , •'c:�, / d.,,•..., 7 s PROPRIETARY ANCHORS " `-CF-7= e /--." CY r O Cap G.�«. -M,Reviewed previous inspection reports? Yes NoN/A /��cr� DJ ra.e7.ti IIIIIIM - ,;,::Reviewed evaluation report?. Verified ��® following items meet manufacturer's REPORT SUMMARY published installation instructions. 3. Verified minimum embedment depth of the 1. Work inspected was: Verified 111111 Completed In progress an 4.Verified installation of the anchors. 2. Completed •work inspected �'■■ in co .fiance with ❑'was ❑ was not 5. Verified anchor diameter. 6.Verified steel am �n. �` • °•roved plans and specifications grade. �t. El drawings 7.Verified hole diameter. RFI ❑ Design change uDatedl 0 N/A 8. Verified type of drill bit used. Document#(s) _ �� 9. Verified hole cleaning method. `�—d Dated: ,1 _rT_ ��= 3.Noncompliance item(s)were noted this date,details on 10. Verified adhesive application. followingn� 11. Verified edge distance. �i■ page(s). Yes Lam'lvo ❑ N/A 12.Verified spacing. Amin 4.Noncompliance item(s)were reinspected this date,details 13. Verified installation torque. [',r on following page(s). ❑ Yes ❑ �-. �� No I.� "'q IIIIIIM ❑ Conform ❑ Remain in progress Evaluation report number&date: o g Report(s)findings were discussed and left with Name of product being installed ,� °f r17 Batch Number kpiration Date ____�, s Based on the Code,approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. Inspector Signature: ^ 0 See additional report page(s). ❑ Distribute attachments. Page-- —of ______ PropAnchors Ver.1 2/12/2009 Term os Client recognizes that construction observation and/or tent orvices provided dediby CTIa aftertechniquesu which may reduce the risk of construction defects,deficti. any during ortype. Even con- with struction. Services performed by CTI do esr r'onstitC_uTt r corastru warranty defects,guarantee or deficiencies, or omissions diligent construction monitori�, and. g by in the Contractor's work may exist.in all cases,Client and/or the Contractor shall assign the Contractor the responsibility for the quality and completeness of the work and for e adheringaly to plans la ssubcontractor, and ecifica- dons. CTI's work or failure to perform same shall not y Y or supplier from performance of its work in accordance with the contract documents. nar ily CTI will provide its professional services to Client with that degree f are adsskillie odiootheriexercised warran- under similar circumstances by members of its profession.Thiss ty or representation, either expressed or implied. It is also understood d and afire 1 eeed thatstated tots mcon- ade in CTI reports are observations based on technical judgments, rts come to c;usive representations of fact. If conditions different recommended that Clirent contact CTI idicated in the mmediately to Client's attention after receipt of the rep orts,it authorize further appropriate evaluation. C";I's work shall nor include determining,supervising or implementing r ng he e tial;or means,methods,odstechniques,job sequences or procedures of construction.CTI shall not be responsible s related to health,safety or welfare.