Structural Calculations
Helical Pier Foundation Repair
11560 SW 91st Ave — Tigard, OR 97223
Prepared For:TerraFirma Foundation Systems
Work Order: 21175
Date: 13 June 2017
6.is.i7
40 PRO,
'. a�. , royal@mortiereng.com
cri ;A `i' Royal Mortier, PE 2017.06.13
j `" ' 17:58:33-07'00'
r •`E'ON
S ��\F f DIGITAL SIGNATURE FOR VERIFICATION OF ELECTRONICALLY
)I 9.�T <. s/ TRANSIMITTED DOCUMENTS ONLY. SIGNATURE WILL AUTOMATICALLY
()rIA( trACW VOID IF DOCUMENT IS MANIPULATED ELECTRONICALLY.
EX�'I"t EE 2 1 N Royal Mortier,P.E.
144 EAST 14TH AVE — EUGENE, OREGON 97401 P: (541)484-9080 — F: (541)684-3597
Table of Contents
Structural Calculations
Helical Pier Foundation Repair
11560 SW 91st Ave. - Tigard, OR 97223
Prepared For:Terra Firma Foundation Systems
Work Order: 21175
Date: 13 June 2017
Subject Page
Helical Pier Vertical Design—Exterior Bearing Wall
Overview 1
Loading 2
Shaft Capacity 3
Helix Capacity 4
Existing Footing Capacity 5
Helical Pier Vertical Design—Gable End Wall
Overview 6
Loading 7
Shaft Capacity 8
Helix Capacity 9
Existing Footing Capacity 10
Plans
S1—Foundation Plan 11
S2—Roof Plan 12
S3—Section 13
S4—Helical Pier Details 14
S5—Helical Pier Details 15
144 EAST 14TH AVE — EUGENE,OREGON 97401 P: (541)484-9080 — F: (541)684-3597
0 Ik.I.J�, WORK ORDER# PAGE#
_�• -�- mr,. CALCULATIONS
-' rt STRUCTURAL 21175 2
i A BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
1lis:.� CODE CONSULTANT • PLAN CHECKING 1156091st Ave,Tigard,OR /
�:�. CONSTRUCTION INSPECTION FS DATE
FS HP288 Helical Repair for SFD 6/13/2017
Structural Design Narrative
The structural calculations enclosed are in reference to the design of remedial foundation supports for the residence referenced on the
cover page.The helical pile system and brackets are designed as foundational supports for the residence to resist loading from the
roof,floor,wall,concrete foundation,and concrete slab loading. Helical piles are continuously hydraulically torqued until a load
bearing stratum is encountered. It is recommended that the piles be installed at a rate equal to the pitch of the helix plate with no
more than 25 revolutions per minute. Confinement of the pile is provided by lateral earth pressures,and an additional external sleeve
is used to resist possible eccentric loading. Once all piles are placed to minimum installation torque,they are loaded simultaneously
to provide stabilization and/or lifting of the structure,pier caps are then used to lock brackets in place.
FSI under-footing brackets do not require mechanical anchorage to the concrete foundation. The vertical and horizontal surfaces of
the footing and foundation wall must be smooth and clean to allow full contact with the vertical and horizontal bearing plates of the
under-footing bracket. Bracket fabrication welding conforms to AWS D1.1 and has been performed by CWB qualified welders
certified to CSA Standard W47.1 in Division 2. Fabrication is performed by Behlen Manufacturing Company. Behlen Mfg Co.is an
ISO 9001 certified company.
Installation and design shall adhere to the requirements and regulations set forth in ICC-ES AC358 as well as ICC-ESR 3074.
Periodic special inspection will be performed and a verification letter of installation depth and pressure will be provided upon job
completion. ICC-ESR 3074 currently does not address use of this system within seismic design category D or higher. The entire
underpinning system has been reviewed and analyzed and is therefore a fully engineered system complying with all current codes and
stamped by a professional engineer. Soil conditions as noted in section 5.5 of ICC-ESR 3074 were not noted in the area. Design
reductions,corrosion considerations,and axial and bending capacities of the external sleeve have been incorporated. Concrete
foundation span capacities have been analyzed assuming lack of rebar and per ACI 318-11.
'Design Summary-Controlling Parameters
Maximum Vertical Load to Pier- 7.028 kips Pier Type Designation- HP288
Controlling Soil Condition- COHESIVE Maximum Spacing- 7 feet
Soil Capacity- 20.27 kips Installation Torque- 2100 lb-ft
Torque Correlation Capacity- 18.90 kips Pengo RS-7 Diff.Pressure 700 psi
Shaft Capacity- 60.37 kips Installation Depth- 9.00 feet
Helix Capacity- 110.00 kips Depth of Helix 1- 8.5 feet
Concrete Footing- OK Depth of Helix 2- 5.5 feet
Bracket Capacity- 25.3 kips Depth of Helix 3- N/A feet
•
Page 1
T J WORK ORDER# PAGE#
CALCULATIONS
21175 3
STRUCTURAL
BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
z CODE CONSULTANT • PLAN CHECKING 1156091st Ave,Tigard,OR /
j. .�,,.-- CONSTRUCTION INSPECTION REF DATE
��L�1't NZ� FS HP288 Helical Repair for SFD 6/13/2017
'Jurisdiction and Codes
Jurisdiction/Building Department: City of Tigard
Referenced Building Codes:
2012 International Building Code(IBC)
2012 International Residential Code(IRC)
2012 International Existing Building Code(IEBC)
2014 Oregon Structural Specialty Code(OSSC)
2014 Oregon Residential Specialty Code(ORSC)
'Estimated Loading
Dead Load:
Roof 15 psf
Wall 10 psf
Floor 12 psf
Concrete 150 psf
Live Load:
Snow/Roof 25 psf
Floor(Res) 40 psf
Vertical Design Loads(Worst Case)
Tributary Width/Anchor Spacing= 7 ft
Trib Length
RoofDL 14.5 ft = 217.5 plf Dead Load,D= 3.721 kips
RoofSL 14 ft = 350 plf Floor Live Load,L= 1.960 kips
#of Floors 1 count = 1 count Roof Snow/Live Load,S= 2.450 kips
FloorDL 7 ft = 84 plf Wind Load,+= kips
FloorLL 7 ft = 280 plf Wind Load,-= kips
Slab? N(Y/N) N (Y/N) Seismic Load,+= kips
ConcDL 0 in(thickness) = 0 plf Seismic Load,-= kips
ConcLL 0 ft = 0 plf
WalIDL 8 ft = 80 plf
FoundationDL 6 in(width) = 150 plf
24 in(heigth)
Controlling Load Combination(ASD): D+0.75L+0.75S
Maximum Vertical Load(Worst Case)= 7.028 kips
Page 2
1Z T I WORK ORDER# PAGE#
.��.�:. -f CALCULATIONS 21175 4
STRUCTURAL
BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
1 CODE CONSULTANT • PLAN CHECKING 11560 91st Ave,Tigard,OR
CONSTRUCTION CTION INSPECTION
-71.111111111111111111V\-7 REF DATE
FS HP288 Helical Repair for SFD 6/13/2017
'Design Input
Pier System Designation= HP288
Vertical Load to Pier,PTL= 7.028 kips
Minimum Installation Depth,L= 9.00 ft
Unbraced Length,1= 1.000 ft
Eccentricity,e= 6.000 in
Concrete to Steel Coefficient of Friction,µ= 0.45
Friction Factor of Safety,FS= 2.00
Normal Surface Force,F„= 3.514 kips
Vertical Component of Tieback,PTB= 0.000 kips
Design Load(Vertical+Tieback),PDL= 7.028 kips
MomentEcce„o-,ciTy= 42.168 kip-in
Momentlieback= 0.000 kip-in
MomentF,;,,;o„= 0.000 kip-in
Design Moment,Momentp1t1DL= 42.168 kip-in
Sleeve Property Input
Sleeve Length= 30 in
Sleeve OD= 3.500 in
Design Wall Thickness= 0.201 in
Sleeve Design ID 3.098
A= 2.082 in'
I= 2.843 in'
S= 1.625
Z= 2.189 in'
r= 1.169 in
E= 29000 ksi
FY= 60 ksi
(Pier Property Input
Plain Pier OD= 2.839 in *Pier properties based on 50 year corrosion loss in
Design Wall Thickness= 0.221 in thickness per ICC-ES AC358.
Plain Pier Design ID= 2.397 in
A= 1.818 in`
I= 1.568 in'
S= 1.105 in'
Z= 1.518 in'
r= 0.929 in
C= 1.420 in
k= 2.100
E= 29000 ksi
Fy= 60 ksi
(Pier Output(AISC 325-11)
kl/r= 27.13 <200-OK
F,= 319.70 ksi
4.71*(E/Fy)o'= 103.55
F„= 55.47 ksi
Pn= 100.82 kips
Safety Factor for Compression,Oc= 1.67(ASD)
Allowable Axial Compressive Strength,P„/12,= 60.37 kips
Actual Axial Compressive Demand,P,= 7.028 kips
D/tp1e,= 12.85 <.45E/Fy-OK
Mp= 222.45 kip-in
Safety Factor for Flexure,Ob= 1.67(ASD)
Allowable Flexural Strength,M„/52b= 133.20 kip-in
Actual Flexural Demand,M,= 42.17 kip-in
Combined Axial&Flexural Check= 0.37 OK
Page 3
WORK ORDER# PAGE#
�4 t: jt.
*,,.rte- r,� CALCULATIONS 21175 5
STRUCTURAL PROJECT NAME BY/CHECKED
V '' BUILDING DESIGN • FIRE PROTECTION 11560 91st Ave,Tigard,OR /
Ir 1 t CODE CONSULTANT • PLAN CHECKING REF DATE
-LILL..
.j,(''IMMIIII ` CONSTRUCTION INSPECTION FS HP288 Helical Repair for SFD 6/13/2017
'/:\.1A,\\'
(Helix Properties and Capacity
Di= 10.00in
Q1= 55 kips
Al=p*D12/4= 78.54 int HP288(Per ICC-ESR-3074)
D2= 12.00 in Capacity
Q2= 55 kips Helix dia.(in) (kips)
A2=p*D22/4-p*(Tube OD)2/4= 106.77 in` 8 55.000
D2= in 10 55.000
Q3= 0 kips 12 55.000
A3=p*D32/4-p*(Tube OD)2/4= 0.00 14 55.000
EQ= 110.00 kips
Soil-Individual Bearing Method-Cohesive or Non-Cohesive
Cohesive Non-Cohesive
Factor of Safety= 2 Factor of Safety,FS= 2
Blow Count,N= 12 Y= 120 pcf
EAh=At+A2+A3= 1.29 ft2 cp= 32 deg
Cohesion,c= 1.750 ksf Depth of Helix,D1= 8.5 ft
Nc= 9 Depth of Helix,D2= 5.5 ft
n
Qu=Eah(cNC)= 20.268 kips Depth of Helix,D3= 0 ft
Qa,compression/tension=Qu/FS= 10.134 ldps q'l=Y*D1= 1020 psf
q'2=Y*D2= 660 psf
q'3=Y*D3= 0 psf
Nq=1+0.56(12*(p)'/54= 20.04
Q1u=A1(q'iNq)= 11.148 kips
Q2u=A2(q'2Nq)= 9.806 kips
!1 Q3u=A3(q'3Nq)= 0.000 kips
Qa,compression/tension=EQu/FS= 10.477 kips
CONTROLS: COHESIVE ALLOWABLE: 10.134 KIPS OK
'Soil-Torque Correlation
Factory of Safety,FS= 2
Design Work Load,DL= 7.028 kips
Emperical Torque Correlation Factor,Kt= 9 ft-1
Final Installation Torque,T=Qu/K1= 2100 lb-ft
Ultimate Pile Capacity,Qu= 18.90 kips
Allowable Pile Capacity,la,= 9.45 kips OK
Page 4
lZ I I WORK ORDER# PAGE#
.���:•_�-�:,� CALCULATIONS
21175 6
STRUCTURALfTh-
°,' BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
�# h CODE CONSULTANT • PLAN CHECKING 11560 91st Ave,Tigard,OR
CONSTRUCTION INSPECTION REF DATE
FS HP288 Helical Repair for SFD 6/13/2017
'Estimated Footing/Foundation Wall Properties
Foundation Width,b= 6 in
Foundation Depth,d= 24 in
Cross Sectional Area,A= 144 int
Section Modulus,Sx= 576 ins
Moment of Inertia,Mx 6912 in4
Assumed Conc,fc= 2000 psi
'Footing/Foundation Wall Loading
Dead Load,DL= 3.721 kips
Factored Dead Load,DL= 4.465 kips
Floor Live Load,LL= 1.960 kips LRFD Load Factors:
Factored Floor Live Load,LL= 1.960 kips 1.2DL+I.OLL+1.6SLr
Snow/Live Roof Load,SLr= 2.450 kips
Factored Snow/Live Roof Load,SL,= 3.920 kips
Factored Total Load,W = 10.345 kips
Pier Spacing,S= 7.0 ft
Ultimate Shear(W/2),V„= 5.17 kips
Ultimate Moment(wS2/8),M„= 9.05 k-ft
'Estimated Footing/Foundation Wall Capacity(ACI 318-11)
Conc.Modulus of Rupture,fr= 335 psi
Shear Strength,Vc= 12.88 kips
Shear Redution Factor,cp= 0.75
Design Shear,cpVu= 9.66 kips OK
Cracking Moment,M,= 16.10 k-ft
Flexure Reduction Factor,cp= 0.9
Design Moment,cpM, = 14.49 k-ft OK
Page 5
Ll Vk T J i, WORK ORDER# PAGE#
`Ill. -r. CALCULATIONS
STRUCTURAL 21175 2
n_ 131 Ili '
x BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
yt �Ii-i CODE CONSULTANT • PLAN CHECKING 1156091st Ave,Tigard,OR /
= CONSTRUCTION INSPECTION
i=A I;1-V REF DATE
FS HP288 Helical Repair for SFD 6/13/2017
Structural Design Narrative
The structural calculations enclosed are in reference to the design of remedial foundation supports for the residence referenced on the
cover page.The helical pile system and brackets are designed as foundational supports for the residence to resist loading from the
roof,floor,wall,concrete foundation,and concrete slab loading. Helical piles are continuously hydraulically torqued until a load
bearing stratum is encountered. It is recommended that the piles be installed at a rate equal to the pitch of the helix plate with no
more than 25 revolutions per minute. Confinement of the pile is provided by lateral earth pressures,and an additional external sleeve
is used to resist possible eccentric loading. Once all piles are placed to minimum installation torque,they are loaded simultaneously
to provide stabilization and/or lifting of the structure,pier caps are then used to lock brackets in place.
FSI under-footing brackets do not require mechanical anchorage to the concrete foundation. The vertical and horizontal surfaces of
the footing and foundation wall must be smooth and clean to allow full contact with the vertical and horizontal bearing plates of the
under-footing bracket. Bracket fabrication welding conforms to AWS D1.1 and has been performed by CWB qualified welders
certified to CSA Standard W47.1 in Division 2. Fabrication is performed by Behlen Manufacturing Company. Behlen Mfg Co.is an
ISO 9001 certified company.
Installation and design shall adhere to the requirements and regulations set forth in ICC-ES AC358 as well as ICC-ESR 3074.
Periodic special inspection will be performed and a verification letter of installation depth and pressure will be provided upon job
completion. ICC-ESR 3074 currently does not address use of this system within seismic design category D or higher. The entire
underpinning system has been reviewed and analyzed and is therefore a fully engineered system complying with all current codes and
stamped by a professional engineer. Soil conditions as noted in section 5.5 of ICC-ESR 3074 were not noted in the area. Design
reductions,corrosion considerations,and axial and bending capacities of the external sleeve have been incorporated. Concrete
foundation span capacities have been analyzed assuming lack of rebar and per ACI 318-11.
IDesign Summary-Controlling Parameters
Maximum Vertical Load to Pier- 7.361 kips Pier Type Designation- HP288
Controlling Soil Condition- COHESIVE Maximum Spacing- 7 feet
Soil Capacity- 20.27 kips Installation Torque- 2100 lb-ft
Torque Correlation Capacity- 18.90 kips Pengo RS-7 Diff.Pressure 700 psi
Shaft Capacity- 60.37 kips Installation Depth- 9.00 feet
Helix Capacity- 110.00 kips Depth of Helix 1- 8.5 feet
Concrete Footing- OK Depth of Helix 2- 5.5 feet
Bracket Capacity- 25.3 kips Depth of Helix 3- N/A feet
Page 6
L�lZ.r I1r. WORK ORDER# PAGE#
� •�! _—_r,. CALCULATIONS
� STRUCTURAL 21175 3
BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKEDt -�4 CODE CONSULTANT • PLAN CHECKING 11560 91st Ave,Tigard,OR /
I���� CONSTRUCTION INSPECTION REF
l;�1,1,1 DATE
FS HP288 Helical Repair for SFD 6/13/2017
'Jurisdiction and Codes
Jurisdiction/Building Department: City of Tigard
Referenced Building Codes:
2012 International Building Code(IBC)
2012 International Residential Code(IRC)
2012 International Existing Building Code(IEBC)
2014 Oregon Structural Specialty Code(OSSC)
2014 Oregon Residential Specialty Code(ORSC)
'Estimated Loading
Dead Load:
Roof 15 psf
Wall 10 psf
Floor 12 psf
Concrete 150 psf
Live Load:
Snow/Roof 25 psf
Floor(Res) 40 psf
'Vertical Design Loads(Worst Case)
Tributary Width/Anchor Spacing= 7 ft
Trib Length
RoofDL 3 ft = 45 plf Dead Load,D= 3.213 kips
RoofSL 14 ft = 350 plf Floor Live Load,L= 3.080 kips
#of Floors 1 count = 1 count Roof Snow/Live Load,S= 2.450 kips
FloorDL 7 ft = 84 plf Wind Load,+= kips
FloorLL 7 ft = 280 plf Wind Load,-= kips
Slab? Y(Y/N) Y (Y/N) Seismic Load,+= kips
ConcDL 4 in(thickness) = 100 plf Seismic Load,-= kips
ConcLL 4 ft = 160 plf
Wa11DL 8 ft = 80 plf
FoundationDL 6 in(width) = 150 plf
24 in(heigth)
Controlling Load Combination(ASD): D+0.75L+0.75S
Maximum Vertical Load(Worst Case)= 7.361 kips
Page 7
T WORK ORDER# PAGE#
•�- 1t, CALCULATIONS
STRUCTURAL 21175 4
BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
CODE CONSULTANT • PLAN CHECKING 1156091st Ave,Tigard,OR
CONSTRUCTION INSPECTION
REF DATE
FS HP288 Helical Repair for SFD 6/13/2017
(Design Input
Pier System Designation= HP288
Vertical Load to Pier,PTL= 7.361 kips
Minimum Installation Depth,L= 9.00 ft
Unbraced Length,l= 1.000 ft
Eccentricity,e= 6.000 in
Concrete to Steel Coefficient of Friction,µ= 0.45
Friction Factor of Safety,FS= 2.00
Normal Surface Force,F„= 3.680 kips
Vertical Component of Tieback,PTB= 0.000 kips
Design Load(Vertical+Tieback),PDL= 7.361 kips
MomentEccentricity= 44.163 kip-in
MomentTieback= 0.000 kip-in
MomentF,ieti°n= 0.000 kip-in
Design Moment,MomentpierDL= 44.163 kip-in
Sleeve Property Input
Sleeve Length= 30 in
Sleeve OD= 3.500 in
Design Wall Thickness= 0.201 in
Sleeve Design ID 3.098
A= 2.082 in`
I= 2.843 in'
S= 1.625 in'
Z= 2.189 in
r= 1.169 in
E= 29000 ksi
Fy= 60 ksi
(Pier Property Input
Plain Pier OD= 2.839 in *Pier properties based on 50 year corrosion loss in
Design Wall Thickness= 0.221 in thickness per ICC-ES AC358.
Plain Pier Design ID= 2.397 in
A= 1.818 i`
I= 1.568 in'
S= 1.105 In'
Z= 1.518 in'
r= 0.929 in
c= 1.420 in
k= 2.100
E= 29000 ksi
Fy= 60 ksi
(Pier Output(AISC 325-11)
Id/r= 27.13 <200-OK
F,= 319.70 ksi
4.71*(E/Fy)°''= 103.55
F,= 55.47 ksi
Pr,= 100.82 kips
Safety Factor for Compression,S2c= 1.67(ASD)
Allowable Axial Compressive Strength,P„/D.,= 60.37 kips
Actual Axial Compressive Demand,P,= 7.361 kips
D/tpier= 12.85 <.45E/Fy-OK
Nip= 222.45 kip-in
Safety Factor for Flexure,Ob= 1.67(ASD)
Allowable Flexural Strength,Mn/Sl,= 133.20 kip-in
Actual Flexural Demand,Mr= 44.16 kip-in
Combined Axial&Flexural Check= 0.39 OK
Page 8
CZ [ lWORK ORDER# PAGE#
CALCULATIONS 21175 5
_ PROJECT NAME BY/CHECKED
. ..$ STRUCTURAL1+` ' BUILDING DESIGN • FIRE PROTECTION 11560 91st Ave,Tigard,OR /
t CODE CONSULTANT • PLAN CHECKING REF DATE
�rti` CONSTRUCTION INSPECTION FS HP288 Helical Repair for SFD 6/13/2017
'Helix Properties and Capacity
D1= 10.00 in
(21= 55 kips
Al=p*D12/4= 78.54 in` HP288(Per ICC-ESR-3074)
D2= 12.00 in Capacity
(22= 55 kips Helix dia.(in) (kips)
A2=p*D22/4-p*(Tube OD)2/4= 106.77 in` 8 55.000
D2= in 10 55.000
Q3= 0 kips 12 55.000
A3=p*D32/4-p*(Tube OD)2/4= 0.00 14 55.000
EQ= 110.00 kips
'Soil-Individual Bearing Method-Cohesive or Non-Cohesive
Cohesive Non-Cohesive
Factor of Safety= 2 Factor of Safety,FS= 2
Blow Count,N= 12 Y= 120 pcf
EAh=Al+A2+A3= 1.29 ft2 cp= 32 deg
Cohesion,c= 1.750 ksf Depth of Helix,D1= 8.5 ft
Ne= 9 Depth of Helix,D2= 5.5 ft
Qu=Eah(cNc)= 20.268 kips Depth of Helix,D3= 0 ft
Qa,compression/tension=Qu/FS= 10.134 kips q'l=Y*Dl= 1020 psf
q'2=Y*D2= 660 psf
q'3=Y*D3= 0 psf
Ng=1+0.56(12*1p)`°/$4= 20.04
Q1u=A1(q'iNq)= 11.148 kips
Q2u=A2(q'2N)= 9.806 kips
Q3u=A3(q'3N)= 0.000 kips
Qa,compression/tension=EQu/FS= 10.477 kips
CONTROLS: COHESIVE ALLOWABLE: 10.134 KIPS OK
'Soil-Torque Correlation
Factory of Safety,FS= 2
Design Work Load,DL= 7.361 kips
Emperical Torque Correlation Factor,K1= 9 ft-1
Final Installation Torque,T=Qu/K1= 2100 lb-ft
Ultimate Pile Capacity,Qu= 18.90 Ups
Allowable Pile Capacity,Qa= 9.45 kips OK
Page 9
Vt. j WORK ORDER# PAGE#
��`...• -f Jr CALCULATIONS 21175 6
n STRUCTURAL
1 iii BUILDING DESIGN • FIRE PROTECTION PROJECT NAME BY/CHECKED
CODE CONSULTANT • PLAN CHECKING 11560 91st Ave,Tigard,OR /
j( .1:11:11.� CONSTRUCTION INSPECTION REF DATE
j\I=:1,A
FS HP288 Helical Repair for SFD 6/13/2017
'Estimated Footing/Foundation Wall Properties
Foundation Width,b= 6 in
Foundation Depth,d= 24 in
Cross Sectional Area,A= 144 int
Section Modulus,Sx= 576 in'
Moment of Inertia,Mx 6912 in4
Assumed Conc,f,= 2000 psi
'Footing/Foundation Wall Loading
Dead Load,DL= 3.213 kips
Factored Dead Load,DL= 3.856 Ups
Floor Live Load,LL= 3.080 kips LRFD Load Factors:
Factored Floor Live Load,LL= 3.080 Ups 1.2DL+1.OLL+1.6SLr
Snow/Live Roof Load,SLr= 2.450 kips
Factored Snow/Live Roof Load,SL,= 3.920 kips
Factored Total Load,W = 10.856 Ups
Pier Spacing,S= 7.0 ft
Ultimate Shear(W/2),V„= 5.43 Ups
Ultimate Moment(wS2/8),Mu= 9.50 k-ft
!Estimated Footing/Foundation Wall Capacity(ACI 318-11)
Conc.Modulus of Rupture,f,= 335 psi
Shear Strength,Vc= 12.88 kips
Shear Redution Factor,cp= 0.75
Design Shear,cpVu= 9.66 kips OK
Cracking Moment,Mn= 16.10 k-ft
Flexure Reduction Factor,cp= 0.9
Design Moment,cpMR= 14.49 k-ft OK
Page 10
T
N ( 58-0" 1- 1.V-0"------1
ED
FOUNDATION SUPPORTWORKS W
HP288 HELICAL PIER
7'-O"o.c.MAX Q (n U W c,
PER 182/S4 • wQN
TYPICAL 10 LOC'NS (n 0 rn
QO Sp
Q L52i(
Lu
o LJ 0 <7H
a N -Z
Cal M
0
EXISTING SINGLE-STORY V-
w RESIDENCE
0
L 1
10 O O
NOTES:
1. ALL PIERS SHALL BE INSTALLED TOA MINIMUM DEPTH
OF 8'-0"BELOW GRADE. I AREA OF WORK
2. CIRCLE W/#REPRESENTS LOCATION OF FOUNDATION DIMENSIONING NOTATION
SUPPORTWORKS HP288 HELICAL PIER-LOCATIONS TAKES PRIORITY OVER
SHOWN ON PLAN ARE APPROXIMATE AND SHALL BE — SCALE. DO NOT SCALE
LIMITED BY THE MAXIMUM SPACING SHOWN IN THE DRAWINGS.
TABLE BELOW AS WELL AS THE REQUIREMENTS OF REVISIONS:
THE PROJECT PLANS AND CALCULATIONS.
3. DIMENSIONS PROVIDED ARE BASED ON TERRAFIRMA PILE TYPE HELIX PLATE SLEEVE MAX PENGO RS-7 PENGO RS-7 MINIMUM MAXIMUM
FIELD PERSONNEL OBSERVATIONS-TO BE VERIFIED CONFIGURATION LENGTH LOAD MIN.INSTALL MAX.INSTALL INSTALLATION INSTALLATION MORTIER ANG ENGINEERS
PRESSURE PRESSURE TORQUE TORQUE 1355 OAK ST,STE 200
4. UNDERFLOOR FRAMING CONFIGURATION AND EUGENE,OR 97401
ORIENTATION TO BE VERIFIED PHONE: 541-484-9080
5. EXISTING CONCRETE FOOTING AND STEM WALL HELICAL PILE 10-12 48" 7350 LB 700 PSI 2300 PSI 2100 LB-FT 7500 LB-FT FAX: 541-484-6859
(USEABLE)CROSS SECTION MUST BE A MINIMUM OF
6"X30".NOTIFY ENGINEER PRIOR TO PIER DATE:6/13/2017 BY:BS
INSTALLATION IF EXISTING FOUNDATION DOES NOT WORK ORDER NO.
MEET OR EXCEED THE MINIMUM REQUIREMENTS. 21175
6. CALCULATIONS USED IN LOADING PIER ANALYSIS AND DESIGN
CONSIDER THE MOST EXTREMEEXISTING FOUNDATION/FRAMING PLAN W/NEW PIERS
SHEET
CONFIGURATION TO BE APPLIED TO ALL PIER 1 1 OF
LOCATIONS. Scale:1/e"=1'H]" S 1
JI 5
Page 11
N (n
eLJ
> > 2>2
(n AHP
Li (0 co ET
Z wm0
1.
Q O Nap
F z Q ~
zrx
ir 0
r
..
.. DIMENSIONING NOTATION
II
TAKES PRIORITY OVER
SCALE. DO NOT SCALE
DRAWINGS.
REVISIONS:
MORTIERANG ENGINEERS
1355 OAK ST.STE 200
EUGENE.OR 97401
PHONE, 541-484-9080
NOTES: FAX: 541-484-6859
1) PIER ANALYSIS AND CALCULATIONS ASSUME ROOF O EXISTING ROOF PLAN DATE:6/13/2017 BY:BS
FRAMING CONFIGURATION SHOWN IN BUILDING Z Style:1/8"=1'-0" WORK ORDER NO.
SECTION-CONTRACTOR TO NOTIFY ENGINEER IF
'LIFT"IS ACHIEVED PRIOR TO REACHING 21175
INSTALLATION PRESSURE AND/OR SPECIAL LOADING SHEET
CONDITIONS REQUIRE A REDUCTION OF THE 2 OF
SPECIFIED INSTALLATION PRESSURE/TORQUE. S 2
J 5
Page 12