Loading...
02/18/1988 - Notice of Cancellation MEMORANDUM 'wrrr' ; CITY OF TI:GARD, OREGON TO: Tr•anspor•tation Advisory Committee ,� February 11, 1988 FROM: Randall R. Wooley, City F_nginee • ,v-w� ' SUBJECT: February and March Meetings 1. The regular meeting scheduled for February 18, 1988, is canceled. The next meeting is scheduled for• March 24, 1988. 2. Attachment A is the "short list" of possible projects for the Fiscal Year 1988-89 Capital Improvement Program. Staff is developing cost estimates and other data for• the short list- projects. At the March 24th meeting, we expect to have the data ready for• the Committee to begin the difficult process of establishing priorities for• funding. To arrive at the short list, I considered only the projects identified as "current needs" in the long list the Committee reviewed in November. From the "current needs" list I deleted: - All roads already funded. - All roads not cur•rent:ly under• City jurisdiction. - Roads where additional study is needed to determine the appropr•iat:e alignment:. - Roads where there is a potential for• funding through a local improvement district (LID) . - Roads where improvements are not currently feasible. Attachment B is an annotated list showing how projects were eliminated. Please review the short list and, if you see any problems or omissions, please call me during the next week. 3 . For those of you who were unable to attend the recent meeting with the City Council, attachment: C is a copy of the revised schedule for Tr•ansportat:ion Plan work . 4 . Enclosed (Attachment D) is a copy of a notice of a neighborhood meeting that may interest you. 5. The March 24th meeting will be an important one. Please mark your calendar• now for• this meeting. br•/3.147L1 ATTACHMENT A "SHORT LIST" PROJECTS CONSIDERED FOR 1988--89 FUNDING N.P.O. 1 & 2 Tiedeman Ave. , between Greenburg Rd. and Fowler Junior High, widen for bike/pedestrian safety Tiedeman Ave. at Fanno Creek, bridge replacement Grant Ave. , between Tigard St. and Walnut, sidewalks and drainage Grant Ave. at Fanno Creek, bridge replacement Greenburg. Rd. , between Pacific Hwy. and Cascade Ave. , widening for turn lanes and bike/pedestrian safety improvements Greenburg Rd. at Ash Creek, bridge widening (construction) Greenburg Rd. at Cascade Ave. , signals and intersection improvements McDonald St. , between Hall and 98th, widen for bike/pedestrian safety and improve vertical alignment Improved street name signing at major intersections Grant/Walnut intersection N.P.Q. 3 Gaarde St. at Pacific Hwy. , intersection improvements 110th Ave. , near Garden Park P1. , widening and improved vertical alignment N.P.O. 4 72nd at Pacific Hwy. , intersection improvements (construction) 69th at Pacific Hwy. , intersection improvements 72nd Ave. , between Hampton and Pacific Hwy. , widening and improved vertical alignment N.P.O. 5 Bonita Rd. , between 72nd and Hall, widening and vertical alignment improvements Bonita Rd. at Fanno Creek, bridge replacement Bonita Rd. railroad crossing improvements Durham Rd. at Hall Blvd. , inter•secti.on improvements and signals Ross St. realignment at Hall Blvd. to eliminate offset from Sattler St. (right•-of—way only) Page 1. N.P.O. 6 Durham Road, between 87th Ave. and Summerfield Dr . , widening to provide turn lanes and sidewalks, along with vertical alignment improvements 92nd Ave. , between High School and Cook Park, safety improvements (walkways and sight- distance) Walkway improvements in the vicinity of Twality and Templeton Schools N.P.O. 7 North Dakota St. at Fanno Creek, bridge replacement Tigard St. at Fanno Creek, bridge replacement 121st Ave. , between Scholls Ferry and Walnut, widening to collector street standards N.P.O. 8 Pfaffle St. , between 78th and Hall, widening and reconstruction Locust St. , between Hall and Greenburg, widening and reconstruction, pedestrian safety improvements br/1602D/0002D Page 2 N.P.O. 1 & 2 _Projects Already Funded Scholls Ferry Rd. , between Cascade Ave. & Hwy. 217 ramp, right turn lane (ODOT) [C] Fi4NplN4 IMA41 fe Lo1T. Hall Blvd. at Burnham, signals and turn lane (ODOT and Fed.) [S] Hall Blvd. at McDonald, signals and turn lane (ODOT and City) [S,C] Hall Blvd. at Pacific Hwy. , intersection improvements (ODOT) [C] Greenburg Rd. at Tiedeman, signals (City and Fed.) [C] Greenburg Rd. at Tiedeman, right turn lane (City) [C] Greenburg Rd. at Center St. , intersection improvements (City) [S] i Greenburg Rd. at Ash Creek, bridge widening (P.E. only) (City) [S] Tiedeman Ave. realignment sputh of Fanno Creek (City) [S� nJErIT' pp�TPrfNED} Transit Center on Commercial St. (Tri-Met) s Projects Suggested by WCTCC for ODOT Six-Year Plan Update By-pass connection from I-5 to Pacific Hwy. (Tualatin-Sherwood), to relieve through traffic on Pacific Hwy. and other roads. [C] . Hall Blvd. , between Pacific Hwy. and McDonald Street, widening [S] �j Hwy. 217, between Beaverton-Hillsdale Hwy: and Greenburg Rd. , auxiliary lanes. [C] Current Needs Previously Identified i Hall/Hunziker/Scoffins, intersection improvements [C] p Main St. at Fanno Creek, bridge replacement [S,H] GELATO Main St. , pavement reconstruction and drainage improvements [R] To CI'T'Y . Main St. , railroad crossing improvements [R] Main St. , at Burnham, intersection improvements [C] Main St. at Commercial, intersection improvements [C] 17LA N Commercial St. , between Main and Hall, widening and reconstruction [S,R] Lit) ? Burnham St. , between Hall and Main, widening [S] Lit)? Ash Ave. near Cresmer Dr. , complete missing half-street section [S] Fa a De D Tiedeman Ave. , between Greenburg Rd. and Fowler Junior High, widen for bike/pedestrian safety [S] V, Tiedeman Ave. at Fanno Creek, bridge replacement [S,H] Grant Ave. , between Tigard St. and Walnut, sidewalks and drainage [S] Grant Ave. at Fanno Creek, bridge replacement [S,H] Greenburg. Rd. , between Pacific Hwy. and Cascade Ave. , widening for turn lanes and bike/pedestrian safety improvements [S] Greenburg Rd. at Ash Creek, b^idge widening (construction) [S] i Greenburg Rd. at Cascade Ave. , signals and intersection improvements [C] Greenburg R. at Hwy. 217, capacity improvements for northbound traffic [C] OVOT 40"Piry Intersection improvements at North Dakota and Tiedeman CC)F"TN/ti �E�}����wENT 7 Cascade Ave. , between Greenburg and Scholls Ferry, widening and possible alignment improvements [S] Lit) ! 95th Avenue/Shady Lane, widening [S] L1D? McDonald St. , between Hall and 93rd, widen for bike/pedestrian safety and improve vertical alignment [S] FMO 0 E O McDonald St. , between 93rd and Pacific Hwy. , widen for bike/pedestrian safety [S] Tigard St. , between Main and Tiedeman, widening and drainage [S] FUTNIZE Improved street name si(-ining at major intersections [S] QALAM 4mfile V T ? �rlurain� G�� .sF�d�1. - br/1602D -- Page 4 M.P.O. 3 (AND BULL MOUNTAIN CPO) Projects Already Funded Pacific Hwy. at Canterbury/Bull Mtn. area, intersection improvements and signals (ODOT/MSTIP) [S] Projects Suggested by WCTCC for ODOT Six—Year Plan Update [See NPO 1 and 2 list] oaca SE Noai Current Needs Previously Identified Ito T OdyEa6 imp' Gaarde St. at Pacific Hwy., intersection improvements [S,CEAjsj*T� 901' Walnut St. at Pacific Hwy. , capacity improvements [C] 110th Ave. , near Garden Park P1. , widening and improved vertical alignment [S] Future Needs (including areas not presently under City jurisdiction 121st Ave. , between Walnut and Gaarde, widening [S] Gaarde St. , between 110th and 121st, widening [S] Former St., between Walnut and 121st, reconstruction [S,R] Walnut St., between Tiedeman and 135th, widening and improved vertical S alignment [S] O�►� Walnut/Tiedeman/Fonner intersection improvements for safety and capacity [S,C] Bull Mtn. Rd. , widening, improved vertical alignment and possible improvements to horizontal alignement [S] Beef Bend Rd. , widening [S] Murray Blvd. , between Walnut and Gaarde, new roadway per Comprehensive Plan [C] Connection(s) between Murray/Gaarde extensions and Bull Mtn. Rd. [C] Develop and improve connections between Bull Mtn. Rd. and Beef Bend Rd. at 133rd Ave. and 150th Ave., per Bull Mtn. Community Plan [C] Develop connections between Bull Mtn. Rd. and Scholls Ferry Rd. at Roshak Rd. and Sunrise Lane per Bull Mtn. Community Plan [C] COMSAITLY OU010or G iTy"s 4CT1VF PLAO A120 br/1602D Page 6 N.P.O. 4 Projects Already Funded I-5 at Hwy. 217/Kruse Way, interchange improvements (P.E. only) .(ODOT) [C) Hwy. 217 at Pacific Hwy. , interchange improvements (P.E. only) (ODOT) [C] Dartmouth St. , between 69th and Pacific Hwy. , new roadway (LID) [C] 72nd at Pacific Hwy. , , intersection improvements (P.E. only) (City) [S,C) Complete Triangle traffic plan (City, ODOT) [C] Park & Ride Lot in the vicinity of 72nd and Pacific Hwy (Tri-Met) [C] Projects Suggested by WCTCC for ODOT Six-Year Plan Update I-5 at Hwy. 217/Kru3e Way, interchange improvements (construction) [C] Hwy. 217 at Pacific Hwy. , interchange improvements (construction) [C] [See also NPO 1 and 2 List] Current Needs Previously Identified 72nd at Pacific Hwy. , intersection improvements (construction) [S,C] 69th at Pacific Hwy., intersection improvements [C] 72nd Ave. , between Hampton and Pacific Hwy. , widening andimproved vertical alignment [S] M� . MANT�NAA/2 68th Pkwy. , between Hampton and 66th, pavement reconstruction [R] )VIL I Pacific Hwy. , between I-5 and Greenburg Rd. , capacity improvements Future Needs Construction of a loop road, per Comprehensive Plan [C) Possible extension of Haines St. westward to 72nd Ave. [C] Intersection improvements and widening of collector streets as development occurs, in accordance with the Tigard Triangle Traffic Circulation Study prepared by ATEP [C) br/160?D Page 7 N.P.O. 5 Projacts Already Funded Hall Blvd. , between McDonald St. and Durham Rd. , shoulder bikeway improvements (ODOT) [S] Upper Boones Ferry Rd. , between Durham Rd. and Lower Boones Ferry Rd. , shoulder bikeway improvements (ODOT) [S] Durham Rd. , between Hall and Upper Boones Ferry Rd. , shoulder bikeway improvements (ODOT) [S] Durham Rd. at Hall Blvd. , westbound right turn lane (City) [C] Projects Suggested by WCTCC for ODOT Six—Year Plan Update Hall Blvd. , between Pacific Hwy. and McDonald St. , widening for capacity and safety improvement [S,C] Hall Blvd./Durham Rd. , between McDonald St. and Upper Boones Ferry Rd. , widening for capacity and safety improvement [S,C] [See also NPO 4 List] Current Needs Previously Identified Bonita Rd. , between 72nd and Hall, widening and vertical alignment improvements [S] Bonita Rd. at Fanno Creek, bridge replacement [S,H] Bonita Rd. railroad crossing improvements [R] Durham Rd. at Hall Blvd. , intersection improvements and signals [C] . 79th Ave. , between Bonita Rd. and Durham Rd. , widening and vertical alignment improvements [S] L ID Q Future Needs Durham Rd. extension between Upper Boones Ferry Rd. and -72nd [C]• New street connection between Hunziker and Hall per Comprehensive Plan [C] Ross St. realignment at Hall Blvd. to eliminate offset from Sattler St. [S RESERVE R/4Nr OF WAY Alow kir/1 b02D Page 8 N.P.O. 6 Projects Already Funded Pacific Hwy at Fisher Rd. , signals [S] (rvaiww. wv sE Low) [See also NPO 1 and 2, NPO 3, and NPO 5 Lists] Projects Suggested by WCTCC for ODOT Six—Year Plan Update [See NPO 5 List] Current Needs Previously Identified Durham Road, between 87th Ave. and Summerfield Dr. , widening to provide turn lanes and sidewalks, along with vertical alignment improvements [S] 92nd Ave. , between High School and Cook Park, safety improvements (walkways and sight distance) [S] p Sattler St. , between Hall and 100th, widening to full standards [S] LIV . Walkway improvements in the vicinity of Twality and Templeton Schools (Si Naeve St. , widening and paving [S] LIC + A&IJOW160 or .V&VELOMMit ? Future Needs Possible new bridge connection between Tigard and Tualatin [C] br/1602D - - Page 9 N.P.O. 7 Pro 'ucts Already Funded Scholls Ferry Rd. at Old Scholls Ferry Rd. , interim intesection improvements and signals (ODOT) [S] Scholls Ferry Rd. , between Fanno Creek and Murray Blvd. , widening arid signals (ODOT/MSTIP) [C] 135th Ave. , between Scholls Ferry and 700' south of Morning Hill, reconstruction to minor collector standards (LID) [S] Projects Suggested by WCTCC for ODOT Six-Year Plan Update Supplemental funding for the Scholls (Fanno Creek-Murray) project [C] Current Needs Previously Identified North Dakota St. , between Tiedeman and 121st, widening for bike/pedestrian safety [S] PARTLY F&4#JVE1D North Dakota St. at Fanno Creek, bridge replacement [S,H] Tigard St. , between Tiedeman and 121st, widenirxI for bike/pedestrian safety [s] L10 + GONoW00 Oir IDEM-OPMl,Afff Tigard St. at Fanno Creek, bridge replacement [S,H] 121st Ave. , between Scholls Ferry and Walnut, widening to collector street standards [S] Future Needs 130th Ave. , south of Scholls Ferry, develop a street connection in accordance with the Comprehensive Plan [C] Murray Blvd. , between Scholls Ferry Rd. and Walnut St. , construction of a new street in accordance with the Comprehensive Plan [C] br•/1G02D -- Page 10 N.P.O. 8 (AND METZGER CPO) Projects Already Funded Hall Blvd. at Scholls Ferry Rd. , intersection improvements (ODOT) [C] - Hall Blvd. at Washington Dr. , turn lane (ODOT) [S] F&Npjhi4 NMy IM Ldo` Hall Blvd. , between Greenburg Rd. and Locust St. , shoulder bikeways (ODOT) [1-11] Hall Blvd. at Oak St. , turn lanes (ODOT) [S] Hall Blvd. at Pfaffle St. , turn lane (ODOT) [S] M4001011 MAY BE "ST Proiects Suggested by WCTCC for ODOT Six—Year Plan Update Hall Blvd. , between Scholls Ferry Rd. and Pacific Hwy. , widening [S,C] [See Also NPO 1 and 2 and NPO 4 lists] Current Needs Previously Identified Pfaffle St. , between 78th and Hall, widening and reconstruction [S,R] Locust St. , between Hall and Greenburg, widening and reconstruction, pedestrian safety improvements [S,R] Lincoln St. (93rd Ave.), between Locust and Oak, construct a new street connection [C] PftPyW o i.jj1D. Future Needs (Including Areas Not Presently under City Jurisdiction) Taylors Ferry Rd. extension to Oleson Rd. [C] 74th Ave. extension across Ash Creek [C] 80th Ave. , between Oak and Taylors Ferry Rd. , bike/pedestrian safety improvements [S] Oak St. , between Hall and 71st, widening [S] Locust St. , between Hall and 80th, widening [S] Greenburg Rd. , between Washington Square entrance #5 and Washington Square entrance #6, widening [C] Taylors Ferry Rd. , between 80th and 65th, improve to collector street standards br•/1 GO'l.0 Page 11 ATTACHMENT C February 8, 1988 PROPOSED TRANSPORTATION PLAN SCHEDULE FOR 1988 February ° Identify potential projects for immediate City funding. ° Consultant: retained for• Northeast Bull Mountain Area study. March ° Develop FY 88-89 CIP. ° Consultant retained for• Downtown Access Study. April—June ° Develop street improvement proposal for possible November ballot issue. Summer• ° July — TTAC/Council meeting. • Complete Triangle area plan in coordination with EDC and ODOT projects. ° Begin transportation planning for the Washington Square area in conjunction with County, ODOT and others . • August: — City Council public hearing on project list. Fall ° Complete transportation studies; consider• appropriate comprehensive plan amendments . ° Develop a .long—range CIP for• streets . Winter ° Complete and adopt a transportation plan document. A Coordinate with Comprehensive Plan periodic review. br/3:1.02.D ATTACHMENT D CITY OF TINA RD OREGON NOTICE OF MEETING At the request of residents of your neighborhood, the Police Chief and I have scheduled a time to meet with the residents to discuss traffic concerns on Springwood Drive. We have received a number of comments proposing revisions to Springwood Drive. Some residents are. concerned about improving access to Springwood Drive. Others are concerned about through traffic and have suggested ways to restrict traffic on Springwood Drive. At the meeting, we plan to discuss all of these concerns. The meeting is scheduled for: Thursday, February 18, 1988 - 7:00 P.M. Evangelical Church 10900 SW 121st Avenue Tigard, Oregon This will be an informal neighborhood discussion. All interested people are invited to attend and participate. Randall R. Wooley City Engineer br/3043D 13125 SW Hall Blvd.,P.O.Box 23397,Tigard,Oregon 97223 (503)639-4171