Report ei 1 I 99'"0- RW-201?-c0036
*u TMyy.pyo / 1C32_ SG✓P crli'C
GRIFFITH (503) 643-1596
FAX (503) 644-1529
ROOFING C O. Email: Info@GriffithRoofingCampany.eom
6815 S.W. 111th Ave.
Beaverton,OR 97008
BUILT UP&COMPOSITION ROOFING • COMMERCIAL• INDUSTRIAL• RESIDENTI L
ECEIVED
CONSTRUCTION CONTRACTORS BOARD NO.925
JUN 21 2017
CITY OF TIGAR
DlJILDINC DIVISION
May 23, 2017
Westside Dance Academy
11632 SW Pacific Hwy
Tigard, OR 97223
Reference: Roof inspection for 11632 SW Pacific Hwy, Tigard, OR
Melanie:
After inspecting the above referenced address we have the following proposal to offer.
PROPOSAL
1. Tear off existing roof shingles.
2. Install 26 gauge prepainted metal at
A Gutter edges
B. Rake edges
C. RVO 38 roof vents
D. Sidewalls
3. Install cool vent nail base inside the building only, not on open area.
4. Apply ice and water shield over entire roof.
5. Apply Safeguard Hybrid#30 felt.
6. Install lead pipe flashing on all plumbing vents.
7. Install Malarkey Highlander 30 year shingles.
8. Clean up and remove all of our debris
9. Any rot, dry or structural repair, will be billed at$74 per hr. plus material.
Total
Note: This material needs to be approved by the City of Tigard and the material will take 2 to 3
weeks to arrive.
.T z -Ti3 a B, MUNINEMMENIUM11111111011111111111111111111
a , Li i 1 1 1 HIMMINIMMERIMENININIMEMENIMINEMM - -
PI I Tr- th , .....jummiummounmomminnuninammmi
.1 ..-- iiiimilialt-Ttaainfoimaaarliggnmormalmengui.ENIumlimit,
iiiblit1.1 4:1-, ' _I H minnomminummummantommu II J.44
i4,z41___Liti. 1 I
I 11 1 ' ELIELIMEMENIMIIMINIMMENIMM ' I , 4,„,,,i_
„,;__ _4LINA) st),,,I.4: . 4 I : 44 BEIMINNIMIN INIMEMONNE111 444 ,
ar *P , 4H O 1 . 1111 ININENIMI. • 4 IMMINEHEIMMINI 111 i 1 ' j_lb
1.44_1121 1._ ' 1 ' MI 11111E1111 1 immumnommungs 1_1_
1 1-H-,Pic. ( �u," J�`uP- IN INNEN _.
liiii • i 112, Ilia 1 1 i MEMMIMMEMINIMMI • . 1 , _
11.41: 4,1-, Trim if 0 i Emu rummrommimenm I . 1 I
---t--, 1 _,_ ,
1MINdbillui 1_,1 I 11 I:1 '
NYMNIIIIIIIIIMEIMMUMEMMUM11111111
i 4_1 4 14._ 1 ',
� FY�
rO� 11MNY �
Y � ��\�
Cool-Vent - Approval Drawing (Roof Application)
* 1"Thick x 2"Wide x 6" Long-Wood Blocks (WB)
518"CDx'iywood - Rabbeted On All Four Sides - LTTR=o I
*1"WB « 9"Typ » 1"WB 1"WB 1"WB 1"WB
3.5 Flat Blk-Blk 20psi 48x96 - LTTR=20.5(Based on 2014 LTTR Values)
Assembly: 5.1"Cool-Vent
Overall Thickness: 5.1"(+/- 5/32')
Overall LTTR Value: 20.5(Based on 2014 LTTR Values)
Drawing ID: SP108085-01
Printed: 6/1/2017 8:35:47 AM
Important: Insulation must be protected from open flame and kept dry at all times. Install only as much insulation as can be covered the same day by completed roof covering
material. Hunter Panels will not be responsible for specific building and roof design by others,for deficiencies in construction or workmanship,for dangerous conditions on the job
site or for improper storage and handling. Call Hunter Panels or refer to the PIMA Technical Bulletin No. 109: Storage Handling Recommendations for Polyiso Roof Insulations.
Warehouse For approval please sign&fax to 877-775-1769 HUN -FE l
HUNTER PANELS,LLC
Portland, OR Company: 15 Franklin Street
Print Name: Portland,ME 04101
Installer:
Signed:
Distributor: Dealers Supply Company g Phone: 888-746-1114
Architect: Title: Date: Fax: 877-775-1769
www.hpanels.com
Cust PO:00016482 Hunter Order. 1968825 I reviewed the Installation Guide hpanels.com