Loading...
Correspondence .5 I a20[ 7a31 l 6Q 12 WL Sii) "1view MiTek USA, Inc. 16023 Swingley Ridge Rd. July 6, 2016 Chesterfield, MO 63017 Telephone 314/434-1200 Fax 314/434/5343 To whom this may concern: Please be advised that solid shim is not required when connecting the end jacks to hip trusses, provided the live load (Roof Snow) is less than or equal to 40 psf. Since the reactions are relatively small the connection can be made with a combination of direct bearing and 2-16d toenails. Very truly yours, Scott Miller, PE Vice President, Engineering