Loading...
Report Vk-ST�Ybl l3SS 5;,�) Oak* i C DESIGN= FIELQ REPORT Page 1of 1 w-..�«•....«.,....:. ,,,.,.,. .w. +�.......,.,r ..nw,-»,.:.w+.n,,.,+.+..<......_»:,.:xw.wn v..a.n..:.::..,,.«...,......mmay.....»j.-- GDItct' Pafy on-130-OS _ Prepared By .. .. Zachary Kane Seit. _P%�Name: _ River Terrace Northwest Date June 05, 2417 . ... Location: SW Beach Plum Terrace Report#: 1 182 4 Arrival: 1;.315 Departure: 1415 Weather: Sunny, 74s Permit#: TBA Site Visit Requested Ry Sam(Polygon) _ w Met With (an site):plySam (Polyp t) Lot 211-215-Structural fill evaluation ----Outstanding ssues: FR-136(9/14)Low density pavement I arrived on site as arranged by Sam with Polygon Homes. The purpose of my site visit was to evaluate structural fill for the patio footings for lot#211-215 as indicated on the attached site plan. Upon arrival I observed earthworkcrew had completed placing 8-1 Oft of fill along the east,side of building 13. The structural fill consisted of 1 W drain rock. Using a%-inch diameter steel foundation probe,,l evaluated the relative consistency of the fill. Based on probing,the subgrade appears medium dense to dense at the surface. Sam Indicated that the drain rock had been placed in 24"lifts and compacted with a jumping Jack. This is acceptable to GeoDesign. Sam indicated there would be 2ft by 2ft footings and a 4"slab poured. We recommend that fabric and a skiff of 1"-0 crushed rock be placed'and well keyed to provide a firm base for the concrete pour. Sam indicated that this recommendation would be followed. Based on observation and probing, it is our opinion that the lots 211-215 patio footing structural fill where observed today has been prepared in general accordance with our geotechnical recommendations. Dlstribution Attachments:Site plan(1) Reviewed by: SMD This report presents opinions homed as a result of our obsenmtJon of ac*Mes relating to geotechnical tMineeriig or environmemal seMces.We rely on the contractor to comms vdth ft plans and spedhcations throughout the duradwr of the project irrespective of the presence*four represenmdve.Our work does not Include supervision or direction of the contractor,tie contractoes employees or agents.out firm is not responsible hx site safety.This field report Is a DRAFT representation of our field observatbns,testing,and preliminary recommendations.The mportcan only tie considered flmd upon review of the f wo lgn projectmann,as lndkeed y inidais in the"RevW^d BMJ'section.. Signature:'.,- 15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 1 Off 503.968.8787 1 fax 503.968.306$