Loading...
PFI2017-00100 09 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12017-00100 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/01/2017 Parcel: SEG925 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Commercial St Sanitary Replacement Project Description: 355 lineal foot of sanitary sewer main line replacement for CIP 93056 Owner: FEES Description Date Amount PHONE: Contractor: GT EXCAVATION LLC 10333 WISEACRE LN AURORA, OR 97002 PHONE: 503-310-5442 FAX Applicant: ANDREW NEWBURY 13125 SW HALL BLVD TIGARD, OR 97223 PHONE: 503-718-2472 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Signature: ignPermittee/Applicant Signature:ure: ]� l Issued By: /"' - ✓ "o� Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12017-00100 Tv pe: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA]. and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice I A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit Call Andy Newberry 503-718-2472 PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice • City of Tigard RECEIVED PUBLIC WORKS —ENGINEERING JUN Q 1 2017 � T n (PFI�A, „.Ro Public Facility Improveme t m1t gEERING TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) ❑ 'TYPE 1—Franchise Utility Work Check one: 10 Utilities ❑Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE Detailed description: t'oo+ orr Salnjav\/ and/or utility agency. TIR YPE 2—Sidewalk/Driveway/Sewer ;zWe.✓ W1A�r1 I,�L VG�IQGeYv1G✓1T �of G1P 93CS6• Work performed for the purpose of: • Sidewalk installation or repair. - • Driveway approach installation Property address/location(s): G�Y+whC✓�:.v. wcc1A and/or repair M a L i✓► o S G e1 01 ZS • Sanitary sewer lateral installation and/or main line tap ❑ TYPE 3—Full scale Development Applicant: G' Y o'� -T;Save,�c� Work performed with Land use Address: 13Q-5 SW MA I I B I vd. approval which includes any of City/state: _riq+4 0 69- Zip: q-77--z-3 the following. Phone: Email: �vl�vGtJN� Itcg✓c��a�, �,o� • Subdivisions or Partitions Contact name: A of vc w PC Wi0v✓Y Phone: 503.718- VC7 Z • Street widening • Mainline installation for Sanitary Contractor: CGT sewer, Storm sewer,Tigard water • CCB#: 1and/or Tigard Water Service Area 1 S oZ; Expiration: 3.4-2,041`1 Address: (63:3-3 W l5Gckc,”— LO NE SUBMIT COMPLETED APPLICATION TO: City/state: Au,/0,(V,, OV- Zip: ot'1002.. City of Tigard �-6If-37-37- Email: g��td Planning/Engineering Phone:5d � y � q�•ex ccayg-�"�N9, [�',�/) 13125 SW Hall Blvd. Contact name: &VINAy TOU 0 50 0 Phone: 503- 310-54 y Z Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: Sg of c_ cis a pr1,c_c tn4 only may be emailed to: rowpermits(5),tigard-or.gov Address: • • City/state: Zip: n Phone: Email: Case No.: � 20 1-7— bQ 10 Q Contact name: Application submittal fee: $ Additional fees: $ Estimated value of work is required(if over$5,000):$ -2(1 S 00 Application ac�epted: / 7 (within the public right-of-way) By: . . Date: Is work related to a LAND-USE DECISION? ❑ Yes ® No Application reviewed: r If so,please specify (MLP,SDR,SUB,etc.) case#: By:,T GS�^-- Date: Applicant n fled: Is work related to a BUILDING PERMIT? ❑ Yes 10 No By:jo —Date: If so,please specify(BUILDING PERMIT)case#: l:\ENG\PermitApplications\pfi_appliwtion Rev.12/16/2016 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.fiprd-or.gov • 503-718-2421 • Page 1 of 4 k APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if . required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owners signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject ro e • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Applicant/Authorized Ag is signature Print name Date • SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4 CITY OF TIG ARD AYLOR S FERRY OREGON N • PLANS FOR PROJECT reR9f R� NORTH COMMERCIAL STREET 5°�° N °TA e SanitarySewer Repair WRo � S7REETQPG\` BULL STREET MCDOA14LD MOUNTgf� RD Q BONITA Main Street to Lincoln Avenue J Q BEEF BEND RD. °' DURHAM N TO BE SUPPLEMENTED BY THE CITY OF TIGARD DESIGN STANDARDS DATED JULY 16, 1988 AND OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION 2016 •�A�N ,per Project Location=* cFNT Sj VICINITY MAP INDEX OF SHEETS NO. NAME TITLE �F�cq` ST J� CF�rc� PJ� 1 S1 Cover Sheet 2 S2 General Notes 3 S3 Layout & Profile �i 4 C1 Details cq,QD 9g • ST �l 5 C2 Details 6 EC Erosion Control I< � o � y{Nyy raj ct Lo t' n RECEIVE® JUN Q 1 2017 PLANNING'NGTY'ENGIN ERIN ,CD PROF ATTENTION: Oregon low requires you to follow rules G `C`I�" FSS odopted by the Oregon Utility Notification Center. Those e rules are set forth in OAR 952-001-0010 through OAR ��GINeF� 952-001-0090 You moy obtain copies of the rules by Na tolling the center. (Note: the telephone number for the LOCATION MAP 63213PE o�' Oregon Utility Notification Center is (503) 232-1987). BENCHMARK u r ;& H ATTENTION.,Notify NW natural at (503)220-2415 when Bross disc labeled 157 located in the sidewalk at the t� OREGON $N excavating within 5' of on existing high pressure gas NW corner of Tigard Street and Main Street. y2 Jl. OOa main. Elevation: 157.86 City of Tigard vertical datum O T 14,2 J NEO CN rc CALL BEFORE YOU DIG PAUL 1-800-332-2344 � RENEWS: 12/31/2018 2 Revisions and AddendumeENOINEEaINe DlvlswN SHEET e --- y COMMERCIAL STREET S1 • Description ate o. B PUBLIC WORKS DEPARTMENT �c a BID 4113117 1 APN ' 13125 S.W. HALL BLVD. T _ 77GARD, OREGON 97223 SANITARY SEWER REPAIR or o VOICE.• 503-639-4171 FAX 503-624-0752 6 a s • � WWW nGARD-oR.cov COVER SHEET TLE DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056 GENERAL NOTES work and shall be effectively 14. Maintenance of the work area and 952-001-0080. Copies of said 25. The permit holder shall provide to maintained. approach roods is the rules may be obtained from the the City inspector, in writing, the 1. The permit holder must comply responsibility of the permit holder. Center by calling 503-246-1987 names and 24 hour emergency • with all applicable provisions of 8. Pursuant to Tigard Municipal Code The work area and approach roads If you have any question about the telephone number of two (2) federal and state law, the Tigard Section 740.180, work is shall be maintained in a clean rules, contact the Center. NOTE.- persons who have authority to Municipal Code, and the terms of permitted between the hours of condition, free from obstructions Damage to utilities shall be resolve problems, take corrective any agreement with the City of 7.•00 a.m. to 7:00 p.m. daily and hazards. A copy of the corrected at the permit holders action and, in general, will be Tigard regarding work to be done unless otherwise authorized by the permit holders Certificate of expense. responsible in case of any pursuant to this permit. City Manager. Insurance shall be available at the emergency. The permit holder work area. 20. Contractor must verify all existing shall notify the City Inspector, in 2. The City's standard specification 9. Minimum travel lane width shall be utilities for both vertical elevation writing, of ony/all assignment for traffic control is "Manual on twelve (121 feet; pedestrian travel 15. The spreading of mud or debris or and horizontal location prior to changes. Uniform Traffic Control Devices For shall also be provided for. storage of materials or equipment start of work (pothole before Streets and Highways; U.S. Dept. of any kind upon any public digging if necessary). Notify 26. The permit holder shall cause his of Transportation, FHWA, current 10. The City reserves the right to odd roadway is strictly prohibited and engineer of any conflicts prior to contractor to provide to the City edition. to or modify traffic control violation shall be cause for ordering material. Changes must Inspector, in writing, the name and requirements as may be necessary immediate cancellation of the be approved by the City in 24 hour emergency telephone J. Traffic control shall be provided to effectively control traffic and to permit. The City may at any time advance of work performance. number of a designated for by the contractor in assure public safety. order immediate clean-up and the Contractor shall coordinate the "Competent Person" responsible for accordance with the City's stoppage of work to accomplish work with affected utility agencies. construction safety as per 11. Before initiating any construction clean-up. OR-OSHA, Cha 437, Div. 3 standard specifications and, also, P� in accordance with a Cit (job activity, the permit holder shall be 21. A temporary hard-surface patch Construction, Sub-division P - City contacted by the City's inspector 16. Effective erosion control is (Cold mix A.C. or Hot Mix base Excavations. The contractor shall specific) approved traffic control at 503-718-2472 to establish a required. Erosion control devices plan. A copy of the approved lace, time, and date for o must be installed and maintained Paving) shall be placed on notify the City Inspector of ony/a/I traffic control plan shall be P trenches within roadways at the assignment changes. P reconstruction meetin meeting the Clean Water Services end of each da available at the work area. P g' days work. No and DEQ requirements. The City trench, on site or off-site, shall 27. It is the sole responsibility of the 4. Public roadwayshall not be closed 12. The permit holder or his may at any time order corrective be left at any time in an un-safe permit holder to provide for contractor shall notify the City's action and stoppage of work to condition. The permit holder is proper right-of-entry and/or to traffic, of any time, without Inspector, Andy Newbury at accomplish effective erosion responsible for and is liable for easements prior to starting work. having first obtained written control. approval from the City Engineer. 503-718-2472 twenty-four (24) hazards or damage resulting from Proof of right-of-entry or The permit holder is responsible hours prior to commencing work, the prosecution of the work. properly executed easements, shall P P 17. Property disturbed by construction for provision of time/ notification twenty-four (24) hours prior to be provided to the City. The City P y activity shall be seeded with a 22, Work provided for under the permit shall in no way be construed to of traffic flow disruptions to area any staged inspection and after P P y P standard grass mix; shrubs, shall include repair of existing be liable for the permit holders • wide Emergency Services (Tigard completing work covered by the P 9 9 y ( 4 flowers, bark dust, existing signs, Police Dept., Tualatin Fire & permit. facilities (roods, ditches, etc.) as failure to obtain or provide for P pavement markings, mailboxes, etc. may be necessary, in the City proof of right-of-entry or Rescue) and to Tri-Met and Tigard shall be reestablished, reinstalled 13. A copy of the permit and all Inspector's opinion, to overcome easements. School District and other service attachments, and a copy of the or replaced, with like kind and deterioration or damage which providers. approved construction plan and all material. occurred in conjunction with the 5. Advance warning of imminent amendments shall be available at 18. Effective drainage control is work authorized by the permit. the work area. All work shall Corrective work shall be done at traffic disruption shall be provided required. Drainage shall be N to the general motoring public by conform to the permit terms, the permit holders expense. controlled within the work site and placement of an advance conditions and provisions and to e� shall be so routed that adjacent to the City approved permit plans, 23. The City's Inspector may, at his � notification sign of each end of private property, public property and approved plan amendments discretion, require provision of the construction area 72 hours and the receiving system is not and to the City's standards and tests and or reports from the H (min.) before initiation of adversely impacted. The City may `^ specifications and to these Genera! permit holder, the permit holders Z� construction work. P at any time order corrective action P Conditions. Changes to any of the and stoppage of work to engineer or contractor to validate aforesaid must be approved by the claims of material or construction E9 6. Access to existing properties shall accomplish effective drainage be maintained at all times, City in advance of work control. adequacy/compliance. Such including normal delivery service performance. tests/reports shall be provided at hand moil service and if not, shall 19. Oregon law requires following the the permit holder's expense. �Fp PROFS be cause for work stoppage until rules adopted by the Oregonc, `, effective access is established. Utility Notification Center. Said 24. Existing monuments, property C� �r1G�NEF,Q Nil rules are set forth in OAR corners, and survey markers shall 7. Traffic control devices, flog 952-001-0010 through OAR be protected. Replacement shall 6321 PE n� persons, etc., shall be in place be at the permit holders expense.^ prior to initiation of construction },OREGON 14, b 0 PAUL NF's RENEWS: 12/31/2018 Revisions and Addenduma ZD COMMERCIAL STREET SHEET Description Dat s o. B S2 B/D 4113117 l APN UBLIC WORK8 DEPARTA�NT3125 S.W. H4LL BLVD. SANITARY SEWER REPAIR 2 GARD, OREGON 97223 OF OICE: 503-639-4171GENERAL NOTES AX: 503-624-0752 6 11JENGINEERING WW.77GARD-OR.GOV FILE N DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056 Install project sign. CAUTION! I See Detail Sheet C 1 • Existing underground Connect latera/ NOTES.- Connect new electrical line. to main with inserto-tee. See Protect exit 1. See standard erosion control notes and trench 10" PVC mainline Contractor to protect. detail on monument • to exist MH CAUTION! detail Sheet EC1. HIGHWAY OVERPASS SW. 1879' Reset if PACIFIC sheet 5. See Detail Sheet C1 BOTTOM OF BEAM.- MID: 188.5' Existing underground necessary SW- 186.3' NE 186.5' communication line. Exist SS MH 2. See Connect To Exist Manhole and project sign HIGHWAY OVERPASS 1 detail Sheet C1. Exist SS MH MID: 186.9' BOTTOM OF BEAM: Contractor to protect. SS02AO 10 - SS02A012 NE: 184.x', _ _ - _ ._ " - - -%� - _... _ - - - _--- 3. Project signs are to be installed 48 hours prior to construction — HIGHWAY 4. All survey monuments shall be protected and 7�7 v — — preserved during construction. If any COMMERCIAL ST. t _a _ 4t— monuments are destroyed during construction ( p �° — _ the contractor shall have a surveyor replace �— - - tis w the monument as required by low in Oregon Revised Statutes 209.150. Protect exit Protect exit Connect new Protect exit OVERPASS monument monument 10" PVC mainline monument Reset if to exist MH Reset if Replace exist 10" Reset if LEGEND: necessary concrete pipe with necessarySee Detail Sheet C1 necessary p p 354.90 LF of 12'" DOSIING Install type 4 inlet PVC pipe protection. See Area Install project sign. pp SCALE: 1" = 10' Drion Detail Sheet EC1 See Detail Sheet C1 Telephone Line SANITARY SEWER PLAN 10' S' 0 10' Telephone Manhole Storm Manhole SCALE: 1"=40' Class 'B" Backfill Storm Line 180-- See trench detail on sheet 4 _ 80 0 Sewer Manhole o Sewer Line f(ok o - - Edge of Pavement h • I o ►� � - Centerline L o Monument LO 17 = Lo W 70 Overhead Power O N, C-)O 2 ., 2 x II o Electric `O i Water Line p EG at Ofi e �_ II - Right-of-Way W4J4W - - — — — — — — — — k Q Water Meter 16 --160 Guy Wire 0Ele I I 34.90 L 12" 3034 PVC 0. 11% ; ( PROIPOSED - - - � e - - - SS Sewer Line c6 v N Abandoned + o h 15 sewer latero a o ---450 -p PROFF o O� vNi v~i w ��GIN fF� *� 63213PE N U - N� M m / o II a JJ�s 7� OREGON 14 -- + -- - 40 O T14,2� J N 0+80 1+20 J60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+�80 5 0 p�,ly P AUL o W SANITARY SEWER PROFILE RENEWS: 12/31/2018 er SCALE: 1"=40' HORIZONTAL, 1"=10' VERTICAL Revisions and Addendums ENOMEERINe DIVISION COMMERCIAL STREET - SHEET _ Description Date o.Ji S3 PUBLIC WORKS DEPARTMENT Bl� 13 17 1 ` 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 3 17G4RD. OREGON 97223 OF VOICE: 503-639-4171 $ - N.,, v624-0752 PLAN & PROFILE 6 FILE N DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 930561 6' 418" ±"CITY OF TIGARD 3- COMMERCIAL STREET SANITARY SEWER REPAIR ~`r 4URATION: (fill in dates) FUNDING SOURCE: SEWER MAINTENANCE T—cut section CONTRACTOR: (fill in name) 3" Level 2 HMAC, 1/2" dense minimum IN 503-718-2472 (or match existing) over 3" Level 2 HMAC, 3/4" dense NOTES �LT�1 1T1T1T� 1. Sign Background.- White, Retroreflective sheeting 2. Sign Legend: "ARIAL" font, Blue, Retroreflective sheeting J. Sign Border: Blue, 1" Flush border 12" 12- 4. Decal will be provided by the City of Tigard NOTES. 5. Sign locations to be determined by Engineer. 1. Trench stabilization shall be placed prior to placement of pipe bedding if required �b PROJECT SIGN DETAIL 2. All compaction requirements per AASHTO Compacted NTS T-99 and ODOT/APWA Spec 00405 Backfill 3/4"-0" J. Compact trench pavement to 929 of rice aggregate density AASHTO T-209 Trench • Excavation & Backfill 6" > 6" MIN MIN Pipe N Grout Watertight With Nonshrink Existing Manhole ° Grout Provide Pvc Sanded Bell Or Kornseal Boot 18" 6" Min u Max New Pipe Below Pipe Bell Remove And Re rout Existing cFT \ g 9 -- Channel As Required Trench Foundation Stabilization (If Required) a N e p PRNO OFS Core Drill Manhole Tod'- Sip Provide Pipe 0 Plus 4" 1. Joints to be tacked and sanded. o Or As Required By 2. Sowcut shall be tack coated with 6321E oBoot Manufacturer bituminous asphalt emulsion. N� o CONNECT TO EXISTING MANHOLE DETAIL PIPE TRENCHING DETAIL OREGON e Not To Scale Not To Scale 20� AT 14,2 �OJ� PA UL RENEWS: 12/31/2018 Description and Addsndums __- - aler�ERINo DIVISION COMMERCIAL STREET SHEET esorl tion T Date o. B PUBLIC WORKS DEPARTMENT C1 BID 4113117 1 APN 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 4 77G4RD. OREGON 97223 OF a VOICE: 503-639-4171 FWW WARD-OR.-cove DETAILS FILE N DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056 1. PVC HUB SHALL CONFORM TO ASTM 3034, SDR 35 DRIVE INTO CENTER OF RUBBER SLEEVE AFTER SLEEVE IS PLACED IN HOLE. 2.STAINLESS STEEL BAND SECURES UPPER HALF OF RUBBER SLEEVE TO THE PVC HUB. STAINLESS STEEL BAND SHALL BE 300 SERIES, %a BAND WIDTH, CADMIUM PLATED CARBON STEEL. AND ATTACHED WITH HEX HEAD SLOTTED SCREW. 3.COMPLETE RUBBER SLEEVE INCLUDES A MOLDED SEGMENT THAT HOLDS IT IN PLACE. i 3 2 o� y .35 MINIMUM WALL THICKNESS NOTE: Ell 1. ALL INSERTA—TEE HOLES SHALL BE MACHINE DRILLED AND CORED. 2.INSERTA—TEE ARE ALLOWED IN NEWLY CONSTRUCTED SEWER MAINS 12" AND LARGER INSIDE DIAMETER (I.D.). H 3.SEWER MAIN SHALL BE TWO SIZES (NOMINAL I.D.) LARGER THAN THE INSERTA PROF n —TEE. F 4.HOST PIPE SHALL BE MINIMUM .35" WALL THICKNESS. �GINFF N� INSERTA- TEE u 2�r�,�-� N aeanWater Services OREGON gN REVISED 12-06 •ur commitment i+clear. �2 �A Q o DRAWING NO. 530 O T 14,ZQ J� PAUL \A� aRENEWS: 12/31/2018 Revisions and Addendums COMMERCIAL STREET SHEET Description Date o. B E8oiHEEaq�e �� C 1 PLIBUt BID 4113117 1 APN ' 13125 WORKS DEPARTMENT 1 NT SANITARY SEWER REPAIR 5 13125 S.W. HALL BLVD. 11G4RD, OREGON 97223 OF cs VOICE: 503-639-4171 FAX 503-624-0752 DETAILS 6 • WWW.77CARD—OR.GOv ILE N DE81aN:RCW'DRAWN:RCW CHECK A NP PROJECT NO: 93056 93056 W Standard Erosion Control Notes For Sites Less Than One Acre: 1. During periods of roinfoll and runoff, daily inspections of the erosion sediment controls MAY BE USED SHORT TERM and discharge outfolls must be provided by someone knowledgeable and experienced in W/ UTILITY WORK AND W/ • the principles, installation, and maintenance of erosion and sediment controls. PHASING OF DEVELOPMENT 2. Construction activities must avoid or minimize excavation and creation of bare ground from October 1 through May 31 each year. J. During wet weather period, temporary stabilization of the site must occur at the end of each work day. FLOW 4. Sediment controls must be installed and maintained on all down gradient sides of the -�► construction site at all times during construction. They must remain in place until „ permanent vegetation or other permanent covering of exposed soil is established. 5. All active inlets must have sediment controls installed and maintained at all times during construction. Unless otherwise approved, a surface mounted and attachable, u-shaped filter bag is required for all curb inlet catch basins. 6. Significant amounts of sediment which leaves the site must be cleaned up within 24 hours and placed back on the site and stabilized or properly disposed. The cause of the sediment release must be found and prevented from causing a recurrence of the discharge within the some 24 hours. Any in-stream clean up of sediment shall be60�� AREA DRAIN performed according to the Oregon Department of State Lands required time frame. 7. Sediment must not be intentionally washed into storm sewers, drainage ways, or water CATCH BASIN bodies. 8. Sediment must be removed from behind all sediment control measures when it has reached a height of one-third the barrier height, and prior to the control measures removal. FLOW 9. Cleaning of all structures with sumps must occur when the sediment retention capacity �! has been reduced by fifty percent and at completion of project. 10. Any use of toxic or other hazardous materials must include proper storage, application, El and disposal. 11. The permittee must properly manage hazardous wastes, used oils, contaminated soil, •� DITCH BOTTOM FLOW concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or generated during construction. O Iq 12. The application rote of fertilizers used to reestablish vegetation must follow manufacturer's recommendations. Nutrient releases from fertilizers to surface waters must be minimized. Time release fertilizers should be used and care should be mode �1 �►, • in application of fertilizers within any water way riparian zone. 14. Prior to any land disturbing activities, the boundaries of the clearing limits, vegetated DITCH INLET PLAN VIEW buffers, and any sensitive areas shown on this plan shall be clearly delineated in the field, unless otherwise approved. No disturbance is permitted beyond the clearing limits. The contractor must maintain the delineation for the duration of the project. Note: Vegetated corridors to be delineated with orange construction fence or approved equal. 6" overlap of bags. 15. Prior to any land disturbing activities, the BMPs (Best Management Practices) that must NOTES: o be installed are gravel construction entrance, perimeter sediment control, and inlet 1. ADDITIONAL MEASURES MUST BE N protection. These bmp's must be maintained for the duration of the project. CONSIDERED DEPENDING ON SOIL 16. if vegetative seed mixes are specified, seeding must take place no later than TYPES. ; i September 1st; the type and percentages of seed in the mix are as identified on plans or as specified by the design engineer. 2. BIO-FILTER BAGS SHOULD BE W 17. Watertight trucks must be used to transport saturated soils from the construction site. STAKED WHERE APPLICABLE USING s An approved equivalent is to drain the soil on site at a designated location using appropriate BMPs; soil must be drained sufficiently for minimal spillage. (2) 1"r,2"WOODEN STAKES OR e18. All pumping of sediment laden water must be discharged over an undisturbed, APPROVED EQUAL PER BAG. preferably vegetated area, and through a sediment control bmp (i.e. Filter bog). FOR FURTHER INFORMATION 19. The ESC plan must be kept onsite. All measures shown on the plan must be installed 3. WHEN JSING 30" BIO-BAGS TO ON DESIGN CRITERIA SEE properly to ensure that sediment laden water does not enter o surface water system, PROTECT A CATCH BASIN YOU MUST CHAPTER 4 OF CLEAN WATER p PROpt roadway, or other properties. HAVE 4 BAGS AND THEY SHALL BE SERVICES EROSION PREVENTION �,- o 20. The ESC measures shown on this plan are the minimum requirements for anticipated AND SEDIMENT CONTROL GIN fF CJ ^ site conditions. During the construction period, these measures shall be upgraded as OVERLAPPED BY 6". PLANNING AND DESIGN MANUAL. �, �Q H needed to maintain compliance with all regulations. 63213P N 21. Written ESC logs are suggested to be maintained onsite and available to district t� inspectors upon request. INLET PROTECTION OREGON o� gb 22. In areas subject to wind erosion, appropriate BMPs must be used which may include TYPE 4 ��O 'OT 14,2- J7 o the application of fine water spraying, plastic sheeting, mulching, or other approved aeanWater Service$ -QF �0 N measures. eur commitment is clear. PAUL IQ 23. All exposed soils must be covered during wet weather period. DRAWING NO. 915 REVISED 12-06 � RENEWS: 12/31/2018 t Revisions and Addendume SHEET 2 Description — - - Date No.I E"° �a COMMERCIAL STREET EC iv PUBLIC WORKS DEPARTMENT Bio - - 4113117 1 APN 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 6 _ 77G4RD, OREGON 97223 OF a VOICE: 503-639-4171 - - FAX: 50J-624-075 EROSION CONTROL NOTES s WWW.AG4RD-OR.GOVOR.GOV ILE N & DETAILS 93056 DESIGN:RCW DRAWN:RCW CHECK:APN I PROJECT NO: 93056