PFI2017-00100 09 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12017-00100
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/01/2017
Parcel: SEG925
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Commercial St Sanitary Replacement
Project Description: 355 lineal foot of sanitary sewer main line replacement for CIP 93056
Owner: FEES
Description Date Amount
PHONE:
Contractor:
GT EXCAVATION LLC
10333 WISEACRE LN
AURORA, OR 97002
PHONE: 503-310-5442
FAX
Applicant:
ANDREW NEWBURY
13125 SW HALL BLVD
TIGARD, OR 97223
PHONE: 503-718-2472
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Signature:
ignPermittee/Applicant
Signature:ure: ]� l
Issued By: /"' - ✓ "o�
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12017-00100
Tv pe: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA]. and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
I
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit Call Andy Newberry 503-718-2472
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
•
City of Tigard RECEIVED
PUBLIC WORKS —ENGINEERING JUN Q 1 2017
� T n (PFI�A, „.Ro
Public Facility Improveme t m1t gEERING
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
❑ 'TYPE 1—Franchise Utility Work
Check one: 10 Utilities ❑Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE
Detailed description: t'oo+ orr Salnjav\/ and/or utility agency.
TIR YPE 2—Sidewalk/Driveway/Sewer
;zWe.✓ W1A�r1 I,�L VG�IQGeYv1G✓1T �of G1P 93CS6• Work performed for the purpose of:
• Sidewalk installation or repair.
- • Driveway approach installation
Property address/location(s): G�Y+whC✓�:.v. wcc1A and/or repair
M a L i✓► o S G e1 01 ZS • Sanitary sewer lateral installation
and/or main line tap
❑ TYPE 3—Full scale Development
Applicant: G' Y o'� -T;Save,�c� Work performed with Land use
Address: 13Q-5 SW MA I I B I vd. approval which includes any of
City/state: _riq+4 0 69- Zip: q-77--z-3 the following.
Phone: Email: �vl�vGtJN� Itcg✓c��a�, �,o� • Subdivisions or Partitions
Contact name: A of vc w PC Wi0v✓Y Phone: 503.718- VC7 Z • Street widening
• Mainline installation for Sanitary
Contractor: CGT sewer, Storm sewer,Tigard water
• CCB#: 1and/or Tigard Water Service Area
1 S oZ; Expiration: 3.4-2,041`1
Address: (63:3-3 W l5Gckc,”— LO NE SUBMIT COMPLETED APPLICATION TO:
City/state: Au,/0,(V,, OV- Zip: ot'1002.. City of Tigard
�-6If-37-37- Email: g��td Planning/Engineering
Phone:5d
� y � q�•ex ccayg-�"�N9, [�',�/) 13125 SW Hall Blvd.
Contact name: &VINAy TOU 0 50 0 Phone: 503- 310-54 y Z Tigard,OR 97223
Applications for"minor work in right-of-way"
Engineer: Sg of c_ cis a pr1,c_c tn4 only may be emailed to:
rowpermits(5),tigard-or.gov
Address:
• •
City/state: Zip: n
Phone: Email: Case No.: � 20 1-7— bQ 10 Q
Contact name: Application submittal fee: $
Additional fees: $
Estimated value of work is required(if over$5,000):$ -2(1 S 00 Application ac�epted: / 7
(within the public right-of-way) By: . . Date:
Is work related to a LAND-USE DECISION? ❑ Yes ® No Application reviewed: r
If so,please specify (MLP,SDR,SUB,etc.) case#: By:,T GS�^-- Date:
Applicant n fled:
Is work related to a BUILDING PERMIT? ❑ Yes 10 No By:jo —Date:
If so,please specify(BUILDING PERMIT)case#: l:\ENG\PermitApplications\pfi_appliwtion Rev.12/16/2016
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.fiprd-or.gov • 503-718-2421 • Page 1 of 4
k
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if .
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
ro e
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Applicant/Authorized Ag is signature Print name Date •
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4
CITY OF TIG ARD
AYLOR S FERRY
OREGON N
• PLANS FOR PROJECT reR9f R�
NORTH
COMMERCIAL STREET 5°�° N °TA e
SanitarySewer Repair WRo � S7REETQPG\`
BULL STREET MCDOA14LD
MOUNTgf� RD Q BONITA
Main Street to Lincoln Avenue
J Q
BEEF BEND RD. °' DURHAM N
TO BE SUPPLEMENTED BY THE CITY OF TIGARD DESIGN STANDARDS DATED JULY 16, 1988
AND OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION 2016 •�A�N ,per
Project Location=*
cFNT
Sj VICINITY MAP
INDEX OF SHEETS
NO. NAME TITLE
�F�cq` ST J� CF�rc� PJ� 1 S1 Cover Sheet
2 S2 General Notes
3 S3 Layout & Profile
�i 4 C1 Details
cq,QD 9g
• ST �l 5 C2 Details
6 EC Erosion Control
I< �
o �
y{Nyy
raj ct Lo t' n RECEIVE®
JUN Q 1 2017
PLANNING'NGTY'ENGIN ERIN ,CD PROF
ATTENTION: Oregon low requires you to follow rules G `C`I�" FSS
odopted by the Oregon Utility Notification Center. Those
e rules are set forth in OAR 952-001-0010 through OAR ��GINeF�
952-001-0090 You moy obtain copies of the rules by
Na tolling the center. (Note: the telephone number for the LOCATION MAP 63213PE
o�' Oregon Utility Notification Center is (503) 232-1987). BENCHMARK u r ;&
H
ATTENTION.,Notify NW natural at (503)220-2415 when Bross disc labeled 157 located in the sidewalk at the
t� OREGON
$N excavating within 5' of on existing high pressure gas NW corner of Tigard Street and Main Street. y2 Jl. OOa
main. Elevation: 157.86 City of Tigard vertical datum O T 14,2 J
NEO
CN
rc CALL BEFORE YOU DIG PAUL
1-800-332-2344
� RENEWS: 12/31/2018
2 Revisions and AddendumeENOINEEaINe DlvlswN SHEET
e --- y COMMERCIAL STREET S1
•
Description ate o. B PUBLIC WORKS DEPARTMENT
�c a BID 4113117 1 APN ' 13125 S.W. HALL BLVD. T
_ 77GARD, OREGON 97223 SANITARY SEWER REPAIR or
o
VOICE.• 503-639-4171
FAX 503-624-0752 6
a s • � WWW nGARD-oR.cov COVER SHEET TLE
DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056
GENERAL NOTES work and shall be effectively 14. Maintenance of the work area and 952-001-0080. Copies of said 25. The permit holder shall provide to
maintained. approach roods is the rules may be obtained from the the City inspector, in writing, the
1. The permit holder must comply responsibility of the permit holder. Center by calling 503-246-1987 names and 24 hour emergency
• with all applicable provisions of 8. Pursuant to Tigard Municipal Code The work area and approach roads If you have any question about the telephone number of two (2)
federal and state law, the Tigard Section 740.180, work is shall be maintained in a clean rules, contact the Center. NOTE.- persons who have authority to
Municipal Code, and the terms of permitted between the hours of condition, free from obstructions Damage to utilities shall be resolve problems, take corrective
any agreement with the City of 7.•00 a.m. to 7:00 p.m. daily and hazards. A copy of the corrected at the permit holders action and, in general, will be
Tigard regarding work to be done unless otherwise authorized by the permit holders Certificate of expense. responsible in case of any
pursuant to this permit. City Manager. Insurance shall be available at the emergency. The permit holder
work area. 20. Contractor must verify all existing shall notify the City Inspector, in
2. The City's standard specification 9. Minimum travel lane width shall be utilities for both vertical elevation writing, of ony/all assignment
for traffic control is "Manual on twelve (121 feet; pedestrian travel 15. The spreading of mud or debris or and horizontal location prior to changes.
Uniform Traffic Control Devices For shall also be provided for. storage of materials or equipment start of work (pothole before
Streets and Highways; U.S. Dept. of any kind upon any public digging if necessary). Notify 26. The permit holder shall cause his
of Transportation, FHWA, current 10. The City reserves the right to odd roadway is strictly prohibited and engineer of any conflicts prior to contractor to provide to the City
edition. to or modify traffic control violation shall be cause for ordering material. Changes must Inspector, in writing, the name and
requirements as may be necessary immediate cancellation of the be approved by the City in 24 hour emergency telephone
J. Traffic control shall be provided to effectively control traffic and to permit. The City may at any time advance of work performance. number of a designated
for by the contractor in assure public safety. order immediate clean-up and the Contractor shall coordinate the "Competent Person" responsible for
accordance with the City's stoppage of work to accomplish work with affected utility agencies. construction safety as per
11. Before initiating any construction clean-up. OR-OSHA, Cha 437, Div. 3
standard specifications and, also, P�
in accordance with a Cit (job activity, the permit holder shall be 21. A temporary hard-surface patch Construction, Sub-division P -
City contacted by the City's inspector 16. Effective erosion control is (Cold mix A.C. or Hot Mix base Excavations. The contractor shall
specific) approved traffic control at 503-718-2472 to establish a required. Erosion control devices
plan. A copy of the approved lace, time, and date for o must be installed and maintained Paving) shall be placed on notify the City Inspector of ony/a/I
traffic control plan shall be P trenches within roadways at the assignment changes.
P reconstruction meetin meeting the Clean Water Services end of each da
available at the work area. P g' days work. No
and DEQ requirements. The City trench, on site or off-site, shall 27. It is the sole responsibility of the
4. Public roadwayshall not be closed 12. The permit holder or his may at any time order corrective be left at any time in an un-safe permit holder to provide for
contractor shall notify the City's action and stoppage of work to condition. The permit holder is proper right-of-entry and/or
to traffic, of any time, without Inspector, Andy Newbury at accomplish effective erosion responsible for and is liable for easements prior to starting work.
having first obtained written control.
approval from the City Engineer. 503-718-2472 twenty-four (24) hazards or damage resulting from Proof of right-of-entry or
The permit holder is responsible hours prior to commencing work, the prosecution of the work. properly executed easements, shall
P P 17. Property disturbed by construction
for provision of time/ notification twenty-four (24) hours prior to be provided to the City. The City
P y activity shall be seeded with a 22, Work provided for under the permit shall in no way be construed to
of traffic flow disruptions to area any staged inspection and after P P y
P standard grass mix; shrubs, shall include repair of existing be liable for the permit holders
• wide Emergency Services (Tigard completing work covered by the P 9
9 y ( 4 flowers, bark dust, existing signs,
Police Dept., Tualatin Fire & permit. facilities (roods, ditches, etc.) as failure to obtain or provide for
P pavement markings, mailboxes, etc. may be necessary, in the City proof of right-of-entry or
Rescue) and to Tri-Met and Tigard shall be reestablished, reinstalled
13. A copy of the permit and all Inspector's opinion, to overcome easements.
School District and other service attachments, and a copy of the or replaced, with like kind and deterioration or damage which
providers. approved construction plan and all material. occurred in conjunction with the
5. Advance warning of imminent amendments shall be available at 18. Effective drainage control is work authorized by the permit.
the work area. All work shall Corrective work shall be done at
traffic disruption shall be provided required. Drainage shall be
N to the general motoring public by
conform to the permit terms, the permit holders expense.
controlled within the work site and
placement of an advance
conditions and provisions and to
e� shall be so routed that adjacent
to the City approved permit plans, 23. The City's Inspector may, at his
� notification sign of each end of private property, public property
and approved plan amendments discretion, require provision of
the construction area 72 hours and the receiving system is not
and to the City's standards and tests and or reports from the
H (min.) before initiation of adversely impacted. The City may
`^ specifications and to these Genera! permit holder, the permit holders
Z� construction work. P at any time order corrective action P
Conditions. Changes to any of the and stoppage of work to engineer or contractor to validate
aforesaid must be approved by the claims of material or construction
E9 6. Access to existing properties shall accomplish effective drainage
be maintained at all times, City in advance of work control. adequacy/compliance. Such
including normal delivery service performance. tests/reports shall be provided at
hand moil service and if not, shall 19. Oregon law requires following the the permit holder's expense. �Fp PROFS
be cause for work stoppage until rules adopted by the Oregonc, `,
effective access is established. Utility Notification Center. Said 24. Existing monuments, property C� �r1G�NEF,Q
Nil rules are set forth in OAR corners, and survey markers shall
7. Traffic control devices, flog 952-001-0010 through OAR be protected. Replacement shall 6321 PE
n� persons, etc., shall be in place be at the permit holders expense.^
prior to initiation of construction },OREGON
14,
b 0
PAUL NF's
RENEWS: 12/31/2018
Revisions and Addenduma
ZD COMMERCIAL STREET SHEET
Description Dat s o. B S2
B/D 4113117 l APN UBLIC WORK8 DEPARTA�NT3125 S.W. H4LL BLVD. SANITARY SEWER REPAIR 2
GARD, OREGON 97223 OF
OICE: 503-639-4171GENERAL NOTES
AX: 503-624-0752 6
11JENGINEERING
WW.77GARD-OR.GOV FILE N
DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056
Install project sign.
CAUTION! I See Detail Sheet C 1
• Existing underground Connect latera/ NOTES.-
Connect new electrical line. to main with
inserto-tee. See Protect exit 1. See standard erosion control notes and trench
10" PVC mainline Contractor to protect. detail on monument
• to exist MH CAUTION! detail Sheet EC1.
HIGHWAY OVERPASS SW. 1879' Reset if
PACIFIC sheet 5.
See Detail Sheet C1 BOTTOM OF BEAM.- MID: 188.5' Existing underground necessary
SW- 186.3' NE 186.5' communication line. Exist SS MH 2. See Connect To Exist Manhole and project sign
HIGHWAY OVERPASS 1 detail Sheet C1.
Exist SS MH MID: 186.9' BOTTOM OF BEAM: Contractor to protect. SS02AO 10 -
SS02A012 NE: 184.x', _ _ - _ ._
" - - -%� - _... _ - - - _--- 3. Project signs are to be installed 48 hours prior
to construction
— HIGHWAY
4. All survey monuments shall be protected and
7�7
v — — preserved during construction. If any
COMMERCIAL ST. t _a _ 4t—
monuments are destroyed during construction
( p �° — _ the contractor shall have a surveyor replace
�— - - tis w the monument as required by low in Oregon
Revised Statutes 209.150.
Protect exit Protect exit Connect new
Protect exit OVERPASS monument monument 10" PVC mainline
monument Reset if to exist MH
Reset if Replace exist 10" Reset if LEGEND:
necessary concrete pipe with necessarySee Detail Sheet C1
necessary p p
354.90 LF of 12'" DOSIING
Install type 4 inlet PVC pipe
protection. See Area Install project sign. pp SCALE: 1" = 10'
Drion Detail Sheet EC1 See Detail Sheet C1 Telephone Line
SANITARY SEWER PLAN 10' S' 0 10' Telephone Manhole
Storm Manhole
SCALE: 1"=40'
Class 'B" Backfill Storm Line
180-- See trench detail on sheet 4 _ 80 0 Sewer Manhole
o
Sewer Line
f(ok
o - - Edge of Pavement
h
• I o ►� � - Centerline
L o Monument
LO
17 = Lo W 70 Overhead Power
O N, C-)O 2 ., 2 x
II o Electric
`O i Water Line
p EG at Ofi e �_ II
- Right-of-Way
W4J4W
- - — — — — — — — — k Q Water Meter
16 --160 Guy Wire
0Ele I I
34.90 L 12" 3034 PVC 0. 11%
; ( PROIPOSED
- - - �
e - - - SS Sewer Line
c6 v
N Abandoned + o
h 15 sewer latero a o ---450 -p PROFF
o O� vNi v~i w ��GIN fF�
*� 63213PE
N U -
N� M m /
o II a JJ�s 7� OREGON
14 -- + -- - 40 O T14,2� J
N 0+80 1+20 J60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+�80 5 0 p�,ly P
AUL
o W SANITARY SEWER PROFILE
RENEWS: 12/31/2018
er SCALE: 1"=40' HORIZONTAL, 1"=10' VERTICAL
Revisions and Addendums ENOMEERINe DIVISION COMMERCIAL STREET - SHEET
_
Description Date o.Ji
S3
PUBLIC WORKS DEPARTMENT
Bl� 13 17 1 ` 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 3
17G4RD. OREGON 97223 OF
VOICE: 503-639-4171
$ - N.,, v624-0752 PLAN & PROFILE 6
FILE N
DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 930561
6'
418"
±"CITY OF TIGARD
3- COMMERCIAL STREET
SANITARY SEWER REPAIR ~`r
4URATION: (fill in dates)
FUNDING SOURCE: SEWER MAINTENANCE
T—cut section
CONTRACTOR: (fill in name) 3" Level 2 HMAC, 1/2" dense minimum
IN 503-718-2472 (or match existing) over 3" Level 2 HMAC,
3/4" dense
NOTES �LT�1 1T1T1T�
1. Sign Background.- White, Retroreflective sheeting
2. Sign Legend: "ARIAL" font, Blue, Retroreflective sheeting
J. Sign Border: Blue, 1" Flush border 12" 12-
4. Decal will be provided by the City of Tigard NOTES.
5. Sign locations to be determined by Engineer. 1. Trench stabilization shall be placed prior
to placement of pipe bedding if required �b
PROJECT SIGN DETAIL 2. All compaction requirements per AASHTO Compacted
NTS T-99 and ODOT/APWA Spec 00405 Backfill 3/4"-0"
J. Compact trench pavement to 929 of rice aggregate
density AASHTO T-209
Trench
• Excavation
& Backfill
6" > 6"
MIN MIN
Pipe
N Grout Watertight With Nonshrink Existing Manhole
° Grout Provide Pvc Sanded Bell
Or Kornseal Boot 18" 6" Min
u Max New Pipe Below Pipe Bell
Remove And Re rout Existing
cFT
\
g 9 --
Channel As Required Trench Foundation
Stabilization (If Required)
a
N e p PRNO
OFS
Core Drill Manhole Tod'- Sip
Provide Pipe 0 Plus 4" 1. Joints to be tacked and sanded.
o Or As Required By 2. Sowcut shall be tack coated with 6321E
oBoot Manufacturer bituminous asphalt emulsion.
N�
o CONNECT TO EXISTING MANHOLE DETAIL PIPE TRENCHING DETAIL OREGON
e Not To Scale Not To Scale 20� AT 14,2 �OJ�
PA UL
RENEWS: 12/31/2018
Description
and Addsndums __- - aler�ERINo DIVISION COMMERCIAL STREET SHEET
esorl tion T Date o. B PUBLIC WORKS DEPARTMENT C1
BID 4113117 1 APN 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 4
77G4RD. OREGON 97223 OF
a VOICE: 503-639-4171
FWW WARD-OR.-cove DETAILS FILE N
DESIGN:RCW DRAWN:RCW CHECK:APN PROJECT NO: 93056 93056
1. PVC HUB SHALL CONFORM TO ASTM 3034, SDR 35 DRIVE INTO CENTER OF
RUBBER SLEEVE AFTER SLEEVE IS PLACED IN HOLE.
2.STAINLESS STEEL BAND SECURES UPPER HALF OF RUBBER SLEEVE TO THE
PVC HUB. STAINLESS STEEL BAND SHALL BE 300 SERIES, %a BAND WIDTH,
CADMIUM PLATED CARBON STEEL. AND ATTACHED WITH HEX HEAD SLOTTED
SCREW.
3.COMPLETE RUBBER SLEEVE INCLUDES A MOLDED SEGMENT THAT HOLDS IT IN
PLACE.
i
3
2
o�
y
.35 MINIMUM WALL THICKNESS
NOTE:
Ell 1. ALL INSERTA—TEE HOLES SHALL BE MACHINE DRILLED AND CORED.
2.INSERTA—TEE ARE ALLOWED IN NEWLY CONSTRUCTED SEWER MAINS 12" AND
LARGER INSIDE DIAMETER (I.D.).
H 3.SEWER MAIN SHALL BE TWO SIZES (NOMINAL I.D.) LARGER THAN THE INSERTA PROF
n —TEE. F
4.HOST PIPE SHALL BE MINIMUM .35" WALL THICKNESS. �GINFF
N� INSERTA- TEE u 2�r�,�-�
N aeanWater Services
OREGON
gN REVISED 12-06 •ur commitment i+clear. �2 �A Q
o DRAWING NO. 530 O T 14,ZQ J�
PAUL \A�
aRENEWS: 12/31/2018
Revisions and Addendums COMMERCIAL STREET SHEET
Description Date o. B E8oiHEEaq�e �� C 1
PLIBUt BID 4113117 1 APN ' 13125 WORKS DEPARTMENT
1 NT SANITARY SEWER REPAIR 5
13125 S.W. HALL BLVD.
11G4RD, OREGON 97223 OF
cs VOICE: 503-639-4171
FAX 503-624-0752 DETAILS 6
• WWW.77CARD—OR.GOv ILE N
DE81aN:RCW'DRAWN:RCW CHECK A NP PROJECT NO: 93056 93056
W
Standard Erosion Control Notes For Sites Less Than One Acre:
1. During periods of roinfoll and runoff, daily inspections of the erosion sediment controls MAY BE USED SHORT TERM
and discharge outfolls must be provided by someone knowledgeable and experienced in W/ UTILITY WORK AND W/
• the principles, installation, and maintenance of erosion and sediment controls. PHASING OF DEVELOPMENT
2. Construction activities must avoid or minimize excavation and creation of bare ground
from October 1 through May 31 each year.
J. During wet weather period, temporary stabilization of the site must occur at the end of
each work day. FLOW
4. Sediment controls must be installed and maintained on all down gradient sides of the -�►
construction site at all times during construction. They must remain in place until „
permanent vegetation or other permanent covering of exposed soil is established.
5. All active inlets must have sediment controls installed and maintained at all times
during construction. Unless otherwise approved, a surface mounted and attachable,
u-shaped filter bag is required for all curb inlet catch basins.
6. Significant amounts of sediment which leaves the site must be cleaned up within 24
hours and placed back on the site and stabilized or properly disposed. The cause of
the sediment release must be found and prevented from causing a recurrence of the
discharge within the some 24 hours. Any in-stream clean up of sediment shall be60�� AREA DRAIN
performed according to the Oregon Department of State Lands required time frame.
7. Sediment must not be intentionally washed into storm sewers, drainage ways, or water CATCH BASIN
bodies.
8. Sediment must be removed from behind all sediment control measures when it has
reached a height of one-third the barrier height, and prior to the control measures
removal. FLOW
9. Cleaning of all structures with sumps must occur when the sediment retention capacity �!
has been reduced by fifty percent and at completion of project.
10. Any use of toxic or other hazardous materials must include proper storage, application, El
and disposal.
11. The permittee must properly manage hazardous wastes, used oils, contaminated soil, •� DITCH BOTTOM FLOW
concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or
generated during construction. O Iq
12. The application rote of fertilizers used to reestablish vegetation must follow
manufacturer's recommendations. Nutrient releases from fertilizers to surface waters
must be minimized. Time release fertilizers should be used and care should be mode �1 �►,
• in application of fertilizers within any water way riparian zone.
14. Prior to any land disturbing activities, the boundaries of the clearing limits, vegetated DITCH INLET PLAN VIEW
buffers, and any sensitive areas shown on this plan shall be clearly delineated in the
field, unless otherwise approved. No disturbance is permitted beyond the clearing limits.
The contractor must maintain the delineation for the duration of the project. Note:
Vegetated corridors to be delineated with orange construction fence or approved equal. 6" overlap of bags.
15. Prior to any land disturbing activities, the BMPs (Best Management Practices) that must NOTES:
o be installed are gravel construction entrance, perimeter sediment control, and inlet 1. ADDITIONAL MEASURES MUST BE
N protection. These bmp's must be maintained for the duration of the project. CONSIDERED DEPENDING ON SOIL
16. if vegetative seed mixes are specified, seeding must take place no later than TYPES.
; i September 1st; the type and percentages of seed in the mix are as identified on plans
or as specified by the design engineer. 2. BIO-FILTER BAGS SHOULD BE
W 17. Watertight trucks must be used to transport saturated soils from the construction site. STAKED WHERE APPLICABLE USING
s An approved equivalent is to drain the soil on site at a designated location using
appropriate BMPs; soil must be drained sufficiently for minimal spillage. (2) 1"r,2"WOODEN STAKES OR
e18. All pumping of sediment laden water must be discharged over an undisturbed, APPROVED EQUAL PER BAG.
preferably vegetated area, and through a sediment control bmp (i.e. Filter bog). FOR FURTHER INFORMATION
19. The ESC plan must be kept onsite. All measures shown on the plan must be installed 3. WHEN JSING 30" BIO-BAGS TO ON DESIGN CRITERIA SEE
properly to ensure that sediment laden water does not enter o surface water system, PROTECT A CATCH BASIN YOU MUST CHAPTER 4 OF CLEAN WATER p PROpt
roadway, or other properties. HAVE 4 BAGS AND THEY SHALL BE SERVICES EROSION PREVENTION �,-
o 20. The ESC measures shown on this plan are the minimum requirements for anticipated AND SEDIMENT CONTROL GIN fF CJ
^ site conditions. During the construction period, these measures shall be upgraded as OVERLAPPED BY 6". PLANNING AND DESIGN MANUAL. �, �Q
H needed to maintain compliance with all regulations. 63213P
N 21. Written ESC logs are suggested to be maintained onsite and available to district
t� inspectors upon request. INLET PROTECTION OREGON
o�
gb 22. In areas subject to wind erosion, appropriate BMPs must be used which may include TYPE 4 ��O 'OT 14,2- J7
o the application of fine water spraying, plastic sheeting, mulching, or other approved aeanWater Service$ -QF �0
N measures. eur commitment is clear. PAUL
IQ
23. All exposed soils must be covered during wet weather period. DRAWING NO. 915 REVISED 12-06
� RENEWS: 12/31/2018
t Revisions and Addendume SHEET
2
Description — - - Date No.I E"° �a COMMERCIAL STREET EC
iv PUBLIC WORKS DEPARTMENT
Bio - - 4113117 1 APN 13125 S.W. HALL BLVD. SANITARY SEWER REPAIR 6
_
77G4RD, OREGON 97223 OF
a VOICE: 503-639-4171
- -
FAX: 50J-624-075 EROSION CONTROL NOTES s
WWW.AG4RD-OR.GOVOR.GOV ILE N
& DETAILS 93056
DESIGN:RCW DRAWN:RCW CHECK:APN I PROJECT NO: 93056