04/12/1977 - Minutes MINUTES
TIGARD DESIGN REVIEW BOARD
April 12, 1977 - 5 : 30 P.M.
Tigard City Hall
12420 S .W . Main Street - Tigard, Oregon
1. CALL TO ORDER
2 . ROLL CALL: Present : Hammes, Olson , McMonagle, Cook
Excused Absence : Goldbach
Staff : Edwards and Daniels
3 . APPROVAL OF MINUTES : The minutes of February 8, 1977 and March
22 , 1977 were approved as read.
4 . COMMUNICATIONS : None
5 . DESIGN REVIEW :
5 . 1 SDR 46-76 (Dickinsen)
A request for architectural review of color samples for a
previously approved building
A . Otto Van Walstyn , engineer, specified a wood cedar facia
with a dark stain and raked concrete and anodized trim.
(A color chart was submitted. )
Olson moved and Hammes seconded to approve the color
samples as specified.
The motion was approved by unanimous voice vote .
5 .2 SDR 10-77 (Lamb Weston)
A request by Hoffman Engineering for site plan and architec-
tural review of a proposed 7, 500 sq . ft . addition to an ex-
isting building at 6600 S .W . Hampton
I . Site Review
A. Staff Report :
Read by Daniels
B. Staff Recommendation :
Staff recommends approval with the following condi-
tions :
1. A non-remonstrance agreement be filed with the
city recorder for the improvement of S .W. Hampton
Street .
MINUTES
TIGARD DESIGN REVIEW BOARD
April 12, 1977 - 5 : 30 P.M.
Page 2
2. S .W. 68th Avenue be improved and a street tree
program be initiated (matching the standards ap-
proved for the Farmers Planned Development ) .
This improvement should be in conjunction with
the development of the Farmers Planned Develop-
ment .
3. An irrigation plan be received.
C. Applicant ' s Presentation :
Tom Whittaker, architect, presented pictures of the
site and explained the project .
D. Board Discussion :
o Discussion on S .W. Hampton Street and S .W. 68th .
Cook moved and Olson seconded for approval of the
site plan with the staff recommendations .
The motion was approved by unanimous voice vote .
II . Architectural Review :
o Tom Whittaker, architect, described specifications,
as per architectural plan , with colors to match the
existing building.
Olson moved and Hammes seconded to approve the architec-
tural plan as submitted.
The motion was approved by unanimous voice vote .
5 . 3 SDR 8-77 (Canterbury Square)
A request by Kolve and Kettleberg for site plan and archi-
tectural review of a proposed 1, 700 sq. ft . addition at
14363 S .W. Pacific Highway .
I . Site Review:
A. Staff Report :
0 Read by Daniels
MINUTES
TIGARD DESIGN REVIEW BOARD
low April 12, 1977 - 5 : 30 P.M.
Page 3
o Staff presented a memo with regard to past Plan-
ning Commission actions regarding Canterbury
Square.
B. Staff Recommendations :
Staff recommends approval with the following condi-
tions :
1. That a lighting system be installed in the pedes-
trian walkway .
2 . That a landscape plan and irrigation plan imple-
mentating Finding #5 be submitted (subject to
staff approval )
3. That a landscape plan for Canterbury Square ( in-
corporating all Planning Commission conditions)
be submitted prior to occupancy of the new addi-
tion .
C. Applicant 's Presentation :
o Jerry Kolve, applicant , presented the plan and
discussed the staff conditions .
o Don Kettleburg, applicant , protested Staff Recom-
mendations #2 and 3.
D. Commission Discussion :
o McMonagle suggested that an island be placed on
the end of the parking row, rather than a long
center strip .
Hammes moved and Cook seconded for approval with the
following conditions :
1. That the planter be installed in the last two
parking stalls
2. That a lighting system be installed in the pedes-
trian walkway
3 . That a concrete walk be installed from the pav-
ing in front to the paved area in back ,.
MINUTES
TIGARD DESIGN REVIEW BOARD
April 12, 1977 - 5 : 30 P.M.
"' Page 4
4 . That the sidewalk area in front of the new store in-
corporate a landscape bed and possible street furni-
ture (subject to staff review)
Cook moved and Olson seconded to amend the motion to
state : No building permit be issued until. staff re-
searches the conditional use permit landscaping require-
ments and for the applicant to submit evidence that all
conditions of the Conditional Use Permit were satisfied.
Cook moved and Olson seconded for a second amendment that
a detailed landscape plan for the entire site be submit-
ted to the Design Review Board prior to issuance of oc-
cupancy permit .
o McMonagle asked that staff investigate past condi-
tional use before the next meeting.
Vote on motion with 2 amendments :
The motion failed in a 1 to 3 voice vote , with Cook, Ol-
son, and McMonagle dissenting.
Vote on motion with first amendment :
The motion was approved by unanimous voice vote .
II . Architectural Review:
o Tom Vadnais, architect , stated that the building would
be brick, matching the existing building, with a shake
roof canopy .
Olson moved and Cook seconded to approve the architecture
as presented.
The motion was approved by unanimous voice vote .
5.4 SDR 9-77 (Burdick/Forbes)
A request by Construction Services , Inc . for site plan and
architectural review of a convenience market and office com-
plex at Greenburg Road and Shady Lane .
I . Site Review:
A. Staff Report :
MINUTES
TIGARD DESIGN REVIEW BOARD
April 12, 1977 - 5 : 30 P.M.
Page 5
o Read by Daniels
B. Staff Recommendation :
Staff recommends approval with the following condi-
tions :
1 . Cross easements for the joint driveway be re-
corded prior to issuance of the building permit
2 . S .W. Greenburg be improved to City standards ,
with paving 32 ft . from center line and an 8 ft .
sidewalk adjacent to the curb
3 . The existing trees be incorporated into the land-
scape plan wherever possible
4 . Evergreen trees be added to the rear landscape
area
5. A maple tree be added to the landscape island by
the service drive
6 . Irrigation plan and revised landscape plan be
submitted prior to the building permit
7. A signing program be established and returned to
Design Review
8 . Refuse container be screened on all sides (sub-
ject to staff approval )
C . Applicant ' s Presentation :
Harley Adams , Construction Services, explained the
project and discussed the staff. conditions .
D. Commission Discussion :
o Discussion on half-street improvement and systems
development charge
Cook moved and Hammes seconded for approval with
staff recommendations .
o McMonagle stated he would vote because he believed
Item #2 should be clarified by the City Council .
y
MINUTES
TIGARD DESIGN REVIEW BOARD
April 12 , 1977 - 5 : 30 P.M.
Aw Page 6
The motion failed in a tie vote , with Olson and Mc-
Monagle dissenting.
Olson and Cook moved for approval with staff recom-
mendations and that Staff Condition #2 be remanded
back to City Council .
The motion was approved by unanimous voice vote .
II . Architectural Review:
o Harley Adams stated that minor changes would be made
to the architecture plus a bicycle rack would be pro-
vided. Color samples were submitted .
Cook moved and Hammes seconded for approval as submitted.
The motion was approved by unanimous voice vote .
5 . 5 SDR 11-77 (Snyder Roofing)
A request by McKenzie Engineering for site plan and archi-
'WNW tectural review of a proposed storage tank and an architec-
tural addition to a previously approved structure at 12560
S .W . Hall .
I . Site Review:
A. Staff Report :
o Read by Daniels
B . Staff Recommendation:
Staff recommends approval with the following condi-
tions :
1 . Shore pine be extended around the eastern corner
of the fence
2 . The planting bed be widened to a minimum of 8 ft .
C. Applicant ' s Presentation :
o Dave Welch, McKenzie Engineering, agreed to staff
conditions and specified a buff color for the
tank.
1WW
a y
MINUTES
TIGARD DESIGN REVIEW BOARD
April 12 , 1977 - 5 : 30 P.M.
Page 7
D. Board Discussion :
Hammes moved and Olson seconded for approval with
the staff conditions .
II . Architectural Review:
o Dave Welch described the canopy and submitted color
samples .
Hammes moved and Cook seconded to approve the canopy as
presented.
The motion was approved by unanimous voice vote .
6. OTHER BUSINESS :
There being no other business, the meeting was adjourned at 8 : 30 .