03/09/1976 - Packet AGENDA Tigard Site Development Plan & Architectural Design Review Board March 9, 1976 - 5:00 p.m. General Telephone Building Main Street, Tigard, Oregon 1. CALL TO ORDER: 2. ROLL CALL: 3. MINUTES: January 27, 1976 and February 24, 1976 4. COMMUNICATIONS: � . 5. DESIGN REVIEW 5.1 SDR 2-76 (Benol/Safeway Store expansion/Tigard Plaza) A request for design review of a proposed expansion of the existing Safeway Store in Tigard Plaza at Pacific Highway and Hall Blvd. A. Site Development Plan Review 1. Staff Report 2. Applicant Presentation 3. Public Testimony 4. Staff Recommendation �+ 5. Rebuttal 6. Board Discussion & Action B. Architectural Design Review 1. Applicant Presentation 2. Board Discussion and Action 5.2 SDR 4-76 (Big "B" Thriftway/Canterbury Square) A request for review of a proposed addition to the service facilities at the Big "B" Thriftway in Canterbury Square. A. Site Development Plan Review 1. Staff Report 2. Applicant Presentation 3. Public Testimony 4. Staff Recommendation 5. Rebuttal 6. Board Discussion and Action B. Architectural Design Review 1. Applicant Presentation 2. Board Discussion & Action 6. OTHER BUSINESS 7. ADJOURNMENT STAFF REPORT Tigard Site Development Plan & Architectural Design Review Board March 9, 1976 SDR 2-76 Agenda Item 5.1 Site Development Plan Review A request for review of a proposed expansion of the existing Safeway Store in Tigard Plaza at SW Pacific Hwy. and Hall Blvd. Staff Findings 1. A variance request to allow the building expansion along the property line on Hall Blvd. The existing building line was non-conforming (would have been required to observe a 20 ' setback) and the Planning Commission reasoned that to impose that setback at this time would have been a hardship. 2. Conditions imposed, however, were that the applicant: a. provide landscaping and screening along the rear lot line adjacent to the shopping center's service areas, screening the mobile home park next door, b. provide a landscape setback area between parking and sidewalk on Hall Blvd. and Pacific Hwy. , but pro- viding that the existing number of parking stalls AW not be reduced C. shade trees in the front parking area sufficient to meet code requirements or provide 25/ shade of parking area 3. Applicant's preliminary site plan does not reflect these requirements; however, the applicant will present a site plan amended to show them at the meeting. 4. The site plan enclosed appears to be somewhat inaccurate, but does permit review of the site changes necessitated' by the building modification. 5. Staff will reserve judgment of landscape plan until the meeting. Staff Recommendation reserved , ; STAFF REPORT Tigard Site Development Plan & Architectural Design Review Board March 9, 1976 :giiw SDR 4-76 Agenda Item 5.2 Site Development Plan Review A request for review of a proposed addition to the service area of Big "B" Thriftway in Canterbury Square. Staff Findings 1. The service area (present and proposed) here is exposed to public areas and to direct views from adjacent apart- ments. It faces a day care center located behind Canter- bury. 2. The Tigard Code requirements presently pertinent to C-4 commercial development with respect to landscaping and screening appear to be basically unchanged from the require- ments under which this shopping center was built. 3. Design Review for the area to the rear of the shopping center was part of the approval given A & P Developers for the daycare center. This was, by ordinance, to have included landscaping, lighting, etc. 4. Landscape plan was submitted. 5. Staff is concerned by the lack of screening and visual amenity presently afforded by the existing development of the subject service area. It appears unlikely to be improved by the proposed addition. Staff _Recommendation to be advised. . .