03/23/1976 - Packet -------------
AGENDA
Tigard Site Development Plan & Architectural Design Review Board
March 23, 1976 - 5:00 p.m.
*kW General Telephone Building
12460 SW Main St. , Tigard, Oregon
1. CALL TO ORDER:
2. ROLL CALL:
3. MINUTES:
4. COMMUNICATIONS:
5. DESIGN REVIEW:
5.1 SDR 7-76 (Jerry's Barber Shop)
A proposed commercial building which will stand in the
place of the wood frame building now housing Jerry's
Barber Shop, which will be removed from this location
A. Site Development Plan Review
1. Staff Report & Recommendations
2. Applicant's Presentation
3. Board Discussion and Action
B. Architectural Design Review
1. Applicant' s Presentation
2. Board Discussion and Action
5.2 SDR 6-76 (Bantrust Industrial Park Expansion)
An expansion of the Bantrust Industrial Park on SW 72nd,
south of Boones Ferry Road
A. Site Development Plan Review
1. Staff Report & Recommendations
2. Applicant's Presentation
3. Board Discussion and Action
B. Architectural Design Review
1. Applicant's Presentation
2. Board Discussion and Action
6. OTHER BUSINESS:
7. ADJOURNMENT:
STAFF REPORT
Tigard Site Development & Architectural Design Review Board
March 23, 1976
Project Review
SDR 6-76 (Bantrust Industrial Park Expansion)
An expansion of the Bantrust Industrial Park on SW 72nd,
south of Boones Ferry Road
STAFF FINDINGS
1. This project was approved as a conditional use by Washington
County and has recently been annexed to Tigard. See sheet
1 of 1 to see the relationship of the proposed development
to the larger project.
2. The submitted landscape plan (sheet 11) meets all Tigard
code requirements with the exception that an irrigation
plan has not been submitted.
3. The area marked as "yard" adjacent I5 could use evergreen
screening -- an extension of the Scotch Pines shown to the
south, possibly mixed with some of the London Plain trees
(deciduous) , would accomplish this.
STAFF REPORT
Tigard Site Development Plan & Architectural Design Review Board
March 23, 1976 - 5:00 p.m.
vow PROJECT REVIEW
SDR 7-76 (Jerry's Barber Shop)
A proposed commercial building which will stand in the place
of the wood frame building now housing Jerry's Barber Shop
which will be removed from this location.
STAFF FINDINGS
1. On March 16, 1976, the Planning Commission approved a
setback and parking variance for this location. The
setback variance allows the building to be within 22 ft.
of the sidewalk edge and the parking variance allows con-
struction of the facility without provision of off-street
parking.
2. The landscaping shown between the building and the sidewalk
does not conform with the landscaping now being placed in
this area as part of the Repac Demonstration Landscape
Beautification Plan. Mr. Hakola has paid his portion of
the landscaping costs for this project and the landscaping
will be installed by City crews. Therefore, staff would
prefer to have the Design Review Board delegate the
responsibility for providing landscaping which will con-
form to the overall beautification plan to Repac.
3. The building setback approved by the Planning Commission
will place this building on line with the adjacent
restaurant building to the west.