09/14/1976 - Packet AGENDA
Design Review Board
September 14 , 1976
General Telephone
12460 SW Main - Tigard, Oregon
1 . CALL TO ORDER:
2. ROLL CALL:
3. APPROVAL OF MINUTES :
4 . COMMUNICATIONS :
5. DESIGN REVIEW
5 . 1 SDR 12-76
A request by J. A . Atwood Corp . for design review of a
proposed duplex development on S .W. Hill Street .
A. Site Development Plan
B. Architectural Design Review
5 . 2 SDR 34-76
A request by Victor Seeber for design review of a proposed
11 ,000 square foot industrial warehouse at S .W. Grant St .
and S .W. Tigard Avenue .
A. Site Development Plan
B. Architectural Design Review
5 . 3 SDR 35-76 A \ r a �� M1tlnA
A request by Sound I for review of a proposed freestanding
sign at 13555 S .W. Pacific Highway .
A. Site Development Plan
B . Architectural Design Review
5 .4 SDR 26-76
A request by Payless Northwest , Inc . for design review of a
proposed commercial shopping center at S .W. Main St . and
S .W. Scoffins Street .
A. Site Development Plan
6 . OTHER BUSINESS
7. ADJOURNMENT
STAFF REPORT
Agenda 5 . 1
Design Review Board
September 14 , 1976
General Telephone
12460 S .W. Main - Tigard, Oregon
DOCKET: SDR 12-76
REQUEST: Site plan and architectural design review of two duplexes
in an "A-2, Multi-Family" zone.
LOCATION: S .W. Hill Street east of S .W. Ash Street (Wash . Co . Tax
Map 2S1 2BD, Tax Lot 200) .
APPLICANT: J. A. Atwood Corp.
I . BASIC FACTS
1 . The site is designated "Urban Medium Density" residential-
duplex on the Neighborhood Plan I and zoned "A-2, Multi-
Family Residential" .
2 . This lot was created by a minor land partition (MLP 3-76)
approved by the Planning Commission on August 3, 1976 .
3 . The flood plain elevation at this site is 148 ' mean sea level .
II . FINDINGS
1 . The applicant is requesting review of the first phase of a
proposed multi-family duplex development .
2 . The entire site is primarily flood plain with the building
sites composed of fill in the portion of the lot outside
of the flood plain to bring it to street grade with 2 : 1
slopeback ( fill permit issued February 1976) .
3. Based on the duplex density set forth in the Neighborhood
Plan I and the amount of developable land not in the flood
plain a total of eight units may be constructed on the site .
Four units, in duplex structures, may be built in this phase .
At such time as S .W. Hill Street or S.W. Ash Street is ex-
tended to provide better neighborhood traffic circulation
the remaining four units may be built on the remainder of
the 2 .26 acre parcel .
4 . The proposed site plan shows only the first phase and does
not show how the second phase fits on the site .
5 . The amenity of the site is Fanno Creek and the developing
greenway system. The proposed site plan does not utilize
this amenity and instead backs onto it and offers a deck
over the garages onto the street side of the building.
'""' 7 . No sidewalks are shown .
STAFF REPORT
Agenda 5. 1
Design Review Board
September 14, 1976
Page 2
8 . The area in back of the units shows bark dust with random
tree and shrub plantings. This arrangement would not
provide a pleasant or clean situation for the tenants
and would be difficult to keep weed free.
9 . The east and west patio areas show only low shrubs along
the property lines which will not adequately screen the area.
10 . No irrigation system is shown.
11 . The entire site does not contain adequate amounts of plant
material necessary for good design and weed control .
12. No specification for the fence between the patios or the
front door areas is shown.
RECOMMENDATIONS :
1 . A 50 ' wide greenway easement be provided and a 6 ' pedestrian/
bike path to City standards be constructed along Fanno Creek.
2 . The flood plain area be cleared and maintained as usable
open space for the future tennants .
3 . The remainder of the buildable area be planted in turf and
maintained until the remaining phase of this development is
initiated.
4 . Lawn be extended to the backyard and patio areas .
5 . Additional shrubs and trees be added between the patios and
the property lines.
6. Hose bibbs be placed 50 ' on center.
7. Adequate amounts of plant material be added to the site.
8 . Patio screen of the same material as the building.
9 . Revised landscape plan be subject to staff approval .
J
STAFF REPORT
Agenda 5 . 2
Design Review Board
September 14, 1976
General Telephone
12460 SW Main - Tigard, Oregon
DOCKET: SDR 34-76
REQUEST: Review of a proposed 11 , 000 square foot industrial building.
LOCATION: Southwest corner of S .W. Tigard Street and S .W. Grant Avenue.
APPLICANT: Victor Seeber
I . BASIC FACTS
1 . The site is designated "Industrial" on the Tigard Community
Plan and zoned M-4, Industrial Park" .
2. The Planning Commission granted a conditional use permit
(CU 19-76) on 7/20/76 for an industrial building and a
variance (V 9-76) reducing the sideyard setback from 50 ' to
30 ' was granted on September 7, 1976. Conditions of the
conditional use permit were
1 . An agreement to participate in local improvement district
on S .W. Tigard and S .W. Grant to be executed prior to
issuance of building permits.
2 . Dedication of 10 ' along S .W. Tigard St . and S .W. Grant St .
be executed prior to issuance of building permits .
3. Design Review Board require screen planting along the
west property line to provide an effective screening to
the single family dwelling to the west .
4 . Adequate provision for continuation of and access to
the Fanno Creek Greenway be developed. This normally
involves a 50 ' dedication on both sides of Fanno Creek.
II . FINDINGS
1 . The applicant is requesting design review of a proposed 11 , 000
sq. ft . industrial building in an M-4 zone.
2 . The site is relatively flat sloping gently toward Fanno Creek.
It is presently used as a pasture .
3. The surrounding land use is a single family residence on the
west , and two single family residences on the east , the Fanno
Creek flood plain on the south and the Burlington Northern
Railroad right-of-way on the north.
4 . The proposed site plan conforms to the setback, building
height landscaping, off-street parking and access requirements
of the Tigard Municipal Code.
5. Adequate water and sewer service are available to serve the
site.
f
STAFF REPORT
Agenda 5 .2
Design Review Board
September 14, 1976
Page 2
6 . All conditions attached by the Planning Commission have been
satisfied or are in the process of being so .
7. NPO II states the need of maintaining a natural screen of
plant material along Fanno Creek.
8. The landscape plan specifies 16 Mahonia Oregon Grape along
the back parking lot line, Mahonica should be 4 ' on center
for adequate screening.
9 . Of the seven existing oak noted on the plan several are
either dead or in a deteriorated condition.
10. The landscape plan shows low plantings with an occassional
small tree and a few street trees . More street trees would
be needed to screen the site and keep the building in scale .
11 . In general , the plant materials are spaced too far apart
for adequate impact and weed control .
12 . The planter in the center corner on the east side of the
building specifies three skimmia. The addition of a vine
maple in that spot would help soften the effect of the building.
13. The southeast corner specifies lawn area around the hose bibb .
This amount of lawn would only be a maintenance problem.
RECOMMENDATIONS :
1 . An additional 10 Mahonia should be added along the back
parking lot line .
2. Applicant and staff determine which of the existing oak
trees should be removed. New oak trees 1" - 12" caliper
8 ' tall shall be planted in their stead and additional oak
trees be added along the west property line.
3 . Large shade trees (preferably oak) and shore pine should be
planted along Grant and Tigard St . ( shown in red on the plan) .
4 . More deciduous and evergreen shrubs be added to the landscape
buffer.
5. A vine maple be added to the center corner planter on the
east side.
6. Gravel or steeping stones be added around the hose bibb at
the southeast corner and shrubs be added to the remaining
��`
area.
STAFF REPORT
Agenda 5. 3
Design Review Board
September 14, 1976
General Telephone
12460 SW Main - Tigard, Oregon
DOCKET: Review of a proposed free-standing sign .
LOCATION: 13555 S .W. Pacific Highway
APPLICANT: Sound I
BASIC FACTS :
1 . The site is designated "Residential Commercial" on the Tigard
Community Plan and zoned C-3 (General Commercial ) .
2 . The Tigard Community Plan states that the policy along Pacific
Highway should be to "establish high design standards for
signing and appearance" . "The development of individual
properties in these areas should take into account the traffic
safety and visual problems associated with strip commercial
development . "
FINDINGS :
1 . The sign is shown to be a revolving illumated sign 10 ' x 6 '
for a total of 120 square feet .
2 . A revolving illuminated sign 10 ' x 6 ' - 24 ' high would only
add to the strip commercial look and add another visual dis-
traction to the traveling public thus having an adverse impact
on public safety.
3. Pacific Highway has an average daily load of 32, 000 vehicles.
4 . Section 16. 36 .040 (8) of the Tigard Municipal Code prohibits
signs to project over the right-of-way.
RECOMMENDATIONS :
In keeping with the aim to improve the visual quality of Pacific
Highway staff recommends that the sign be non-revolving and that
the size of the sign be limited to total surface area.
STAFF REPORT
Agenda 5.4
Design Review Board
September 14 , 1976
General Telephone
12460 SW Main - Tigard, Oregon
DOCKET: SDR 26-76
REQUEST: Site plan review of a proposed commercial shopping center .
LOCATION: S .W. Main Street and S .W. Scoffins Street
APPLICANT: Payless Northwest , Inc .
I . BASIC FACTS
1 . The site is designated "Retail Commercial" on the Neighborhood
Plan I and zoned C-3M P.D. , Main Street Commercial Planned
Development" .
2 . The planned development allowing this shopping center was
approved by the City -Council 11/10/75 with the following
conditions :
A. Payless provide storm sewer subject to Public Works
approval .
B. That no left turns be permitted from or onto Pacific
lilmwHighway between Main Street and Hall Blvd. and that a
"No Left Turn" island be provided by the applicant on
Pacific Highway.
C. The land be dedicated for public street right-of-way as
shown for Scoffins Street widening and the Main Street
realignment .
D . That Scoffins Street be developed to a 36 ' roadway and
a 60 ' right-of-way to the south property line .
E . That each street improvement recommendation contained
in Exhibit "C" above re-executed and placed by the
applicant .
F . That all streets, public facility improvements be made
to meet City standards including but not limited to
curbs, sidewalks and storm drainage.
3. The architectural design for the main building was approved
by Design Review Board 7/27/76 .
II . FINDINGS
1 . The applicant is requesting site development plan review of
a proposed shopping center for Payless, Albertson ' s and
"*" undetermined lease spaces and buildings .
'i
STAFF REPORT
Agenda 5 .4
Design Review Board
September 14, 1976
Page 2
2. The proposed site plan is in substantial conformance with
the site plan approved by the City Council in 11/75.
3 . The landscaping plan presents level landscape beds bordering
the site. These beds consist mainly of shade trees and ivy
with a few shrubs. This will not sufficiently screen the
expansive parking area delineated on the plan.
4 . The center parking strip shows an eight foot wide sidewalk
leading from the parking area to the store . No wheelblocks
are shown on the plan and it would be possible for a car
overhang to obstruct pedestrian traffic .
5. No curbing for the landscaped areas has been specified.
6 . Landscape islands for the parking lot should be specified
every 70 ' according to Section 18 . 58. 060 ( 1) of the Tigard
Municipal Code. Several areas on the plan ignore this
requirement .
7. Dedication of the area to be created by Main Street realign-
ment has yet to be accomplished. In addition, a statement
of the developers intended share in improving this site has
not been received.
8 . No site preparation for the landscaped areas has been speci-
fied.
9 . No specification are shown as to screening of the garden shop
area.
10 . Site inspection of similar facilities has shown that they
generate a considerable amount of litter. Litter containers
and daily cleanup will be necessary for a facility of this
size.
11 . No provision for bicycles have been made, without stands
bicyles would likely end up chained to trees or left in
front of the doors .
12 . The area will be comprised of several owners and tenants
therefore provisions should be made for landscape maintenance
and an automatic sprinkler system.
RECOMMENDATIONS :
1 . All landscaped areas surrounding the perimeters of the pro-
ject should be bermed and medium sized shrubs added to the
plan . This is necessaryin order
to partially screen the
great expanse of parking lot proposed.
STAFF REPORT
Agenda 5.4
Design Review Board
September 14 , 1976
Page 3
2. Areas designated for future expansion should be landscaped
and bermed where they abut public roadways. This is parti-
cularly important in order to clearly define the entrance
drives off of Main and Scoffins and to screen the service
areas .
3 . Wheelblocks should be added on both sides of the center
parking strip .
4 . All landscaped areas be curbed where adjacent to parking
and driving areas .
5. Additional landscape islands be added in the parking areas
to provide landscaping 20 ' on center for both rows of each
parking row and planted to correspond with other islands .
6 . Dedication of the area between Main and Pacific should be
accomplished. In addition, because it is not feasible to
landscape this area until the plans for "Liberty Park" are
completed by the Park Board, the staff recommends that the
developers be asked to provide minimal site improvements
for this area in the form of seeding and irrigation .
Additional landscaping will be provided by adjoining busi-
nesses and the public . The public share will consist
ivjw partially of federal matching funds already committed.
Staff determines the cost of providing the developer' s
share to be $,,25 per square foot . The area in question
is 27, 800 sq. ft . and this share results in a $7, 000 con-
tribution for this project . Either a cash contribution or
a committment of labor and materials will satisfy this condi-
tion .
7. Improved top soil surround the root balls of all plants and
the hole for the roots be 12 to 2 times the size of the root
system. All trees to be staked and guyed.
8. Peat moss be worked into the top 9-12" of soil in order to
provide a more suitable medium for the ivy groundcover.
9 . The garden shop area be completely screened from the road
and additional plant materials added to the abutting landscape .
10. Landscape plan for the area adjacent Hall and an irrigation
plan be submitted and approved by staff .
11 . A regular maintenance program be established that would
provide litter cleanup. In addition to this trash recepticals
should be provided.
12 . Bike stands be available on the site.
13. A landscape maintenance firm be hired for the development
and an automatic sprinkler system installed.
STAFF REPORT
Agenda 5 .4
Design Review Board
September 14, 1976
Page 4
14 . A landscape and improvement plan for the connection to Hall
Blvd. has not been submitted as previously requested by
staff and should be submitted for staff approval .
15. An irrigation plan has not been submitted and should be
submitted for staff.
STAFF REPORT
Agenda 5.4
f Design Review Board
September 14 , 1976
RECOMMENDATIONS :
Staff recommends approval with the following conditions :
1 . All landscaped areas surrounding the perimeter of the project
should be planted in such a manner so as to screen the park-
ing lot from the public view. This could be accomplished
by the addition of more shrubs and/or berms.
2 . Areas designated for future expansion should be landscaped
where they abut public roadways . This is particularly
important in order to clearly define the entrance drives
off of Main and Scoffins and to screen the service areas .
3. Wheelblocks should be added on both sides of the center
parking strip and perimeter parking.
4 . Additional landscape islands be added in the parking areas
to provide landscaping 70 ' on center for both rows of each
parking row and planted to correspond with other islands.
WW 5. Dedication of the area between Main and Pacific should be
accomplished. In addition, because it is not feasible to
landscape this area until the plans for "Liberty Park" are
completed by the Park Board, the staff recommends that the
developers be asked to provide minimal site improvements
for this area in the form of seeding and irrigation .
Additional landscaping will be provided by adjoining busi-
nesses and the public. The public share will consist
partially of federal matching funds already committed.
Staff determines the cost of providing the developer ' s
share to be 25� per square foot. The area in question is
27, 800 sq . ft . and this share results in a $7,000 contribu-
tion for this project . Either a cash contribution or a
committment of labor and materials will satisfy this condi-
tion.
6 . The garden shop area be completely screened from the road
and additional plant materials added to the abutting landscape
submitted to staff .
7. Irrigation plan for the corner of Scoffins and Main be sub-
mitted for staff approval .
8 . A regular maintenance program be established that would
provide litter cleanup. In addition to this trash recepti-
cals should be provided.
9. Bike stands be available on the site .
STAFF REPORT
Agenda 5 .4
Design Review Board
September 14 , 1976
10 . A landscape maintenance firm be hired for the development .
11 . No parking be allowed in the area north of the building
designated shops . This area be landscaped subject to staff
approval .
12. The area designated for parking in front of Albertsons,
Payless, and shops be landscaped and loading zones estab-
lished (subject to staff approval) .