09/28/1976 - Minutes MINUTES
Tigard Site Development and Architectural Design Review Board
September 28, 1976 - 5 : 00 P.M.
General Telephone
12460 S .W. Main - Tigard, Oregon
1 . CALL TO ORDER: Meeting was called to order at 5 : 15 by Chairman
McMonagle .
2. ROLL CALL: Present : Hammes, McMonagle, Cook and Goldbach.
Excused Absence: Olson
Staff Present : Daniels, Edwards
3 . MINUTES : Staff informed the Board that the minutes of August
24, 1976 had been corrected. Cook moved and Goldbach
seconded to approve the minutes of August 24 and September
14, 1976 . The motion was approved by unanimous voice vote.
4 . COMMUNICATIONS : None
5 . DESIGN REVIEW
5. 2 SDR 29-76 Fowler Junior High Parking Lot
Review of a landscaping plan for a new 30 space parking lot
at Fowler Junior High School .
Site Development Review
A. Staff Report : Read by Edwards
B . Staff Recommendations :
Staff recommends approval with the following conditions :
1 . Norway Maple be spaced 35 ' o .c.
2 . All trees be staked.
3. An irrigation plan be submitted for staff approval .
4 . Shade trees perferably Norway Maple be planted on the
east and west side of the future building.
5 . Trees be planted in the two landscape islands in the
central parking area as per prior commitment .
C. Applicant ' s Presentation:
o Mr. Phillip Rice, applicant , informed the board that the
landscaping would be watered by surface irrigation from the
building and that trees on either side of the concession
stand would be a safety hazard.
o Goldbach stated that threes would be an asset to the site
MINUTES
Tigard Design Review Board
September 28, 1976
Page 2
and lower branches could be trimmed for better vision .
o Staff informed the board that the trees would also help
block the glare of the lights from the field.
o McMonagle asked that larger trees be provided and that
the school submit a written plan to staff stating the
intended irrigation .
o Hammes moved and Cook seconded to accept the plan as
presented with the staff recommendations and with item
#3 reading that surface irrigation by way of a hose
system be provided, that the Norway Maple be a minimum
of 12 - 14 ' - 2 to 22" caliber and #4 with staff approval .
The motion was approved by unanimous voice vote.
5. 1 Atlas Land Company
Review of a revised site plan and architectural design of an
industrial building at 9380 S .W. Tigard Street previously
approved.
Site Development Review
44W A. Staff Report : Read by Daniels
B . Staff Recommendation:
Staff recommends approval of the expansion with the same
conditions as attached originally with the exempting of
the building from the greenway easement .
C. Applicant ' s Presentation :
o Mr. Allred, applicant , informed the board that he
would like to expand 4, 100 sq . ft . at this time rather
than at a later date.
o Cook questioned whether the compaction tests had been
made.
o Allred stated that his engineer had studied the situa-
tion and spread footings would be used.
Cook moved and Goldbach seconded to approve the proposal
with the staff recommendation .
The motion was approved by unanimous voice vote .
6. OTHER BUSINESS
o Staff informed the board that the Design Review Board ordinance
was in the process of being revised.
N'
MINUTES
Tigard Design Review Board
September 28, 1976
Page 3
o McMonagle asked that Design Review Board be given the
authority to table items, approve free-standing signs and
that a site plan check list be given to all applicants .
7. ADJOURNMENT:
There being no other business the meeting was adjourned at
9 : 00 P.M.