Loading...
01/16/1975 - Packet AGENDA Tigard Site Development and Design Review Board Regular Meeting, January 16, 1975 Twality Junior High School - Lecture Room 14650 S. W. 97th Avenue , Tigard, Oregon Meeting Time : 4:30 p.m. 1. CALL TO ORDER 2. ROLL CALL 3. APPROVAL OF MINUTES 3.1 Regular Meeting of December 5, 1974 4. SITE PLAN AND ARCHITECTURAL REVIEW 4.1 SDR 3-75 (R. A. Gray - Tigard Industrial Park) A request by R. A. Gray Construction Company for review of phase IV in the Tigard Industrial Park on Tigard Street to construct an industrial building. (Tax Map 2S1 2BA, Tax Lot 300) . + Site Development Plan Review Staff Findings Presentation by Applicant Board Discussion and Action Architectural Review Presentation by Applicant Board Discussion and Action 5. OTHER BUSINESS 6. ADJOURNMENT SITE DEVELOPMENT AND DESIGN REVIEW BOARD Staff Report January 16, 1975 Agenda Item 4.1 SDR 3-75 ( R. A. Gray & Co. ) Site Development Plan Review for site located at 9920 S. W. Tigard St. , within the Tigard Industrial Park and zoned M-4 (NE 1/4 of the NW 1/4 of Sec. 2, T2S, R1W, W. M. ) Staff Findings 1. This project has been considered previously as: Site Design Review 6-74 (approved in April, 1974) Conditional Use 5-72 (approved in March, 1972; April, 1974) Ordinance 72-31 (passed in April, 1972) Variance 2-72 (approved in March, 1972) 2. Two different previously-approved site plans for the overall project development -- differing variously from the one submitted with this proposal in building sizes and lo- cations; parking lot dimensions, number of "head-in" park- ing lot stalls and aisle widths and landscaped areas are on file with the City of Tigard. 3. A dedicated street (Co. Rd. 893) traverses the site from east to west more or less through the center of the site. Planting areas and parking stalls are presently installed in the street right-of-way. 4. The building proposed as "Tigard III" is possibly partly in the right-of-way of Co. Rd. 893. 5. The sideyard setback established by variance for "Tigard IV" project does not apply to presently proposed "Tigard III" . Tigard III is shown 20 ' from a side lot line abutting an R-7 zone where a 50 ' side yard setback is required (18. 52.020 TMC) . 6. Access drives within the presently proposed "Tigard III" area providing access to the rear of the site are inadequate for truck maneuvering. 7. Plantings as required in parking areas are not provided (18.58.060 TMC) . 8. Present and proposed landscaping is diminutive in scale and ought to be supplemented with large, hardy, native trees. 9. Site inspection showed differences between approved drawings and present (existing) site development. a. front yard required landscaping (20 ft. ) appears to be 10 ft. + as built b. required side yard landscaping and sight obscuring fence or hedge has not been installed c. A portion of the agreed to parking area is presently used for storage of building materials and has not been striped. d. Front parking area appears to differ in location and configuration from approved. e. Planting area at north end of "Tigard III" appears to be reduced in size fr m approved. 10. Several violations of Tigard Municipal Code Chapter 18.52.010 and 18. 52.020 (permitted uses in the Industrial Park zone) were noted by staff on site inspection: a. retail sales conducted in building known as "Tigard I" b. outside storage of heavy equipment C. outside storage of building materials d. gymnastic center in building known as "Tigard IV" e. contractors offices Staff Recommendation The staff recommends that the board deny this request as sub- mitted. The staff further recommends that the board could consider tabling until such time as : 1) Plans accurately depicting present development, to include location and sizes of parking spaces , curbs, walkways, luminaires , lot lines, vegitation, buildings , utilities, drains , service areas, loading areas and sprinkler system. 2) vacates of Co. Rd. 893 is accomplished 3) conditions of CU5-72 (and ordinance 72-31) are met or changed 4) provisions of Chapter 18. 52, TMC, (Industrial Park Zone) with respect to permitted uses are met by either abatement of proscribed uses or by application for conditional use where the use is conditionally acceptable SDR Staff Report - January 16, 1975 - page 2