Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
OFFICE COPY Hc • E HORN CONSULTING ENGINEERS LLC Structural Calculations: Project MSHD-16-07 RECEIVEP Date: 5/25/17 Project: New House: MAY 2 5 21117 Lot 10 Medallion Meadows Tigard, OR CITY 01,'TI CARD 311iLDING DI VISION Subject Sheet Vs 10' Retaining Wall RW10— RW12 REVISION P• "ic-4c• LP 51 1' •E ,0 12 '‘'3 4110 J. VON- CITY OF TIGARD Expires: 6-30-17 REVIEWIp FOR CODE COMPLIANCE Approved: J j OTQ I I Permit#: rn_cl-rk C'" 00 Address: j q- 7)1 Suite#: sy: Date • The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns. All retaining wall designs should be verified by the geotechnical engineer of record prior to construction. Failure to do so invalidates their design. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design, Horn Consulting Engineers shall have no liability(expressed,or implied),with respect to the means and methods of construction workmanship or the actual materials used in construction. Horn Consulting Engineers shall have no obligation of liability,whether arising in contract(including warranty),Tort(including active,passive,or imputed negligence) or otherwise,for loss or use,revenue or profit,or for any other incidental or consequential damage. CAPITAL PLAZA SUITE 135 9320 SW BAROLIR 133.\"17 • PORTLAND, OR • 97219 PHONE. 503.892.5782 • lim‘11 DAVE@HORNICIt (,0‘I PO° Use menu item Settings>Printing&Title Block Title Lot 10, Med Meadows Page: 1 to set these five lines of information Job#; Dsgnr: DJH Date: 25 MAY 2017 for your program. Description.... This Wall in File:cAusers\davekdocurnentslretainpro 10 project fileslmshd_medallion lot 10_revised Reillif'PTO(c)1967-2016, Sued 11.16.11.12 License:KW-06056184 Cantilevered Retaining Wall Code: IBC 2009,ACI 318-08,ACI 530-08 License To:HORN CONSULTING ENGINEERS Criteria I Soil Data I Retained Height = 10.00 ft Allow Soil Bearing = 2,000.0 psf Wall hht above soil Equivalent Fluid Pressure Method eig = 0,00 ft Active Heel Pressure = 35.0 psf/ft Slope Behind Wall = 0.00 = Height of Soil over Toe = 6.00 in Passive Pressure = 250.0 psf/ft Water height over heel = 0.0 ft Soil Density,Heel = 110.00 pcf Soil Density,Toe = 0.00 pcf FootingllSoil Friction = 0.450 Soil height to ignore for passive pressure = 12.00 in .!1-_-__:1_4,-----• __ _ _ A Surcharge Loads I Lateral Load Applied to Stem 0 Adjacent Footing Load-11 Surcharge Over Heel = 50.0 psf Lateral Load = 0.0#/ft Adjacent Footing Load = 0.0 lbs Used To Resist Sliding&Overturning ...Height to Top = 0.00 ft Footing Width = 0.00 ft Surcharge Over Toe = 0.0 ...Height to Bottom = 0.00 ft Eccentricity = 0.00 in Used for Sliding&Overturning Wall to Ftg CL Dist = 0.00 ft ‘ Load Type = Axial Load Applied to Stem (Service Level) Footing Type Line Load Base Above/Below Soil Axial Dead Load = 750.0 lbs Wind on Exposed Stem= 0.0 psf at Back of Wall - 0.0 ft Axial Live Load ntricity == 750.0 lbs (Service Level) Poisson's Ratio = 0.300 Axial Load Ecce0.0 in Earth Pressure Seismic Load 1 -. Method :Mononobe-Okabe/See d-Whitman Kae for seismic earth pressure = 0.380 Added seismic base force 480.8 lbs KOgniaireekNrirtisasure Design Kh = 0.2009 = 0.277 = 0.103 Using Mononobe-Okabe/Seed-Whitman procedure Aw il Use menu item Settings>Printing&Title Block Title Lot 10 Med Meadows Page: 2 to set these five lines of information Job*: Dsgnr: DJH Date: 25 MAY 2017 for your program. Description.... This Wail in File:cAusersidavetdocumentsVetainpro 10 project files1mshd_medallion lot 10_revised RetainPro(c)19$7-2016, MIN 11.16.11.12 License:KW-060561114 Cantilevered Retaining Wall Code: IBC 2009,ACI 318-08,ACI 530-08 License To:HORN CONSULTING ENGINEERS Design Summary I Stem Construction 0 Bottom -L Stem OK Wall Stability Ratios Design Height Above Ft g ft= 0.00 Overturning = 6.02 OK Wall Material Above"Ht" = Concrete Sliding = 2.06 OK Design Method = LRFD ASD LRFD Thickness = 8.00 Total Bearing Load = 13,083 lbs Rebar Size = # 5 ...resultant ecc. = 6,59 in Rebar Spacing = 4.50 Rebar Placed at = Edge Soil Pressure @ Toe = 1,637 psf OK Design Data Soil Pressure @ Heel = 855 psf OK fb/FB+fa/Fa = 0.751 Allowable = 2,000 psf Total Force(7, Section Soil Pressure Less Than Allowable ACI Factored @ Toe = 2,292 psf Service Level lbs= ACI Factored 6) Heel = 1,197 psf Strength Level lbs= 3,713.1 Footing Shear 110 Toe = 24.8 psi OK Moment...Actual Service Level ft-#= Footing Shear @ Heel = 1.8 psi OK Strength Level ft-#= 14,557,2 Allowable = 75.0 psi Sliding Calan Moment Allowable = 19,388.8 Lateral Sliding Force = 2,773.3 lbs less 100%Passive Force= - 156.3 lbs Service Level psi= less 100%Friction Force = - 5,550.0 lbs Strength Level psi= 50.0 Added Force Req'd = 0.0 lbs OK Shear.. ..Allowable psi= 75,0 ....for 1.5 Stability = 0.0 lbs OK Anet(Masonry) in2= 139.50 Rebar Depth 'din= 6.19 Masonry Data fm psi= Fs Psi= Solid Grouting = Vertical component of active lateral soil pressure IS Modular Ratio'n' NOT considered in the calculation of soil bearing Wall Weight psf= 100.0 Load Factors Short Term Factor = Building Code IBC 2009,ACI Equiv.Solid Thick. = Dead Load 1.200 Masonry Block Type = Medium Weight Live Load 1.600 Masonry Design Method = ASD Earth,H 1.600 Concrete Data Wind,W 1.000 fc psi= 2,500.0 Seismic,E 1.000 Fy psi= 60,000.0 • Use menu item Settings>Printing&Title Block Title Lot 10 Med Meadows Page: 3 to sit these five lines of information Job#: Dsgnr: OJH Date: 25 MAY 2017 for your program. Description..,. This Wall in File:cAusers‘dave1documents\retainpro 10 project files\rnshd_medallion lot 10_revised ' .... RatalaPro(c)1$87-2016, Build 11.16.11.12 Limas':KW-06056184CONSULTING ENGINEERS LCantilevered Retaining Wall Code: IBC 2009,ACI 318-08,ACI 530-08 ivens.To:HORN Concrete Stem Rebar Area Details Bottom Stem Vertical Reinforcing Horizontal Reinforcing As(based on applied moment): 0.5512 in2/ft (4/3)*As: 0.735 in2/ft Min Stem T&S Reinf Area 0,000 in2 200bdify:200(12)(6.1875)/60000: 0.2475 in2/ft Min Stem T&S Reinf Area per ft of stem Height:0.000 in2/ft 0.0018bh:0.0018(12)(8): 0.1728 in2/ft Horizontal Reinforcing Options: One layer of: Two layers of: Required Area: 0.5512 in2/ft #4@ 0.00 in #4@ 0.00 in Provided Area: 0.8267 in2/ft #5@ 0.00 in #5@ 0.00 in Maximum Area: 0.8382 in2/ft #6@ 0.00 in #6@ 0.00 in i Footing Dimensions &Strengths I Footing Design Results Toe Width = 2.00 ft Toe Heel Heel Width = 8.50 Factored Pressure = 2,292 1,197 psi Total Footing Width = 10.50 Mu':Upward = 4,444 45,083 ft-# Footing Thickness = 12.00 in Mu': Downward = 492 48,475 ft-# Mu: Design = 3,952 3,392 ft-# Key Width = 0.00 in Actual 1-Way Shear = 24,77 1.75 psi Key With -.. 0.00 in Allow 1-Way Shear = 75.00 75.00 psi Key Distance from Toe = 0.00 ft Toe Reinforcing = #5 @ 14.35 in f'c = 2,500 psi Fy = 60,000 psi Heel Reinforcing = #4 @ 9.00 in Footing Concrete Density = 150.00 pcf Key Reinforcing = #4 @ 14.00 in Min.As% = 0.0018 Other Acceptable Sizes& Spacings Cover @ Top 2.00 @ Btm 3.00 in Toe: #4@ 9.26 in,#5@ 14.35 in,#6@ 20.37 in,#7@ 27.78 in,#8@ 36.57 in,#9@ 46 Heel:#4@ 9.26 in,#5@ 14.35 in,#6@ 20.37 in,#7@ 27.78 in,#8@ 36.57 in,#9@ 46 Key: No key defined Min footing T&S reinf Area 0.00 in2 Min footing T&S reinf Area per foot 0.00 in2 ift If one layer of horizontal bars: If two layers of horizontal bars: #4@ 0.00 in #4© 0.00 in #5@ 0.00 in #5@ 0.00 in #6@ 0.00 in #6© 0.00 in Summa of Overturnin! & Resistin• Forces & Moments OVERTURNING .RESISTING Force Distance Moment Force Distance Moment Item lbs ft ft-# lbs ft ft-# Heel Active Pressure = 2,117.5 3.67 7,764.2 Soil Over Heel = 8,616.7 6.58 56,726.4 Surcharge over Heel = 175.0 5.50 962.5 Sloped Soil Over Heel = Surcharge Over Toe = Surcharge Over Heel = 391.7 6.58 2,578.5 Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load = Axial Dead Load on Stem= 750.0 2.33 1,750.0 Load @ Stem Above Soil= 'Axial Live Load on Stem = 750.0 2.33 1,750.0 Seismic Earth Load = 480.8 6.60 3.173.5 Soil Over Toe = 1.00 = Surcharge Over Toe = Total 2,773.3 O.T.M. 11,900.2 Stem Weight(s) = 1,000.0 2.33 2,333.3 Earth @ Stem Transitions= = = Footing Weight = 1,575.0 5.25 8,268.8 Resisting/Overturning Ratio = 6.02 Key Weight = Vertical Loads used for Soil Pressure= 13,083.3 lbs Vert. Component = Total= 12,333.3 lbs R.M. 71,656.9 If seismic is included,the OTM and sliding ratios *Axial live load NOT included in total displayed,or used for overturning be 1.1 per section 1807.2.3 of IBC 2009 or IBC 201 resistance,but is included for soil pressure calculation, Vertical component of active lateral soil pressure IS NOT considered in the calculation of Sliding Resistance. Vertical component of active lateral soil pressure IS NOT considered in the calculation of Overturning Resistance. • ..K.,.a � aNF 0/ I ''�.:�ti �).ti Om � e Rc MAW.MAD me..14 111111MBWIEI :0 WM..I 10. .e•MAX 0111 la A,F f 1 1111111/1" a .� lig NMI MUM lull IIn � I. ii�� �R,,;�,> ii�� �....,,. 01111 .011 sera Milan HIM Willi .e. EMI re 41 4ill r ......... 14.11141. • mil tIll �� pa� • MS 71 U J _rill .11.011.1 �1 >♦ ).� b a.ber jr wo.ber 1111 ��� MAIM. �M�t p LOAM M1twusi )t ..Y_. Iii MIL ASIPLL.MIAMI Fr kill .), rp �— 11 II 1Yb v I. iI 161 Q OCOMIEGTION a FOUNDATION �� O 1YP.HOLDO W )� slr, MIIIIIIIIMMIIIIIIIIII om ■� ad �4 0111,. nFes>a nFn� '•�-�N. w..w.v0 F�f� nii \�� P\ -ice nra —iV • . \e ommlimi O GARAGE WING FRAMING(LOW HEADER) GARAGE WING FRAMING(RAISED HEADER) r,-)TIP MD•SLAB CM 1,0' uCI SLAG .v.r.ro --- - Q ,w WK mrm : Win."�..« ttkk PMOMS w 0 Ef 9 7. 1,1,1,1, o a I s ee... 1— o ALISALL �°�1 '11 ...� _ .no.... DETAILS w.wu)vi.a io�m1Ownwaa AN NM. ..n..VT . 4 A f C 11.11.11 (.Nib I . ere r.1.11.6 FFFFl1�i��i tl.1QarWr.. • u 6. ��µ ' )a nen nnw..eon MN. CANTILEVERED RETNFFG WALL ECNEDYLE o.7.1.:: ��ILAIIIILOr �1/' a cu r.0 MAWS 011.11.1. — ia)u f#RIC f�fAKN61UALL FOR e1AM2 ICE VALUES Y REVISIGN9: F.,'"Ir ' 061001.. I`I II lik II � \, A r.1.,0 waw nr.wac .,w ,�.-ti-• 53911 1 Ilk la .4...O&M CONIA1.21 YIN MM ' 110111i II gip, jk '`� • Tled•� ..w...A10. OO.OW r..nwrt.Mrr)n.uaF)ar.AWE.•. DRAM:14.01:11.1/0 SCALE: I••I.gq. Illi �1►a1._ ..wa0. ,„.„ �,�� m w.... �n.h�WW1•'°' .� "�.aw.Mo..os�. e,.... �Dero •w-m a.COM I 1W1 a .. w. a.cm... A}WIXWR.)gw..H.00.1,0.51.w.MAMMA wF.re)n.aenoam LLIALPLILL OrAUMNII HO.11110.01.21.1.191.MOLL :nm' >. 01,1,1, w.+..FF.w... a.O..K.ow�..o. 0.110 O IBIEARWA�6 CRIPPLE WALLS A ICY .Era. 3 9 O PARALLEL JOISTS O PERP.JOISTS O CANTILEVERED RETAINING WALL - .M A euanw .mwruo IIIIIIIIIIIIIIIIIIIIMI l 0 FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT i Mg Tran mi s ttal _.Letter 1 .,,,, „ 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: ( 8--p,.____ DATE 4 '' 'a 'kr E DEPT: BUILDING DIVISION MAY 25 2017 FROM: � / JC�6' COMPANY: d /, /rpt7/ ,/vf , BUILDINGDIVISION HONE: __2"-PJ y 4 ‘'" 6-a)._____ IC:Lk CITY OF TIGARD RE: /14 a w I! - C- - aa/6 - 00366— (Site Ad ress (Permit Number) V 1l-eQ6JiC - - . -16 (Project name or subdivision name and lot number, ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s)of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: _a_06071,---,Z 40 FOR OFFICE USE ONLY Route Permit Technician: Date: -3� - ) j Initials: ---}f Fees Due: ID No Fee Description: Amount Due: •S H 1l�.,, r._.r = $ 9 $ $ $ Special Instructions: Reprint Permit(per PE): 0 Yes rin No ,Done Applicant Notified: Zj,€4.- Date: s-/•3,) f,7 Initials: /. I:\Building\Forms\TransmittalLetter-Revisions 061316.doc