Plans -1 E
a 201 i
>14
• CITY I� TIGA
0 pa tit
'c'''
A w
28,?., '•J
a, u . . N 131ILDING DIVISION
RD D
c� A
i c.a
u
4404 ..4acW
4
_ 2
_
5 1 3
S
Drive Way
SW Pem&rook St.
Site Plan Legend
1.Solar Array—Located on South facing roof
2. Inverters—Individual Inverters are mounted to the back of each panel
3. MDP—Located on Eastern interior wall of garage
4. Utility Meter-Located on Eastern exterior side of the house Sitetayout
Grid-Tied PV Installation
5. Location of TSRF Measurement
Revision#1 Name: Daniel Thom Earthlight Technologies
Date:4/25/12017 Address:9755 SW Pembrook St 1037 Commerce Q.
Drawing Done By:Earthlight Tigard,OR 97224
Silverton OR 97381
This Drawing is the copyrighted property of Earthlight and has been prepared spedficallyfor the stated owner,project,and site.This project specific design is ''�"+Y,'%
the Intellectual property of Earthlight and shall not be used in any form by individuals or companies other than Earthlight for negotiations pertaining to this ..24.44, x.4144'.* c�^-1y (.
project nor for any other purpose,location,project or owner without the express written consent of Earthlight. _„4,41.a e•...�rt h I i 1 !t
..r. e• ::ry-,..car �,r•..»t=+? n+t,.:tin..
TOTAL PV Array Load Outo{Q UtilityService Grid
6.04 kW oc Solar Module Information(NEC 690.51) Inverter information
4.48 kW AC Module:Sunpower X22-360-CAC SunPower X22-360-C-AC 240V single Phage
Operating Current:18.62Aac Rated Output Pm
Operating Voltage:240Vac P ( Pp) 360STC Nominal AC Voltage:240V
Maximum Power Voltage(Vmpp): 240V Nominal Output Current:1.33 A
*System Under 7.2 kW Does not need AC Maximum Power Current(lmpp): 1.33A Maximum Units per 20A Branch Circuit: 12
Disconnect
PGE Meter
#25024347
IA1
Locus Energy
/ Solar kWh
A Mocks Meter t
- - all 0, 10 i ( :
�
\ /\ / 15A r ~ i
Array 1 \/ V V -• , 20A —4 a c "A —&
7 Nodules 10 10 10 --
—• • 20A W� 1 r(12.)- - - SunPower c C"
Montorng Main Distribution Pang
200A Man Breaker
SunPower AC Solar Combiner Panel 30A Solar Back-Fed Breaker
Micro-Inverter 6 Space Load Center Dedicated only for PV
X22-360-C-AC
20A Breaker perPV Branch Crcut
NOTES:
1.Photovoltaic system round shall be installedper the a One-Line Electrical Diagram
Y 9quremerds of sections 690.41 through 690.47 of the national electric code,ANS 70 and
is the responsibility of the installer(includes AC crowding,PV grounding,and DC grounding electrode conductor). Grid Tied PV Installation
2.The system shal comply with the anti-islanding protective IEEE function numbers applying to the invader system RevisionName:Daniel Thom Earthlight Technologies
el
3.The photovoltaic system shall comply wit,the"photovoltaic power systems and the 2011 NEC:suggested standards and practices". Date:4/3/2017 Address:9755 SW Pembrook St 1037 Commerce Cf
4.Alf conductors AC/DC are sh gildedwithin PVC Gond rt if outdoors and EMT if indoors. Drawing Done By:EartNight Tigard,OR 97224 Silverton OR 97381
This Drawing is the copyrighted property of Ea rthlight and has been prepared spedficafy for the stated owner,project,and site. This project specific design is "#,.g,.
the intellectual property of Earthlight and shall not be used in any form by individuals or companies otter than Earthlight for negotiations pertaining to this g, "far* �y {-(-m,I
t
project nor for any other purpose,location,project,or owner without the express written consent ofEarthlight.
+�ai e*.1 1 I 1
fy'e_,IT.TI V 31l>>.a, O.11,/:11.,114
Structural Plan
35'
/ / Pre-Engineered Truss:
2" X 4" Light Framed Lumber
m 24" O.C.
ARRAY PITCH: 16°
ARRAY AZIMUTH: 182°
SunPower
Invisimount Rail
tis
\ PV Solar Array
m
.:r SPR-X22-
360-C-AC
-16° Allkh .
/ 22' /
rii 7' 4' 11'
3'5.2"
/ /
SunPower 360 Attachment Notes
AC Module L-Foot attached
clamped to rail to SunPower 1. Engineered Truss 2"X4" spaced at 24" O.C.
Invisimount rail 2. The PV solar installation shall not obstruct any
Roof Decking �j �
---i s"Between Roof SunModo Flashing plumbing, mechanical, r building roof vents.
3" Lag Bolt3.Flashing shall be applied in accordance with
Deck and Module Engineered Truss manufacturers printed instructions
3" lag bolt penetrates roof through 4.If there is conflict between what is depicted here
decking and into engineered truss and instructions provided by the manufacturer,
in order to attach mounting manufacturers' instructions shall supercede.
hardware to the roof service. The 5. The roof has a single roof covering without a
lag and mounting hardware are reroof overlay.
sealed with Geocel.
This Drawing is the copyrighted property of Earthlight and has been prepared
Revision#1
specificallyfor the stated owner,project,and site. Thisproject specific design is Site Layout
P g Date:4/251/2017 ♦,‘
the intellectual roe Earthlightany y Grid-Tied PV Installation Drawing
property rty of and shall not be used in form b Done By Earthlight
s °� earthli ht
individuals or companies other than Earthlight for negotiations pertaining to Name: Daniel Thom Earthlight Technologies ``
this project nor for any other purpose,location,project,or owner without the Address:9755 SW Pembrook St, 1037 Commerce Ct. air*rr
express written consent of Earthlight. Tigard,OR 97224 Silverton OR 97381 44'�``f�", INNOVATIVE SOLAR SOLUTIONS