Loading...
Report (31) 7409 SW Tech Center Dr,Ste. /45 Tigard,OR 97223 4111=0,f ri Ph:503-443-3799 Fax:503-620-2748 soa*4�ar� ~' ' Special Inspection Final Report Date: May 13.2O17 Job# 16'6497 Permit#BUP20l5'003GG Mail To: Project: KELLER HOLLAND TIGARD INVESTORS,LLC Tigard Apartments 1111 Main Street, Suite 700 13351 SW Hawks Beard Street Vancouver,WA 98660 Tigard,OR 97223 Building 6 To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or BC. Special inspection(s)were performed For the following: Reinforced Concrete Anohors-Costin Place Anchors-Expansion Wood Nailing Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my know|edge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. (71/k \Appnovedby: Bob Brown/President Revised 5/17/17 BB/sa �iv, ^ '~=_'- Proud&obuN�Uon,d\:, vicc