Report (13)�I Engineering. Inc. Real -World Geotechnical Solutions Investigation - Design - Construction Support rv,S-To�a)[(_0 1 .2. 1�U S— S I-V f_?] 14835 SW 72nd Avenue Tel (503) 598-8445 Portland, Oregon 97224 Fax (503) 941-9281 DAILY FIELD REPORT PROJECT DATE Walnut Ridge May 10, 2017 PROJECT NUMBER WEATHER 14-3586 Clear, 70s CLIENT CONTRACTOR Riverside Homes LLC -- PERMIT NUMBER PAGE # -- 1 of 1 on Notes: (Inclutle location, testing aata OF OBSERVATION: ana metnoas or construction, comormance statement, etc. Foundation Subgrade Review — Lots 1 and 2 GeoPacific engineering technician Eric Merritt was onsite to observe the foundation subgrade for Lots 1 and 2 at the Walnut Ridge site. It is our understanding that the planned structures will consist of single-family residences utilizing conventional spread footings. At the time of our site visit, the foundation excavation for Lots 1 and 2 was complete and extended 1.5 to 4 feet below the surrounding grade. The foundation bearing soils consisted of native silt soils, which were evaluated with a'h-inch soil probe. Probing efforts indicated stiff soil consistency throughout the footing subgrade soils at each lot. The layout of Lots 1 and 2 slope to the east, and the footing layout includes several short steps. Footing -to -slope setbacks were evaluated and determined to be adequate. Footing -to -wall setbacks were not an issue. Based on observed conditions, foundation subgrade soils as prepared are considered suitable to support the anticipated allowable bearing pressures. DISTRIBUTION LIST: nmunson@riversidehome.com bgroves@riversidehome.com OBSERVED BY: Eric Merritt GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction, job site safety, or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer.