Loading...
Report (14) File No.: 0 8 Project: Rose City Futsal Date: 1 2 Project: Warehouse . Conversion 2 8 Project No . : 572 2 0 1 6 6-00/ 8¢I Final Acceptance In accordance with provisions of the contract documents, the construction work for Rose City Futsal warehouse conversion at 10831 SW Cascade Avenue, Tigard, Oregon, performed by JHKeIIy, LLC is ACCEPTED. The work is found to be in general conformance with the design documents and no exception is taken. Eric Lanciault Design Professional in Charge Eric Lanciault, Architect 3200 se 164th avenue suite 302 vancouver,washington 98683 360.798.3801 D:\Dropbox(elaooa)\elaooa\572-futsal tigard\09-contract administration\10-closeout\161228_final acceptance_572.docx