Loading...
Report (17) Date: January 4, 2017 Job#: T1505280.B Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Ker th.,. - --. . C.. --) R auvin "�- Project Manager KG/jng cc: Premium Property Tigard LLC C/O Capstone—Jeff Sackett JSACKETT@CAPSTONE-PARTNERs.coM City of Tigard Building Division—Walter"Chip" Barnett EMAILED/MAILED Catena Consulting Engineers—Gretchen Hall GRETCHEN@CATENAENGINEERS.COM Catena Consulting Engineers—Candace Sy CANDACE@CATENAENGINEERS.COM Sera Architects—Josh Cabot JOSHC@SERAPDX.COM JBA/Acco LLC—Bo Bolliger BO@JBAPROJECTS.COM JBA/Acco LLC—Brian Lasswell BLASSWELL@JBAPROJECTS.COM JBA/Acco LLC—Lee Prose LEE@JBAPROJECTS.COM Urban Resources Inc—Larry Atchison LARRY@URBANRESOURCESINC.COM Urban Resources Inc—Alexandra Orozco ALEX@URBANRESOURCESINC.COM Urban Resources Inc— Randy Boehm RANDY@URBANRESOURCESINC.COM Premium Property Tigard LLC C/O Capstone— Lauren Jones LJONES@CAPSTONE-PARTNERS.COM Carlson Testing, Inc. Incompleted Items List (NCL) Jan 04,2017 T1505280.B Project Name: BURNHAM & ASH APARTMENTS - BUILDING 2 Project Address: SW BURNHAM ST & SW ASH AVE TIGARD OR Permit No: BUP2 015-0 018 5 P.O.No: Project Manager: KEITH R. GAUVIN Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 KEJ 01/12/2016 NOT ABLE TO VERIFY STRUCTURAL EMBEDMENTS WITH EMBEDS INSPECTED AND KEITH R. GAUVIN 01/28/2016 REGARD TO INSPECTIONS. CONFORM TO RFI #50 AND DETAIL 2/S602. 01/15/16: REMAINS OUTSTANDING. 2 JP 08/04/2016 NOTED HOLDOWNS REQUEST FOR INSPECTION 11/C-B AND ENGINEER/COMMONS J. PILAND 08/04/2016 ALSO 10.5-11/E WERE NOT WELDED ALL AROUND AT THE MANUFACTURING PROVIDED HOLDOWN ROD (ONLY WELDED AT PLATE) TYPICAL. EOR CLARIFIED DETAIL DATED IS CURRENTLY CHECKING CALCS TO REVIEW ALL AROUND 08/04/16. WELD SYMBOL DRAWING AT 11 SHEET 3, DETAIL AT 12 (12/15/15) . 3 SJH 09/27/2016 AT LEVEL 2 GRID C/1-2, (2) 5/16" FILLETS FOR (1) WELDS MEET THE SIZE AND S. HOLTHOUSE 09/30/2016 PL 4 X 12 X % CANOPY EXTENSION HAVE EXCESSIVE VISUAL ACCEPTANCE POROSITY AND POROSITY PIPING 12" IN LENGTH, WHICH CRITERIA PER AWS D1.1 REQUIRES REMOVAL AND REPAIR. AND VERIFIED AS BUILT PER EMAIL FROM ENGINEER-OF-RECORD (EOR) GRETCHEN HALL (09/14/16) CC:PREMIUM PROPERTY TIGARD LLC C/O CAPSTONE - JEFF SACKETT CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT CATENA CONSULTING ENGINEERS - GRETCHEN HALL SERA ARCHITECTS - JOSH CABOT JBA/ACCO LLC - BO BOLLIGER URBAN RESOURCES INC - LARRY ATCHISON Page: 1