Loading...
Report (37) May 8,2017 8330 SW Colony Creek Court Observation Page 2of3 The full height 2x4 member the contractor has already added should be a sufficient fix for the cut member. We recommend the new 2x4 member have a 3/8"plywood gusset(which the contractor has already installed) at both ends and verify that a minimum of(4) 8d nails at both ends and to the top and bottom chords of the existing gable end truss have been installed. The exterior sheathing should also be nailed to the new 2x4 vertical members with 8d at 6" oc. Feel free to contact us to discuss As always, we appreciate this opportunity to be of service to you on this matter. Please do not hesitate to contact us accordingly should you have any comments or questions. Sincerely, Kevin Harker PE, DEQ PROPe Project Engineer ���GINFF��p 915 09aaN signed by Kevin KTH/Icth --�— Attachments:Figures 1 &2. Kevin Harker OREGOaa)N 15:11:57-07TO C: file 'f . 13.'�tQ iNT. Hfk Expires: . - 20