Report (37) May 8,2017
8330 SW Colony Creek Court Observation
Page 2of3
The full height 2x4 member the contractor has already added should be a sufficient fix for the cut
member. We recommend the new 2x4 member have a 3/8"plywood gusset(which the contractor
has already installed) at both ends and verify that a minimum of(4) 8d nails at both ends and to
the top and bottom chords of the existing gable end truss have been installed. The exterior
sheathing should also be nailed to the new 2x4 vertical members with 8d at 6" oc. Feel free to
contact us to discuss
As always, we appreciate this opportunity to be of service to you on this matter. Please do not
hesitate to contact us accordingly should you have any comments or questions.