Loading...
Report (40) l Ulv�t S!.✓ ��s4, -C,2- . Mechanical ck Software Version 4.4.4.1 Mechanical Compliance F- t 11)1 Section 1: Project Information (--.4-' - Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title:Visionworks 259 Washington Sqaure Too Project Type: New Construction Construction Site: SW Square Rd. Owner/Agent: Designer/Contractor 1104Portland,OR Washingtonn3 VisionWorks Joe Can-eon 175 East Houston Street Kinetics Consulting,LLc San Antonio,TX 78205 401 Austin Highway,Suite 216 San Antonio,TX 78209 Section 2: General Information Building Location(for weather data): Portland,Oregon Climate Zone- 4c Section 3: Mechanical Systems List CQuenttit�r $1Lstertl.Type&Description 1 HVAC System 1 (Single Zone): Heating: 1 each-Other,Electric.Capacity=27 kBtu/h No minimum efficiency requirement applies Cooling: 1 each-Split System,Capacity=90 kBtuih,Air-Cooled Condenser,Air Economizer Proposed Efficiency=13.00 EER,Required Efficiency=11.20 EER Fan System: None 3 HVAC System 2(Single Zone):Other Heat Pump Heating Mode:Capacity=18 kBtu/h, No minimum efficiency requirement applies Cooling Mode:Capacity= 15 kBtu/h, No minimum efficiency requirement applies Fan System: None 1 HVAC System 6(Single Zone):Packaged Terminal Heat Pump Heating Mode:Capacity=22 kBtu/h, Proposed Efficiency=3.90 COP,Required Efficiency=2.81 COP Cooling Mode:Capacity=20 kBtu/h, Proposed Efficiency=13.00 EER.Required Efficiency=9.11 EER Fan System: None 1 Water Heater 1: Electric Storage Water Heater,Capacity: 10 gallons No minimum efficiency requirement applies Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Requirements Specific To: HVAC System 1 : ✓ 1 Equipment meets minimum efficiency: Split System: 11.20 EER(11 4 IEER) ✓ 2 Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5.000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Plans reference page/section: Project Title:Visionworks 259 Washington Sqaure Too Data filename:11Kei\kinetics storagelSHAREDITEMPIIECCIECCA-259 Portland OR.cck Report date:01/25/17f Page 4 of 8 • • f 3. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: • 4. Hydronic system controls.Hydronic systems of at least 300,000 Btu/h design output capacity supplying heated and chilled water to comfort conditioning systems include controls that meet the requirements of Section 503.4.3. Plans reference page/section: Requirements Specific To: HVAC System 2 : 1. Energy recovery ventilation systems, Individual fan systems that have both a design supply air capacity of 5.000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. v/ Exception applies:Where energy recovery systems are prohibited by the International Mechanical Code Plans reference page/section: • 2. Hydronic system controls. Hydronic systems of at least 300,000 Btu/h design output capacity supplying heated and chilled water to comfort conditioning systems include controls that meet the requirements of Section 503.4.3. Plans reference page/section: Requirements Specific To: HVAC System 6 : • 1. Equipment meets minimum efficiency: Heat Pump: 2.81 COP 9.11 EER Requirements Specific To: Water Heater 1 : • 1. Newly purchased equipment meets the efficiency requirements. No efficiency requirements for water heater with storage capacity less than 20 gallons. • 2. Service water-heating equipment performance efficiency.Water heating equipment efficiency has been verified through data furnished by the manufacturer or through certification under an approved certification program. • 3. Temperature controls.Service water-heating equipment have controls to allow a setpoint of 110°F for equipment serving dwelling units and 90°F for equipment serving other occupancies.The outlet temperature of lavatories in public facility rest rooms is limited to 110°F. Plans reference page/section: • 4. Heat traps.Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps on the supply and discharge piping associated with the equipment. Plans reference page/section: • 5. Pipe Insulation.For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems,piping is insulated in accordance with the specifications of this section. • 6. Hot Water System Controls.Systems designed to maintain usage temperatures in hot water pipes is turned off automatically when the hot water system is not in operation and has demand sensing controls that turn off the system when there is no demand when the system is operational.A check valve or similar device is installed per requirement details. Exception applies:Where coupled with water heating capacity less than 100 kBtu/h. Plans reference page/section: Generic Requirements: Must be met by all systems to which the requirement is applicable: • 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. ti 2. Packaged Electric Equipment.Specified packaged electrical equipment has a heat pump as the primary heating source. Requirement is not applicable. Plans reference page/section: ti 3. Cooling equipment economizers:The total capacity of all cooling equipment without economizers must be less than 240 kBtu/h.This project lists 65 kBtu/h capacity without economizers.That portion of the equipment serving dwelling units and guest rooms is not included in determining the total capacity of units without economizers. Plans reference page/section: ti 4. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance with Section 503.2.1. Plans reference page/section: Project Title:Visionworks 259 Washington Sqaure Too Report date: 01/25/17 Data filename:11Kei\kinetics storage\SHARED\TEMPUECC\ECCA-259 Portland OR.cck Page 5 of 8 ✓ 5. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. ✓ 6. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that respond to temperature within the zone. Plans reference page/section: ✓ 7. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. Plans reference page/section: 8. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range • or deadband of at least 5'F(2.8`C)within which the supply of heating and cooling energy to the zone is capable of being shut off or reduced to a minimum. Plans reference page/section: • 9. Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set point at time of occupancy. Plans reference page/section • 10.0ff-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. Plans reference page/section: 11.Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Plans reference page/section: • 12.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air temperatures meet code criteria. Plans reference page/section: • 13.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by separate air distribution systems from those serving zones requiring only comfort conditions,,or shall include supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only. Plans reference page/section: ✓ 14.Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or zones,a humidity control device is provided. Plans reference page/section; ✓ 15.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel or electricity to reduce relative humidity below 60 percent. Plans reference page/section: ✓ 16.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no active humidification or dehumidification takes place. Plans reference page/section: • 17.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code. Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by Chapter 4 of the International Mechanical Code. Plans reference page/section: • 18.Demand controlled ventilation(DCV).DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 for multiple zone systems. Plans reference page/section: ✓ 19.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. Exception applies: Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems. Plans reference page/section: 20.Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handling automobiles employs automatic carbon monoxide sensing devices. Project Title:Visionworks 259 Washington Sqaure Too Report date: 01/25/17 Data filename\\Kei\kinetics storage\SHARED\TEMP\IECC\SCCA-259 Portland OR.cck Page 6 of 8 Plans reference page/section: • 21.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt spaces by a minimum of R-8 insulation,All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 of the International Mechanical Code. • 22.Low-pressure duct systems,All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with the manufacturer's installation instructions. Plans reference page/section: f 23.Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Plans reference page/section: 24.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Plans reference page/section: ✓ 25.Piping Insulation.All pipes serving space-conditioning systems(hot water piping for heat systems,chilled water,refrigerant,and brine piping systems.and steam piping)are insulated as specified by this section. • 26.Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable volume fans with motors 10 horsepower. Plans reference page/section: • 27.Hydronic system balancing.Individual hydropic heating and cooling coils are equipped with means for balancing and pressure test connections. Plans reference page/section: • 28.Manuals,The construction documents require that an operating and maintenance manual be provided to the building owner by the mechanical contractor.See long description for specifications. Plans reference page/section: • 29Air System Design and Control,Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions of Sections 503.2.10.1 through 503.2.10.2. Plans reference page/section: • 30Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. Plans reference page/section: • 31.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake horsepower(bhp). Plans reference page/section: ✓ 32.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical Code,whichever is greater. Plans reference page/section: 33All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. Plans reference page/section: • 34.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating conditions. Plans reference page/section: • 35.Heating outside a building.Systems installed to provide heat outside a building are radiant systems.Such heating systems are controlled by an occupancy sensing device or a timer switch,so that the system is automatically deenergized when no occupants are present. Plans reference page/section: Project Title:Visionworks 259 Washington Sqaure Too Report date:01/25/17 Data filename. \tKei\kinetics storage\SHARED\TEMP\IECC\ECCA-259 Portland OR.cck Page 7 of 8 • 36.Hot Gas Bypass Limitation.For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity is no more than 50%total cooling capacity. Plans reference page/section: ✓ 37.All service water heating requirements are listed in requirements section specific to the system. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0 4,1 and to comply with the mandatory requirements in the Requirements Chec t. f 7 -. Signature X61 4-.,,---- - /-,4 -- 7 Name-Title g Date Section 6: Post Construction Compliance Statement D HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. ❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor O Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date itti,,ti Via, t r. -;' ,,`1/4,3700' - ''', ' If, \ ` 92 PE 1 k ti, 1 \k: r P ___.1 17 Project Title:Visionworks 259 Washington Sqaure Too Report date: 01/25/17 Data filename:\\Kei\kinetics storage\SHARED\TEMP\IECC\ECCA-259 Portland OR,cck Page 8 of 8 ,ai iie COMcheck Software Version 4.0.4.1 Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title:Visionworks 259 Washington Sqaure Too ‘a Project Type: New Construction ,4 ' tel' Construction Site. Owner/Agent: 10104 SW Washington Square Rd. Designer/Contractor: Portland,OR 97223 Visionworks Joe Carreon 175 East Houston Street Kinetics Consulting,LLc San Antonio,TX 78205 401 Austin Highway,Suite 216 San Antonio,TX 78209 Section 2: Interior Lighting and Power Calculation A B C D Floor Area Allowed Allowed Watts Retail Watts/ft2 2911 1.32 3843 Total Allowed Watts= 3843 Section 3: Interior Lighting Fixture Schedule A B C Fixture ID:Description/Lamp f Wattage Per Lamp f Ballast t E Lamps/ #of Fixture (C X 0) Retail(2911 sq.ft.) Fixture Fixtures Watt. Linear Fluorescent 1:Al:48"18 32W:Electronic: Linear Fluorescent 2:Al E:48"18 32W:Electronic: 3 16 96 1728 Linear Fluorescent 3:A2:24"T8 17W:Electronic' 2 6 64 3$4 Linear Fluorescent 4:A3:48"T8 32W:Electronic: 3 4 51 204 Linear Fluorescent 5:A3E:48"T8 32W:Electronic: 3 5 96 480 Linear Fluorescent 6:A6:24"T8 17W:Electronic: 2 5 64 320 Halogen 1:B1:Other: 2 1 34 34 LED 1:B3:LED PAR 11W: 1 6 50 300 Linear Fluorescent 7:A2E:24"T8 17W:Electronic: 1 5 11 55 Linear Fluorescent 8:A4:24"18 17W:Electronic: 2 1 34 34 2 1 34 34 Total Proposed Watts= 3573 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:3843 Proposed Wattage:3573 Complies:YES Mandatory Requirements: 2. Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: ✓ 3. Daylight zone control,All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic Project Title:Visionworks 259 Washington Sqaure Too Data filename UKeitkinetics storage4SHAREDITEMPUECCtECCA-259 Portland OR.cck Report date: 01/25/17 Page 1 of 8 daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent.and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. V Exception applies:Spaces required to have occupancy sensors. Plans reference page/section: f 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section. • 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied Plans reference page/section: • 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: • 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires.alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Exception applies:An occupant-sensing device controls the area Plans reference page/section: ✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: • 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: ✓ 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section. • 12 Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: • 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that:1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: f 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: ✓ 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Project Title'Visionworks 259 Washington Sqaure Too Report date: 01/25/17 Data filename:\\Kei\kinetics storage\SHARED\TEMP\IECC\ECCA-259 Portland OR.cck Page 2 of 8 Plans reference page/section: • 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1 Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: • 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: • 18.Each dwelling unit in a building is metered separately. Plans reference page/section: :« Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.4.1 and to coml with the mandatory requirements in the Requirements Checklist_ Name-Title Sign ure Date Project Title:Visionworks 259 Washington Sqaure Too Report date. 01/25/17 Data filename:\\Kei\kinetics storage\SHARED\TEMP\IECC\ECCA-259 Portland OR,cck Page 3 of 8