Report (9) Imo.
MG2 Corporation
1101 Second Ave,Ste 100 206 962 6500
Seattle,WA 98101 MG2.com
April 14, 2017
RECEIVED
Re: Victoria's Secret — Washington Square
9585 SW Washington Square Road APR 19 2017
Space B-10 CITY OF TIGARD
Portland, OR 97223 BUILDING DIVISION
Project Number: 16-5291-01
Store Number: 00101905
Subject: Revision 1
The following instructions are issued to the Contractor. The Contractor shall promptly inform subcontractors and others performing or
supplying the Work of relevant contents of this Bulletin. If any changes to the Contract Sum or Time are required,Contractor shall submit
quotation showing change in Contract Sum or Time within time frame as dictated by the L Brands project manager.If no such quotation is
submitted within the time specified,no change to the Contract Sum or Time will be allowed. This Bulletin is not a substitute for a Change
Order,which is required to be executed in accordance with the conditions of the Contract for any change to the Contract.
Architectural
Sheet Description Summary
A00.00 Cover Sheet • Included contact information for Operations Planner and Seko Coordinator
• Revised square footage summary in detail A per plan changes
• Revised occupancy load breakdown and actual travel distance in detail D per
plan changes
• Added Bulletin 3 implementation in detail K
A00.01 Responsibility Schedule • Included updates for illuminated storefront
A00.02 Door Schedule • Revised number of door type 11
• Revised responsibility for u-change lock cylinder in hardware group L-1
A00.03 Schedules • Added WC-118
A00.10 Life Safety/Accessibility • Revised egress path,egress and accessibility signage,emergency lighting,and
Plan exit lighting per plan changes
• Revised life safety and egress calculations per plan changes
A02.01 Construction Floor Plan • Added angle dimension in VSL 1 &2 corners
A02.02 • Updated detail callouts at Trans#2
• Revised dims at north end of VSL 2
• Revised dimensions and callouts per plan changes
A03.01 Reflected Ceiling Plan • Updated ceiling color at VSL 1 cabinets
A03.02 • Revised height of Trans#3
• Revised ceiling and callouts per plan changes
• Added keynote 12 in detail D and at Trans#2 and#4
A04.01 Reflected Lighting Plan • Added W9 sconces in VSL 1
A04.02 • Extended lighting tracks at drum shade in VSL 1
• Revised light types in Trans#2 and Vest B#1
• Revised lighting, dimensions, and callouts per plan changes
A05.01 Floor and Wall Finish • Updated keynote 7 and added keynote 47
A05.02 Plan • Revised cabinet finish for VSL 1
• Revised finishes for Trans #2, Trans #6, Electrical, FR Alcove, Entry Vest A,
Break Room, and Hallway
• Revised flooring and finish callouts per plan changes
A06.01 Presentation and Fixture • Updated fixtures in VSL 1 and 2 per plan
A06.02 Plan • Updated Non-Sales/Associate Amenity Area Breakdown
• Revised fixtures, egress path, and room square footages per plan changes
• Add keynote 45 to plan in Bra Salon at focal
A07.01 Interior Elevations • Added sconces in elevation Al
• Revised height of Trans#3 in elevation Cl
• Updated bulkhead condition in detail S
A07.02 Interior Elevations • Updated elevations Al,A3, C, Ll, L3, and N based on plan changes
A07.04 Interior Elevations • Updated elevations B, D, and M2b based on plan changes
A08.00 Overall Storefront • Revised neutral pier condition
Elevation
A08.01 Storefront Elevation • Revised neutral pier condition
• Added keynote 72 at entry portal
A08.05 VS Storefront Details • Revised size of illuminated signage at sliding access door in detail A
• Flipped location of power supply and clock outlet in details A and N
A08.10 VS Storefront Details • Updated size of LED panel and notes for power supply and outlet in detail A
• Revised location of built-up column and added prefinished metal from storefront
mullion to lease line in detail P
A08.15 VS Storefront Details • Updated details N4 and N5
A11.02 VSS Construction Details • Added details J, K, M, and P per plan changes
A11.04 VSS Construction Details • Added detail H
A11.06 VSS Construction Details • Revised blocking and height of clock outlet in detail P
• Updated detail J
A11.07 VSS Construction Details • Updated detail J
A14.01 Shelving Details • Removed unused shelving types in details A and E
Electrical, Mechanical, Plumbing
Sheet Description Summary
E02.02 Electrical Power&Fire • Relocated Hand Steamer receptacle and circuit B-21 to coordinate with the
store design change
Alarm Plan • Re-circuited the fitting room receptacles to coordinate with the store design
change.
• Re-circuited the beauty room cabinet receptacles to coordinate with the store
design change.
• Re-circuited the Video Wall to coordinate with the design change.
• Re-circuited the Beauty Room floor boxes to coordinate with the design
change.
• Re-circuited the cash-wrap and closet to coordinate with the store design
change.
Meiennek
A .
• Re-circuited the DM Office to coordinate with the store design change.
• Re-circuited the break room to coordinate with the store design change.
• Re-circuited the Processing area to coordinate with the store design changes.
Added Circuit B-10 for the Processing hand Steamer.
• Re-circuited the 3 person manager's office to coordinate with the store design
change.
• Re-circuited water heater and re-circulating pump to coordinate with the new
store design.
• Re-circuited Fitting Room Grafik Eye Dimmer Control to coordinate with its
new location.
• Deleted circuits C-9 and C-11 to coordinate with the deleted Multi-purpose
room.
• Added C=circuit C-9 for the process Area computer.
• Added circuit B-10 for the Process Area hand steamer.
E02.52 Electrical Low Voltage • Re-circuited the BOH, Beauty Room, and Room 6 low voltage items to
coordinate with the new store design.
Plan
E03.02 Electrical Lighting Plan • Re-circuited the lighting in the BOH, Beauty Room, and Room 6 to coordinate
with the new store design.Added circuit A-40 in the fitting room due to the new
dimming design.
E04.02 Electrical Details • Revised Detail"K"to coordinate with the new video wall.
E05.01 Electrical Panels and • Revised panel schedules to coordinate with the store design changes.
Riser Diagram
M01.01 Mechanical Notes and • Removed VAV box 3 from schedule, coordinating elimination of Multi Use Rm.
• Revised FPVAV CFM,coordinating new video wall size, in Beauty Room.
Schedules
M02.01 Mechanical Plan • Revised back of house and beauty room HVAC design,coordinating with new
architectural layout.
M02.02
M04.01 Mechanical • Removed VAV box 3 from schedule,coordinating elimination of Multi Use Rm.
Responsibility Schedules
P01.01 Plumbing Notes, • Revised Men's/Women's water closet fixture type per POR designer
comments and matching Arch base plan.
Schedules and • Revised Details L and J,coordinating with new pluming design.
Isometrics • Revised Plumbing responsibility schedule, coordinating with new design.
P02.01 Plumbing and Fire • Revised back of house and beauty room plumbing and sprinkler design,
coordinating with new architectural layout.
P02.02 Sprinkler Head Plan
Structural
Sheet Description Summary
S01.01 Structural • Modified Location Plan A by revising the location for the water heater support.
Specifications and
Notes
S03.01 Structural Construction • Added Water Heater Support on Shelf Seismic Design Categories D, E, F detail
Details N.
S05.01 Mech Support Framing • Modified Partial Floor Framing Plan A by relocating the two left-most small
Plan and Details hanging mechanical units.
End of Revision 1
PERMIT RESOURCES, INC
TRANSMITTAL12017
To: City of Tigard Bldg. Dept. Date: Monday,April 17, 2017
13125 SW Hall Blvd. RECE#
Tigard,OR 97223Project: Victoria's Secret
APR 19 2.C1117 Washington Square
ATTN: Debbie Adamski—Permit Tech CITY OF'CIUNBD 9591 SW Washington Square Rd.,#B10
BUILDING Di
VISION Tigard, OR 97223
P/C#: BtJP2017-00007
No. of Copies Description of Item
3 Sets of Revised plans
1 Revision bulletin
X For Review&Approval For Approval: Please Return For Your Use
Other For Field Use
Comments/Special Instructions:
Hi Debbie,
As discussed, all of the above enclosed for the Victoria's Secret store at Washington Square. This permit have been
issuance .These are Design changes.
Please let us know when the review has been completed.
Thanks,
Mary B. Ryan
Encl.