Loading...
Plans (3) • m 5r021),6- 00 v5-7 /5{,z- ci,„; 5cfige---- 1- "POLYGON AT BULL MOUNTAIN" "*N\ LOT 30 • HUB AND TACK CERTIFICATION SE 1/4 SEC. 8, T 2 S, R 1 W, W.M. • CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED JANUARY 3, 2017 i / ei\'''. -,, / PREPARED FOR: / / POLYGON NORTHWEST COMPANY C / 109 E. 13TH ST. C> N./ VANCOUVER, WA. 98660 <<" / .,,p // V \- / / / LOT et: A / i 43., 31 / le C% Z / .D. 0 / S /, ( ^ i 1.r 91, IP / 0 6 z / / / / tsd / / / / < / N. / .N. LOT v‘ 7 \6, 30 -, <1 4,4* i ..... v / IV ta) N't5t, / cb, 4 4r LOT %kt, i -,•',9, 6, 29• ..7 0 0 1 r 0 Sr ... ..... REGISTERED o N\ • t9. PROFESSIONAL 414, .... LAND SURVEYOR ..4t. 8 _ ii5"'ci) .1 .. .-?" TRACT os. ti3 4,' ,...) G, Ix A --• 0._ < OREGON ,-• JULY 9,2002 -- ').. TRAVIS C.JANSEN 57751 5 RENEWS:6/30/2017 a c I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE 20 0 10 20 I ISUHRAVE'MARC CI Nu R TAHTEE L Sy T SA tiT ER OFy EODR EAGNODN,s IREEDB YT HCEE RTI FYTHAT A T 5 TO THE FOUNDATION ENVELOPE FOR LOT 30 OF THE PLAT 1 INCH =20 FEET 8, OF "POLYGON AT BULL MOUNTAIN". J) =2-. DRAWN BY: 12 DATE' 1/4/17 '''%' *PT PACIFIC COMMUNITY DESIGN 9- REVIEWED BY: ICJ DATE: 1/4/17 Z PLANNING - ENGINEERING -SURVEYING k PROJECT NO.: 395-031 \-.... (503) 941-9484 .1 / G G EO ESIG 2 FIELD REPORT .P 9.!_.,Rf._1.. GDI Project Polygon-122-04 Prepared By: Bret Moskal Project Name: Polygon at Bull Mountain Date: 4/12/17 _.._ . _.__..,..____..___:.__.._ Location: 15402 SW Seine Court,Tigard, Report#: 159 Oregon Arrival: 1100 Departure: 1230 Weather: Overcast, 50's Permit#: MST2016-00025 Site Visit Requested By: Ken (Polygon) Met With (on site): Ken Purpose: Observe lot 30 subgrade Outstanding Issues: Lot 30 subgrade Upon arrival I met with Ken and was directed to area indicated on attached site plan of prepared subgrade for the building within lot 30. I was informed that earthwork crew had placed and compacted approx. 2' to 4' of recycled concrete on the surface of structural fill subgrade. Crew compacted recycled concrete in approx. 2' lifts utilizing a Hoepac. Using a Troxler 3430 nuclear density gauge I tested the relative density of the material that fall underneath footings and compared the results against a field assumed proctor value of 120.0pcf. Areas tested met our recommendation of 95%compaction of optimum dry density value. I observed 14 to 15 blows on a%"diameter steel pin with a 6-lbs hammer to drive pin approx. 12" in to material, indicating density compacted material. Based on our observation, testing, and pin resistances, area observed today and indicated on attached site plan has been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments: Site Plan (1), NDDS (1), Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does riot include supervision or direction of the contractor,the contractors employees or agents Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the Geooesign project manager,as indicated by initials in the"Reviewed By'section Yr • f" Signature: ei "'`�+ ........... „; 9450 SW Commerce Circle,Suite 300 I Wilsonville,Oregon 97070.1 Off 503.968.8787 1 Fax 503.968.3068 EOESIGNZ NUCLEAR DENSITY GAUGE DATA ' GDI Project: Polygon-1 22-04 Project Name: Polygon at Bull Mountain Date: 4/12/2017 Sampled By: btm Project Location: SW 1 50th Ave, Tigard Page: 1 of 1 Material Source Maximum Density:pcf(required) Optimum Moisture A Baker 3/4"-0 A 127.7 .cf re•uired A 12.00% B Recycled concrete B 120.0 pcf(field assumed) B N/A C C C BG =below grade _ % Test Date Location Elevation* Fill Type Compactor Density % % No. Moisture Maximum Required 1 4/12 Lot 30 exteroir cont.footing-see site plan 0 B Hoepac 114.0 11.1 95% 95 2 4/12 Lot 30 exteroir cont.footing-see site plan 0 B Hoepac 115.1 11,3 96% 95 3 4/12 Lot 30 exteroir cont footing-see site plan 0 B Hoepac 116.7 11.0 97% 95 4 4/12 Lot 30 exteroir cont.footing-see site plan 0 B Hoepac 113.9 12.6 95% 95 5 4/12 Lot 30 exteroir cont.footing-see site plan 0 B _ Hoepac 116.2 11.2 97% 95 1 Polygon-122-04_041217_FR159_NDGD_btm _4 -