Plans ESIGNY FIELD REPORT Page 1 of 1 GM Project: Poly.on-130-05 Prepared By; Daniel Stai • Project Name: River Terrace Northwest Date; 4/7/17 Location;.. . Scholls Ferry Road.and Roy Rogers Report#: 166 Arrival. 1235 Departure: 1320 Weather: Cloudy, 50's Permit#: TBA Site Visit Requested Sam(Polygon) Met With(on site): Gary(Strauss) Purpose: Evaluate Subgrade of Building 13(Lots 211 to 215) Outstanding Issues: FR 51 (01/14/16)Lot 122 to 123 retaining wall FR-136(9/14)low,density pavement . WNW 13....subgra l Upon arrival, I observed the excavator was still in the process of cutting subgrade to finish grade for.building 13. Subgrade soil appeared to consist of brown silt. Contractor informed me that areas covered by crushed rock were at footing subgrade elevation. About half of the site was cut to grade with the remaining needing an additional 12 inches or less of excavation, except the southernmost half(see site plan for approximate locations). I used a6 inch diameter steel"T"probe to evaluate relative consistency of the silt subgrade. Sqbgrade was generally stiff with probe penetrations under full body weight under 12 inches. I observed a wet area in the subgrade that had been covered by a few inches of 1 r4 inch minus crushed rock. Gary said the water is from seepage and is not in footing area. Area generally probed medium stiff with penetrations deeper than 12 inches,which is acceptable for the building slab. Gary said he would remove any soft soil and replace with crushed rock if the area worsens. Shawn Dimke called and discussed the seepage with Sam on 4/11/17. We understand the seepage is very slow and the area will receive-18-inches of crushed rock fill for the slab. Gary indicated that some areas of the site were below subgrade elevation and that he had placed 1 to 2 feet of crushed rock to fill areas on the north side of the building pad. Crushed rock areas were generally not dense and I recommended compaction before concrete forms area placed. Gary said that he would roll the areas using a Bomag BW 120 AD-3 that is onsite. I also recommended that any areas of exposed subgrade at finish grade be covered with crushed rock and"keyed in" with a small plate compactor to prevent disturbance from rain. Based on our observations,Building 13 subgrade evaluated today is being prepared in general accordance with project requirements and our geotechnical recommendations. Distribution: Attachments:Site Plan (1); Reviewed by: SMD This report presents opinions formed as a result of our observation of a Miles relating to geotedinkal engineering or < < • we rely ger to comply with the plans and specifications throughout the duration of the project @resp of the presence of our representative.Our work does not supervision or the contactor's employees or agents.Our firm is not responsible for site safety,This field report is a DRAFT representation of our field• - kandThe report can only be considered final upon resew of the GeoOesign project manager.as Indicated by Initials In the'Reviewed Of section. Signature: ...oil". 15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068 rpo-tfsNJ- lac s 9 /7/17-1 ' r . 16(c, \ a \ ' �'® TRACT L � .. I PJ2A3 7 6.00' \ PUE, TYP \ {• �'" r Al/-...._ __.r.A, ,.,/ _ \, ',,,- , .',. '',,,,,,, \ - , 1%. .,.- ,... .., \ F� \ 13 - " 208 \ -134 PUE,TYP \ k 0,�0 \ .. 4 il " : p ,:t 2 A.� " Puddle from 's \ \ , Seepage \ , \\f '` • • t ' -: ' * • .. ',,.. ' \--.,',..,', - 0 .‘ ..-:...,.-..- ` Antes �� td „ ,. ��� � �..1 /� j/'C 1 .'aN A \ A S rzov ti,‘‘ s ..\-,,,,o, ifyi>liiiir ‘'..0,,,l‘ ':,'-:i.--Iii �,�, , \ , n ./ \ \' \ . tZS:S1 4. Z ' of GR-ws'4B0 (Loac 11 `11111 w t-- 2' 7}v ty,tzA-0 " f k 41)(11 5vper- /4/Le-A- p .c,, 6,,.