Loading...
PFI2015-00192 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12015-00192 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/24/2017 Parcel: SEG1073 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Tigard Downtown Alliance PFI Project Description: utility style poles in right-of-way to support overhead cable system to advertise community events. Owner: FEES Description Date Amount PFI Permit Fee 12/17/2015 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: STEVE DEANGELO 12345 SW MAIN ST TIGARD, OR 97223 PHONE: 503-620-9020 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant See application Signature: Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00192 Type: Condition Name: Status: Severity: PFI—Street Imp 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Street Imp 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Street Imp 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Street Imp 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI—Street Imp 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Street Imp 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Street Imp 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure PFI—Street Imp 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI—Street Imp 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI—Street Imp 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI—Street Imp 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI—Street Imp 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI—Street Imp 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI—Street Imp 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Street Imp 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Street Imp 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI—Street Imp 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI—Street Imp 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI—Street Imp 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Street Imp 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector. PFI—Street Imp 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Street Imp 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI—Street Imp 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI—Street Imp 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI—Street Imp 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI—Street Imp 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Street Imp 29-PRIVATE WATER QUALITY FACILITY Applied Notice The Developer shall maintain the water quality facility and correct any defective work, and shall perform all scheduled maintenance to assure proper functioning of the facility PFI Street Imp 30-PUBLIC WATER QUALITY FACILITY Applied Notice The Developer shall create and provide to the City a schedule for periodic(quarterly)maintenance of the water quality facility. The Developer shall maintain said facility for a period of three(3)years from the date of City Conditional Acceptance of the public improvements. On October 1st of each year during this three(3)years period, the Developer shall report, in writing, maintenance activities to the Director of Public Works. City crews should monitor proper removal and disposal of silt and debris. Prior to City final acceptance of the facility, the Developer shall provide a written evaluation of the operation and maintenance needs of the facility and correct any deficiencies identified in the evaluation. PFI—Street Imp 31 -OTHER Applied Notice City of Tigard !, e PUBLIC WORKS—ENGINEERING Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: ❑ Utility Connection ❑ TYPE 1-Franchise Utility Work ❑ Sidewalk/driveway approach Work performed by NWN,PGE 'Street improvements and/or utility agency. Detailed description: t/h L(1"1 5�j le Po Lr S h:) ❑ TYPE 2-Sidewalk/Driveway/Sewer a -N Qv e_✓ 6L ek j C'A SL v' St, f f-f.�� �c Work performed for the purpose of: 9-114' r( Cov" A/1 U til r LI C ✓i N T-1 • Sidewalk installation or repair. • Driveway approach installation Property address/location(s): :LJ - ^onll' D /15 0 0 9i.•) and/or repair • Sanitary sewer lateral installation 3,o sw,t �� � o,,,� 1 a S o U 1073and/or main line tap ;� ❑ TYPE 3-Full scale Development Applicant: �,��1�20 -J,ow.v town 11iliM c.B Work performed with Land use approval which includes any of Address: Z-344 � / ,/t/�A l�v the following: City/state: T C-A­ 0 Zip: `77 Z Zj • Subdivisions or Partitions Phone:f 3 .6 ZO - `%0 Z O Email: Sie`^e Q aRif-ri V2 6 7 de*1 ge%S.C • Street widening Contact name: 5Zyo 1)lf/?v!2 el, Phone: S 79 3- fuz a a Mainline installation for Sanitary sewer,Storm sewer,Tigard water Contractor: 1-a D and/or Tigard Water Service Area CCB#: Expiration: SUBMIT COMPLETED APPLICATION TO: Address: City of Tigard City/state: Zip: Planning/Engineering 13125 SW Hall Bbd. Phone: Email: Tigard,OR 97223 Contact name: Phone: Applications for"minor work in right-of-way" only may be emailed to: Engineer: C I/f,/`Aw _ Y"` c L C_, ro r its tigar� d=or gm Address: ` S O &w ��( �O r--,.Aj FOR S'1AFF USE ONL) City/state: Zip: S`7Z2 3 Phone: ti_03 L 64 34 )8 Email: Case No.: 1 (�I Lois _,elOy l g Z Contact name: Co-4- M C L eo.p Application submittal fee: Additional fees: Estimated value of work is required(if over$5,000):$ 1 Application accepted: (within the public right-of-way) By: wl 6 Date: 17-jJ71 1 Application reviewed: Is work related to a LAND-USE DECISION? ❑ Yes R-'No By: 116-Z-Ll- Date: If so,please specify (MLP,SDR,SUB,etc.) case #: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes EKNo By: Dare: If so,please specify(BUILDING PERMIT)case#: I:\CURPLN\Masters\Land Use Applications Rev.07/09/2015 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 I APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. *When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(-)must silm this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject gropul;r. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. Applicant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4 1 DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facility Improvement(PFI) Permit: DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal � 300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY Part 2: All non-water system improvements CONNECTIONS,ETC. Engineer's estimate X 5%(less$300.00 submittal fee) (work in the right of way) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE Dimensions f f o Part 3: All public water system improvements V,it,e et Name Engineer's estimate X 12% Address PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required FULL SCALE DEVELOPMENT for the following types of work: (Subdivisions/Partitions and Street Improvements) • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (G sets,24x36 or 22x34) • Weephole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.) • Lawn sprinkler system installation or repair ❑ Street(Plan,Profile) • Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile) • Planter strip landscape maintenance ❑ Water Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A casb assurance maybe rewired per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140. (customer deposit) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 1 SAMPLE SKETCH: Edge of Pavement I -44— Ditch Streetlight I —•—•—•—•—•—•—•—C—•— I Raaf Dnin f T.r � 0 I I ,,M. 1 � o Existing House Existing • i'I Q Wi Drivewy v1 I 1 do r l W >� I 1 o • Existing Shop j = j Power ole I I o I a 95' ------ ---------- • I -property Line iI Fire Hydrant(FH) � � I Scale: 'I"=30' � I I � I I ' I I � � I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines&dimension Slope of property Street&street name(s) Existing building,structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City, of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 CITY OF TIGARD RECEIPT N 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 Receipt Number: 401114 - 12/17/2015 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID PF12015-00192 PFI Permit Fee 100-0000-43114 $300.00 Total: $300.00 PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Check 1503 MBILODEAU 12/17/2015 $300.00 Payor: Tigard Downtown Alliance Total Payments: $300.00 Balance Due: $0.00 Page 1 of 1 City of Tigard ■ Memorandum To: Mayor John Cook and City Council From: Lloyd Purdy, Economic Development Manager Re: Downtown Tigard/TDA Cross-Street Banner Project Date: December 9, 2015 The Tigard Downtown Alliance is prepared to fulfill their commitment to a$50,000 Washington County Visitors Association grant to enhance the visitor experience in Downtown Tigard. This year the TDA has added the following elements to Main Street • 20 hanging glass baskets • A dozen decorative bike racks • 9 benches • 2 Bike tune-up stations including air pumps and bike repair tools • 20 two-sided banners promoting Downtown Tigard community events and attractions. The TDA's final project,with this grant funding,is a custom cross-street banner system that can be used to announce downtown events and programs to visitors. The model for this sculptural element is a similar project in downtown Estacada (photo on right).The TDA . #'I)'rtW+a.;Fxa,W �41ALADA' has asked sculptor Ben Dye to create something unique to Tigard. Each pole is constructed from a 22' tall steel light pole. The pole and steel plating is welded to a '/z" steel base plate. Each base plate is anchored to a concrete foundation. 1of3 Preferred location in Downtown Tigard The TDA walked Main Street with a team from the City of Tigard's engineering and community development department, and looked at six possible locations for a cross street banner system. The area circled above seems to be the most realistic because it provides space out of the walking path of visitors and provides for high commuter visibility. t Fy The proposed cross-street banner site, circled above in red and featured in the photos to the right, is on the block south of the Main and Burnham Street intersection. This area has improved visibility- catching the eye of motorists on Main Street and Pacific Highway. This sidewalk area is underutilized given the large bump out at this location;locating the banners in this area would improve message visibility by downtown visitors waiting for bus service. The photos on the last page of this update are provided by artist Ben Dye. They illustrate the process he uses to recycle an old street light into a banner system that can be used without a lift ¢4: truck or extra equipment. 2 _tq0TV M m*_<fp� 1A '-A Lis AW(,4"e-E 6 W6,r,7PX 6a -77,7- Hi-riHa-Tl A L k (S 1h Al L, L rr-V A-T1 0 "'gip OP 00,0771V FILE NO. Ll SHEET NO_ f R 9tJ __ MADE BY_. _ _,,,__DATE sc CLIENT PROJECT Ari"' ............... .................. rmi• �-s�s•� 15 r/ ��;L ..� - ..fke�'f�1,'� �ar byf,�car �l less` y j -Olef • �- . 4.0 '".04.447W Jo;� Iii►� E..1 .•Gl i!•,�(,�/ '�y +'1'" 4.•}C.,j PF H:,Vi t t�iN? 'C 1 FIf'L G B it Chi lA llls W tn4 iai"N Qow aW-7�-- Daa: r W)AAD, G044 , *r., 3/11. 9,73 sJ rtaa l.r a v r'sLar C~f3�JiJ,,tS GoN^^�'i�.a�,,,. tS v`�. JF t�7K a?'` - k.Fr�j�.• �' 7.�-'�i Zip (gIc&JSP to* Lo u*af 1 � u � S � • ,, . Iow— FILE NO. �J l6 1 _._SHEET NO,__ .. MADE BY__` J c CLIENT .1+�•�i2'�M1/ L L�LG�Lt ".�M�. _..._ ENGINEERS INC. PROJECT, ��1clr4�fi�. _J�r _ _ _ MSC Engineers,Inc. Job# 151104 Date: 11/10/2015 Sheet# 1.2 Project: Banner Foundation Designer: W.R.Pease,PE,SE Client. Curan-McCleod Enginee Geometric Data: B= 30 ft horizontal dimension of sign or wall h= 20.5 ft height of sign or wall S= 2.5 ft vertical dimension of sign or wall C= 1.00 ratio of solid area to gross area 4= 0 ft horizontal dimension of return comer(if any) A,= 75 ft" gross area of sign or wall B/s= 12.0 aspect ratio s/h= 0.1 clearance ratio t_,is= 0.0 return ratio Occupancy CategoryIl Exposure B Ultimate Wind Speed 120 mph 3 second gust ASD Wind Speed 93 mph qh=.00256K1KI KIV21E KZ= 0.66 Exposure Coefficient K2t=F71.00 Topographic Factor Ko= 0.85 Directionality Factor for signs and walls G= 0.85 1 Gust Factor qh= 20.7 psf qh(ASM= 12.4 psf Design Mind Force:F=ghGCtk(lbs) Case A&B: Cr= 1.9 Net Force Coefficient:C,(From Figure 6-20) Reduction Factor for Area: 1.00 (1-(1-s)"1.5) C,(modified)= 1.9 Net Force Coefficient Modified for Area F= 2439 lbs F(ASD)= 1463 lbs Case C: Aspect Ratio 2 to 10: Cf: F(lbs) F(lbs)ASD 0to s 3.75 4944 2966 s to 2s 2.45 3230 1938 2s to 3s 1.85 2439 1463 3s to 10s 0.95 1252 751 Aspect Ratio> 10: r C,: F(lbs) F(lbs) �0 to s #N!A WA #NIA ti TW Cv� 44C� 771, to AV N4,., Is TV 11........J .............................. .......... ............ A Av FILE NO. j SHEET NO. '® MADE BY-__� AA CLIENT 6AAW- AA11-1 ('141 L*IJA ENGINEERS INC. PROJECT ........... a,.�w....:P:w,m.,W„�SW�...�.a.�,.•--.1-....E..,,,R�.� :�..I.,....,.,.><�,,,<.,�.,��..�.�._..,.�a....a„�w,-FE�t 4tlw.pepwtw++wv.•«Ppr•W W+gYN wW WM4M.r N iM1IM.MCS"W Mv+•w wV 4ww girut 'li1,wA F C�•Y+wKewiTV•I•iRU+•wMIK�vaNmOi bMSN W IYwRA•W iW+wn w�Y.iM,M.aW rlfnq:.. ww :co ua. wL .rnw.c a•.s»yl ••V w'c 7iE0. cb .:,—al w.e lo: .tir TN ..�•rt.+q s•u+�: IN.,.H wa M'T Me. CM Iwn •+...• +f••. wL•.Y tP.••t.a'•IG !90^!1"I•yt.I:+I".f wNt IswMaG)••IM fa'i EtNt 0ltYt W7..•14MOa00 wV E:0 KU, tOK c•K u0•q •0•i 4wT -Ow-t A-Q OM`N•••1"—I +M+: wast otro r�raa saex cart ,tro taa: a':e a'aw oz flro'Dvtv"•v.•'4•"+•-r t"'f•fM'!."1tM••`A• un. ocx SaK 000', pOYi BOf'1 am l i.Tl p'uZ u(•+..r F ;�+. ,. .•.x •Y� •tea 4••1^+ �M••Y MZ1RlfiWfMr<ItwCIi1•T�J I+CG tli..1'G yb•'.Y`F.4•',•�•-+:lI"y,411•WPI (WtAtl jjawM•M0�tOYi010"{t�>t{•�PI•i�•�1011+�/�1' wM•IOia.ea�aay aw: 5aL aoc OC'1 tf7 ITY JM.�.RQ•i t,.-+'�`^a-r:'Ta•�P•nt9i KtMw•♦5 --.. ........ a 2 '. wc Oe i21'ylf:'10''S7'M1•'n•V..vy..t a.;y,•"`ttRif.-I- , :•OC ka aft•01�Sr v:!..a;.:J•'t'P!..,Vi'I;Jhw>•�n ;ac/aE*.•IW.T�ra A/eMMw�yp l-' .xM o:ro tlfty mr, ir, K:x amt N"TwE 02't ii`w.M I (t1•% F •.•/. .tea I�.�y y+y IftT•O t3Tlv0''•G A'V'V•.-f•'4(^Y:`tSI. :IaOT 4La: aew mt Caa ytr it•n (y•a s.4•• f+P Eyt OCC'31 T'G'/31r:"'/•-!'r.•J`•Iv��:'OCd�Tua+S CK:•BK :•M•IW EKtM1`CM -V-W i -.w�a1l; tAR:L+w.•t,�1 '�'�' ,9C�fZ+wM� uuT.'>�+•'r�u• yAH'L09 l ".: wMF:n• n.i.� as W x�g <.�::. :t "w ae'sa •.v Wwvl Aad i1T..5'uu a+ w'. xte k K� zY +• '.s.W..Wv.tJS Wttt wi¢a.aKua'•eu tY,•.0�U•,•t,h Ni`f'8•f�•dvt F.t4F - wa.a..�ar..t:i.NSxt M<(106.Y.C..+�VE•nen 1m.I.w4•ew�•a•.wq•n'.MtW. 4r+.'4'w,.•+,w w F.'�C aW•Yaw+N MMeww Sn,••N a.acwb+,avnws.,•a+•Iw.spxV •w1.4 w.•�.*�wrw•.II,a+C M nil.WaN 7<aTFmw�+IIW N.YY.�e'ayytPwpw M.`M9,aP w rb t P an wo SQL MSZ '..K JGi 71 U-4VC9Lj �r ����^ ,'x ��•y`x4fn� w Yay - .. :.c.i tis. .: y '�'.i w•�7�w'R ,��., i , �� . rb+w•w�fac+i'f.o'�.Imo'L.>•�.y.,^:r.-xr � �+ r rl. ,;�1� ,�rr_'N4''/� �; � "� � ; +xk u' s avt: m'. ::roi w: m: taro taro i'ut ocuu 19T'•OL r eWW ..y ../ ...« •`•r 4W•-y 4,,,.y �'«,..:.�. .., Z � �'y '•4E Mi LK.Y O,t L M1 7r.. 10091 4100W IH'•wv IA••cArw..a+t w Mw •ea wat svc Eaaa •rt'.wwtal.,,E.••w rt•AaM .fatatEaa�•rt waw aw••+w a Pa••011t waw n wl+wlst•a..a r..t Le Wy.a sts oy...w.,a.,r•.t Oaf�:l•y-Y ►° SrX � otE=mor•ocs:urnf.••+s'+u+IEoSx r:aAw- aca Lt1pe+. � ooa4r,W Putr w`•,n.n M•..+r•Q+0•a•'a �� >I�+^'1+'N mSbM` 1.enurpwW l,•TWrha�,•••D •H-6dT•af a'9T"i tM1,•a•.o,•.Ow �� A ZI }.. az+ w�+awwawl+-w nmwpaw.w.y wn�aa•rn rw...x.,a.c..wp Tttrvc.t c��taw wro + "nw u.•aM leu.M W++:M4a�,Mhs] W+w.F+r+w.P•�ale.I.rO.y,•.q OLt.01.+0.O.OM f+a•a•OrA•la.••li 0•Ic•tl W:ar:.•Tlsln,t ttl..uq t10E1'I•f•I ap aOSS-�OW+W M••ME'+91Y•fi OOLt:':i.•Irya•gl+•1 Y.►a1y gl.wu,4w•R++"•M,0 Sb'C.11PO.vu.t7 tK 1.f P.at at1104.Maa••w0••wr.POt .wW a'•+n.Ma.wq.�..u..u+.p".y rw•+uci.1'F MY/ a«W. �.<y uu ttp.ta.new•nw.w+suf. ra^•w +. y,.p,a Tlt, 0'0601 Oa:l :'a•Et: IWeC m9C'!!•4!•.'.a.m unl•Mj w.+oT•..gr e�w 0•c.nfl tteT LFL t'afl :201 a'0 f aLO�f.�+ti0b•Iw�.{+Mewl +Fe leiwYf.l•f', out t +h•c7+••"N'•t`IW tf tlt q/OaA.�.Mp LMS Lit Lta: a'.aL I 491C GLC t:6t WTIM C 'l i'STS C1a1 !LO[ felt. L ���•� t.•. LPLi FPit L Ai. flab l wo tMP1'+�••1 M+••r."t•,C 091 atMa.•'+�•✓>rM w•iullq,vJ i�.r9rMu� YMI,INS '•1•M+.••K' 'M••1..•1 MIV a.alc•..p+4•a•w•p•t'S1.E':Owi'W14,ww atiYa :4,trm c•�BI. R iC:•faC•mt w•+t0 • OICI•aKiOt •+,tMJ '�"� tMCt'CLtesIM1 .••FIY W6•parA stnq V ORS ._ •wq•p.ny w.rl6 tc 11 S• �Wttt'L+•6,N T+[ 3f'Sd'••.•s bW.Y ��r� t't �•a� lf.y l•w1'T.14Y. B +wNS sta[.52it: av1 ya "t:GttlpYQ-4-Y Iffspifiii stv_u:l •.G ..E., rr,Al+dN -4-V Title: Tigard Banner Foundation Job#151104 Dsgnr: W.R Pease,PE..SE Date: 4:03PM, 24 NOV 15 Description:2.5'high by 30'long banner Scope: pole foundation and anchor bolts--Pole by others Rev: 580000 ---- --- —User KW-%0572.3 Ver,8.0,1•Deo-2M3 Pole Embedment in Soil Page 1 (c)1983.20W ENERCALC Eng_neenng Sc r r a e octtrnd r :Caswiat crs Description Smaller Banner pole with Point& Uniform Loads--with reduced banner size i General information Code Ref: 1997 UBC section 2907g2,2003 IBC 1805.7.2,2003 NFPA 5000 38.4.3 T Allow Passive 300.00 pcf Applied Loads... w Max Passive 1,500.00 Psf Point Load 1,160.00 lbs Load duration factor 1.333 distance,from base 20.500 ft Pale is Rectangular Width 48.000 in Distributed Load 20.00#,'ft No Surface Restraint _ distance to top 22.000 ft distance to bottom 0.000 ft I Summary _ Moments @ Surface... Point load 23,780.00 ft-# Total Moment 28,620.00 ft-# Distribu':ed load 4,840.00 Total Lateral 1.600.00 lbs I Without Surface Restraint... Required Depth ✓ 5.000 ft Press @ 1/3 Embed... Actual 659.27 psf Allowable 661.54 psf t ANAE If tI i / 1st'p Structural Calculations for BANNER FOUNDATION(Tigard,Ore on) itAL r WWJ Client Curran-McLeod Inc. - 6655 S W Hampton St, Ste 210 Portland, OR 97223 "Alm R 1� (503) 684-3478 31 Codes: 2012 IBC Amended by Oregon Structural Specialty Code with 2014 revisions. Index: Calculation Sheets 1.1 thru 1.5 Footing (Enercalc Output) APP-01 Sketch SK-1 Notes: 1) See Calc Sheet 1.1 for design parameters 2) Concrete - F', = 3000psi - min 5 sacks/cement per yd3 (Structural Engineer waives requirement for Special Inspection- verify concurrence of local Building Official) 3) Reinforcing steel - (Hoop only)-A615, Grade 40 minimum 4) Pole, banner, etc.—by others '7 1-T- 5) Anchors to be Simpson Strong-Tie; diameter with a minimum of 6?5" effective embedment (7-.'Tminimum length). -4 z"' - �I 6) Anchors require Special Inspection Limitations: Engineer was retained in a limited capacity for this project. Design is based upon information provided by the client, who is solely responsible for the accuracy of same. No responsibility and/or liability is assumed by or is to be assigned to the Engineer for items beyond those shown on these sheets. TO ENG'31NEEr25 [NC;�, JOB No, 1511 Q4 SHEET No. cover + MADE BY WRP DATE 11/12115 CLIENT Curran-McLeod Engineers PROJECT Banner Foundation(Tigard) Artma Designer+ +'xi.E'r­Y L_ Sotware SO1 i3w M. I OM Paa d"w I's f- U w ......................... .......... ................... .................................. Construction Process Matching banner poles welded mform acro@a#etbnnr. Eab& 2 feet[ d � . �y . Design dt&! o£cross bracing. Cranking system mlift banner from sidewalk to top o£poles. <� 3 Page 80 2011 Edition 5.3 Two-Lane, Two-Way Roads Shoulder Work w/ Minor Road Encroachment Diag. 300 Use this detail for non-freeway work which extends into a travel lane and maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane can not be maintained, or when traffic can not safely pass by in both lanes simultaneously, use the appropriate lane closure diagrams—for example, Diagrams 310 through 350. A lane closure may be appropriate for conditions such as high traffic volumes, high speeds, and inadequate approach sight distance to the work space, or heavy equipment adjacent to the travel lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Cones shall be placed along the entire length of the work space. If a protection vehicle is used and work is in place one hour or less, the taper and tangent devices may be omitted. 4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there is limited sight distance, consider placing cones or tubular markers on centerline. 5. An arrow board in caution mode or truck-mounted PCMS with "SHOULDER WORK" or other appropriate message may be used for higher visibility. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 100 35 40 350 350 350 125 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 r � 2011 Edition Page 81 Shoulder Work w/ Minor Road Encroachment Diag. 300 ROAD WORK i A � to AHEAD • Initial Warning A • Sign • • • (Optioned • • Protection Vehicle _ w/TMA(both Optional) See Chapter 4 • Buffer 1 s-7 10' • minimum • LJ3 • A ROAD M NARROWS (Optionaq B ROAD WORK AHEAD Initial Warning Sign December 2011 Chapter 5 1 1 1 o-1G✓> r r1 �- � I I C� COD (daap ,Z 8) HPYSS .67X3 — 1 O N 0+ — - - - - N • y x' ! — I M — I wy NVS NVS Nd p - 3 o � c� oA o� 0 p I O O �� —+ �L Q 90+l l a + oo+sz a oo+8z m o f la"91 o -0 Ook • 3 P a s' 1 Z 1 I Z 73- D DI m I 1 1 z