Loading...
Correspondence len sr 2bJG 005 73 15-0`1S SC() 71 sr IPWU ENGINEERING INC Email: pwuengineerinqa,comcast.net Ph: (503) 810-8309 Structural Memo: Job #: MC16302 Date: 4/03/17 Client: Mark Stewart Design Project: Corbin Estates Lot#7, Tigard, OR The height of the stem walls at the garage piers were not poured high enough, and as a result the aspect ratios of the shearwalls at the garage piers exceed the maximum height to width ratio allowed. The shearwalls at the garage piers cannot be used as legal shearwalls due to the aspect ratio. The garage area has been re-designed in rotation to carry the load from line A. The existing shearwalls at line B are adequate to carry the increased load. The existing shearwalls at lines 1 and 3 are adequate to carry the torsion load. No revisions to the existing shearwalls or holdowns are required as a result of designing the garage in rotation at this time. The existing shearwalls and holdowns at the garage piers are to remain as originally installed for added redundancy. See attached revised calculations and revised lateral plan. $.0 PR Open. ' ' 19 1 E 4 1p $ 0N 1 Expires: 0 1 ,/ 01