Project summary
We are removing the existing,small(5'x5')bathroom,and repurposing the"office"as a new bathroom,and the bedroom adjacent to it as a
walk-in closet. We are not structurally changing the house in any way. We are not moving any load-bearing walls,or adding any square
footage to the house. In the pages that follow,we show the new layout after the remodel is finished,as well as the walls that are being
removed and the walls being added.
The existing windows are tempered glass,and appropriate for egress. We are removing 3 windows,the windows that remain are already
egress-appropriate.
We will add insulation in the floor and in the ceiling to bring the area up to code(there currently isn't enough insulation in this area of the
house).
CITY OF TIGARD C r ,�' r 'r)
FOR CODE COMPLIANCE R ''`r','i ' i y raLIANCE
AlTpVII:Erove17da I
MCI -x t
I: 1 l •
.R..ft
Permit 0 1 ' •
Address: j)3 9 o c)2 ,,r•1
Suite#:
Bps 7 Date! Lj • 1 Z — )7 1 1. .te:
r
New Floor Plan
Tempered
(7b
):)
! JJ!II
_, =canned lights
Bathroom I Walk-in closet
ibo I 8.5'x14.5' 8.5'x11'
=overhead fan(50 cfm)
0
= Load bearing 0 III
•
Egress Window
HC a @r/
I ) zx t
Master bathroom Guest bedroom
15.5'x 13' 12'x 10'
1 1<.►,S
F
JYJL
0
Fireplace Bathroom 1
R 319- . C
R 3 ) `x . 3 .
Si.s.N a1<c cIc '
2
Walls being removed
- =Walls removed
=Load bearing
1111111
Egress Wlndow
0
F
Fireplace Bathroom 1
3
Walls being added
Bathroom
8.5'z 14.5'
=Walls added
=Load bearing
Egress Wlndow
Fireplace Bathroom 1
4
1
External framing
I
.,
Fireplace
fit`''
Fir
These open bays are on the out ' •
house, must be framed in to cap
space in the bathroom
,J/,
4