Report (39) Av-5"-cd-°Ce - s333 O
/1
11111111 HCE
RECEIVED
APR 11 2017
Memo CITY OF TIGARD
BUILDING DIVISION
To: McKenzie Hart
From: David J. Horn
Date: 416!2017
Re: 9565 SW Ventura Ct
We have reviewed the as-built framing at the above-mentioned residence and find that since the
existing ceiling joists are continuous over the proposed wall to be removed in the bathroom, the
proposed added 4x6 beam is not required.
„w) p RO; .
,----- C,f PSI,c. 5' .
f,e� ii 'I syr [
.0.1-14/ J
E uire:J. fi-3 -17
9320 SW Barbur Blvd, Ste 135 Portland, OR 97219
Phone: 503.892.57H2 Email:dave@hornce.com
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
IN _ * Transmittal Letter
e
r ,,;\i.n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: 71I44fv^/ DATE RECEIVED:
DEPT: BUILDING DIVISION
RECEIVED
FROM: PAN/19 &i A'y,i1-- APR 11 2017
COMPANY: l/1,I� 4�
C n. ALic-rlafa, L&.G CITY TjvisiON
�D
BUILDING
PHONE: , ,c, .SS o By:j7T
RE: l V ' R -- Gi, ,t4 ---,2.0/&,- 33
(Site Address) (Permit Number)
(ProUtittr subdivision name and lot number) )4V KA- L--- 3
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: I Description: I Copies: I Description:
Additional set(s)of plans. I Revisions: 61611V it4 16J 6--
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS:
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Initials:
Fees Due: ❑Yes ❑No Fee Description: Amount Due:
$
$
$
$
Special
Instructions:
Reprint Permit(per PE): [ Yes E No 0 Done
Applicant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions_061316.doc