Loading...
Report (39) Av-5"-cd-°Ce - s333 O /1 11111111 HCE RECEIVED APR 11 2017 Memo CITY OF TIGARD BUILDING DIVISION To: McKenzie Hart From: David J. Horn Date: 416!2017 Re: 9565 SW Ventura Ct We have reviewed the as-built framing at the above-mentioned residence and find that since the existing ceiling joists are continuous over the proposed wall to be removed in the bathroom, the proposed added 4x6 beam is not required. „w) p RO; . ,----- C,f PSI,c. 5' . f,e� ii 'I syr [ .0.1-14/ J E uire:J. fi-3 -17 9320 SW Barbur Blvd, Ste 135 Portland, OR 97219 Phone: 503.892.57H2 Email:dave@hornce.com FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT IN _ * Transmittal Letter e r ,,;\i.n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: 71I44fv^/ DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: PAN/19 &i A'y,i1-- APR 11 2017 COMPANY: l/1,I� 4� C n. ALic-rlafa, L&.G CITY TjvisiON �D BUILDING PHONE: , ,c, .SS o By:j7T RE: l V ' R -- Gi, ,t4 ---,2.0/&,- 33 (Site Address) (Permit Number) (ProUtittr subdivision name and lot number) )4V KA- L--- 3 ATTACHED ARE THE FOLLOWING ITEMS: Copies: I Description: I Copies: I Description: Additional set(s)of plans. I Revisions: 61611V it4 16J 6-- Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑Yes ❑No Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit(per PE): [ Yes E No 0 Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc