Loading...
Specifications 64i icfpci,t,- 1r_ HORN CONSULTING ENGINEERS LLC Digitally signed by �r Calculations: Horn Structural Calculations: DN:cn=Dave Horn, Project: JTS-16-13 Enginee s°onUlting ( email=dave@hornce.co Date: 7/8/16 m,c=US Date:2016.07.08 Project: New House: 16:03:50-07'00' Lot 3 Edgewood 2545-3 EL B GL 3 CAR Subiect Sheet#'s Lateral Loads L1 — L6 Framing Fl — F8 Footings FTG-1 PR o/c,. *C,IN n ?151311PE 37.• 0 ►.!N ,e) 1 fr/0J. N6\ Expires: 6-30-17 The following calculations are for lateral wind and seismic engineering and gravity loading of the beams and columns. All retaining wall designs should be verified by the geotechnical engineer of record prior to construction. Failure to do so invalidates their design. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. Horn Consulting Engineers shall have no liability(expressed,or implied),with respect to the means and methods of construction workmanship or the actual materials used in construction. Horn Consulting Engineers shall have no obligation of liability.whether arising in contract(including warranty).Tort i including active,passive,or imputed negligence) or otherwise,for loss or use,revenue or profit,or for any other incidental or consequential damage. 115 9)2 555 H srtc }i • :..._ • '219 f'._ _ X' 2 3 _ • ,,. ., 'u';, HC u E HORN CONSULTING ENGINEERS LLC • New House: 2545 Elevation B 3 Car Garage Code Basis of Design: 2014 O.S.S.C. and 2014 O.R.S.C. • Wind Loading: Per ASCE 7 Fig 6-2 See attached elevations for wind loading breakdown per level. 120mph 3-sec gust Exp B. The mean roof height of the house h =24' approximately. IN IYIY Vr1\3 Direction 1 End Zones1 "Za.......----0,._ 010 it,.....- it 10 _.,---- le----(;FRS . Direction 2a " • End Zones Note:End zone may occur at any corner of the building. a= .10*34' = 3.4' orforh = 24' a = .4(h) = .4(24') = 9.6' a must be larger than .04(34') = 1.4' or 3' a = 3.4' controls Therefore: 2a =7' see Fig 6-2 ASCE 7, and Figure above. CAPITAL PLAZA SUITE 135 9320 SW BARBUR BLVD. • PORTLAND, OR • 97219 PHONE: 503.892.5782 • EMAIL: DAVE@HORNCE.COM LL Hc E HORN CONSULTING ENGINEERS LLC Seismic Loading: D1 seismic design category per O.R.S.0 Sps= .72, R = 6.5, W=weight of structure V= [1.2Sps/(Rx1.4)]W V= .095W • Roof Dead load = 15 psf Exterior Wall Dead load = 12 psf Interior Wall Dead load = 8 psf Floor Dead load = 12 psf Seismic in Front to Back: Wr=[.095(47')(15+6+4)] = 111.6plf < 137.1 plf therefore, wind governs in both directions. W2 = [.095(52')(12+12+8)] + 111.6pIf= 269.7plf< 270.2plf therefore, wind governs in both directions. Wr2 = [.095(20')(15+6+4)] =47.5plf < 80.5plf therefore, wind governs. Seismic in Side to Side: Wr= [.095(34')(15+6+4)] = 80.75p1f W2 = [.095(34')(12+12+8)] + [.095(6')(15+6+4)] = 117.6plf Redundancy Factor= 1.0 per ASCE7 section 12.3.4.2 • • CAPITAL PLAZA SUITE 135 9320 SW BARSUR BLVD. • PORTLAND, OR. • 97219 PHONE: 503.892.5782 • EMAIL: DAVE@HORNCE.COM L3 E • HORN CONSULTING ENGINEERS LLC Roof Diaphragm: Grid Line A Grid Line 2 P = (0.1371) klf x 17' = 2.3k P = (0.1563) klf x 23.5' = 3.7k V= P/(37)' = 63pif Type A Wall V= P/(19.5)' = 190plf Type A Wall Mot = 8.6kft Mot = 10.3kft Mr= 18.6kft No HD Req'd Mr= 3.9kft • T = 1.06k Type 7 HD Grid Line B P = (0.1371) klf x 17' = 2.3k Grid Line 5 V= P/(42)' = 56p1f Type A Wall P = (0.1563) klf x 27.5' = 4.3k Mot = 8.4kft V= P/(12.5)' = 344pif Type A Wall Mr= 22.6kft No HD Req'd Mot = 6.9kft Mr= 1.0kft T= 2.4k Type 8 HD • • • • • CAPITAL PLAZA SUITE 135 9320 SW BARBUR BLVD. • PORTLAND, OR • 97219 PHONE: 503.892.5782 • EMAIL: DAVE@HORNCE.COM I-9 • HE • HORN CONSULTING ENGINEERS LLC 2"d Floor Diaphragm: Grid Line A Grid Line 1 P = (0.1331) klf x 17' + 2.3k =4.6k P = (0.0925) klf x 2.75' = 0.3k V= P/(41)' = 111 plf Type A Wall V= P/(8.75)' = 29p1f Type A Wall Mot= 16.0kft Mot = 0.9kft Mr= 16.8kft No HD Req'd Mr= 1.5kft No HD Req'd Grid Line B Grid Line 2 P = (0.1331)(17)+(0.0975)(6) +2.3k = 5.2k P = (0.0925)(2.75')+(0.1309)(14.5) + 3.7k= 5.9k V= P/(20.5)' =251 plf Type A Wall V= P/(11.25)' = 520p1f Type B Wall Mot = 46.3kft Mot = 14.1kft Mr= 25.8kft Mr= 1.6kft T = 1.0k Type 1 HD T=4.2k Type 2 HD Check Sill Plate Grid Line C P = (0.08075)(19.75)+(0.1176)(17.25) P = (0.0975) klf x 6' = 0.6k = 3.4k/ 11.25' = 322p1f No 3x Sill Req'd V= P/(20)' = 29p1f Type A Wall Mot = 5.3kft Grid Line 3 Mr= 26.2kft No HD Req'd P = (0.1309) klf x 24.5' = 3.2k • V= P/(28)' = 115p1f Type A Wall Mot = 12.7kft Mr= 10.9kft T = 0.2k No HD Req'd Grid Line 5 P = (0.1309) klf x 10.5' +4.3k= 5.7k V= P/(6)' = 946p1f Type E Wall Mot = 25.5kft Mr= 1.3kft T= 8.1k Type5HD Check Sill Plate P = (0.08075)(31.75')+(0.1176)(15') =4.3k/6' = 721 plf 3x Sill Req'd • CAPITAL PLAZA SUITE 135 9320 SW BARBUR BLVD. • PORTLAND, OR • 97219 PI-TONE: 503.892.5782 • EMAIL: DAVE k@HORNCE.COM ) • 1."1"IL J 1_j z 1 ril .. ..---7-.-......___._-.7.77----...L. I ir 1-1 4 i11rii:- arm -- MIN __ • I � " ® r _. 4--*� e N rp:4011— �- = meg : 1- • • . ==. ' �- I SA, /‘SU t lei . //. . ..S'il.= ..._ a-------_-_-_-. �. __ , � =en 1 ,, ! It al 1f , 0, ., : ,, „ , , ,, ,, , . A i , ®� /J4i( "; gag:cxi cam \t I E . ��� • • p :iE .a e42 4. 9 s42 /S-ZZ =b, 0-i ="e _taw.? r£ SL 4Xe Hsi a2) -E. -2)st! to t. ,f.. S•S? •4.1 b =`l' -z.$lZ t•iw4t zI s 111 IZ zYZ I IA - sfi - o�•vo12:•"11 I I � I :A M ya S----40 *Si `�9j �l�a z •Q z. h z ,o�)Z \/// V \ ,--I A. ip•OLi :1(V) '/ d Z---- -7 X / / — \\/Zil 1 / via,VG)S1 13ft q. ZN / 0.17/ &Q faZ _ J _ -_� to oh£ ° ® YoS•2i =Q c-51t'zlb)tsa - r/ t•sz .y o./ _E _Ls? ,9S-£ $ r/xa mr/W cLI h *)51/ PQ HCH ORN PROJECT .175' 14,- 13 SHEET TI E- ENGICONSULTING NEERS LLC SUBJECT j/2 VIVA VI DATE 4- -1 BY PIA 1 x ILA 41.5 v,o; _clic' [36 /71 F- „•531 (s-\) z = 2,014 5;44: O 74' - La Cn. !aZ L�L Mr% . a 4= Er) SS. 1. o.Z.z 1 SF a4 • Z ,sa.2'?- (c i % ,' k t►4 .,.'L1.(A $ en l'n wit. aS2 nil, 4., a4t"iiZ �, v/2(�1, o`?S W, • 3 •D (fi-) . 3,014' , 4 * (rt— ,lbs..,ft 5;1410-- OS •(1.1w., itm I 4„03 t,„) vii 0. .pc-2.6,-01.4, .12 61Y t.0 4C('2• ZS celti 1 1 i b.WI 0 .F �S� gs �� i .�f� z --! \ r 0 .c`)(t.syi + 3.11-14s4 (c �4 •' "t2.� � - y --7s tb.s' / 3 Cz> . 3 2 i ? J ��.•t'O 2,•E M , :4,4.(0- .) (Fz - 1302 SW BERTHA BLVD. •PORTLAND, OR • 97219 PHONE: 503.892.5782 • EMAIL: DAVEQHORNCE.COM .TIC HORN PROJECT ,T5''/�/.-J3, • SHEET r7.E CONSULTING rz�{' DATE �I S ENGINEERS LLC SUBJECT ? ^� BY reyiI x 131 . L' I k w - o'ls k/i (SA/4 M N3� F.:. ons 66 II_ 0 5.3. ‘`' . . 5_ 18-st(a. -; Q. 0 v. r-Lio 7* CII p, lS . (}'t5 -i . 19.E '11n L 64., s•. .x 13 , . 0 Y 2. rti. "*/ -1145 k"--- EA k-Ar Z 32- L•iti Wot . giS(.Hsiw s.. 'a 010'7 1 t . 4 1 F 012. in d,\7 6.,. ..t. . �►L P4AP z ` 1 N. c)106-> 4. -7.g."'"-7e$ / ,1a1h. 1-0.0.M.‘1 ,...m...„ ....______ x gam, 41. i 71a60 -3 Z. c):211kt, 3Ztr . _ le 4 0re 7 14 ( >'z 14 z.. 4xt Z ,----y Z d Z,a l � 0,10;,..4.:111-4% �/ ; ,„icob Li b „ o.tb1 , � — n,L(-61•,o;z wz , • 13 . zit- its ,�..`�Zz(.i) _ ik • 3 3.9-r Zt 51: � In i 31�n , nazi . '1 0. 2^'9 :ri I L I302 SW BERTHA BLVD. • PORTLAND, OR• 97219 O �� PHONE: 503.892.5782 • EMAIL: DAVE@RORNCE.COM rIWUJECT________43A..1(r- 1 3. SHEETV3 C ONSUL TING �/ 7 11-.-6-- ENGINBBRS LLC SUBJECT DATE ` .2 � '''',�Nti BY DI 14 % 311 l'. 110) VY 4 . ‘4"7.1 it-1-4 ot.*oil.(46-+ . ts+C(41-1....) x4 °able!: 3.. it 4 -25 . to 1. g., aA., (toZ kap -a. , $',-3k' (E. # 12,,,e tlitla —'` 040 iCta� ' r 4 1351 G".•s• w s , .4.7.Ctt ir'� an , k 7 p4 V%4 Z ,ate t 7 j\ i . D • •3 C .b 6i) . 29 in I a s k/ ' k Z.i , .4.o xJ 1.- 915 w- . 646 (22Ssi. S t � z g Fe. ��s� ,3is I��C6-1, � � • , . 1,01i6 I . 4'44 �y •I . ,e+4'S �l � L � v • 5 le 1 ._ 7b 7.s I0 f 1,v-2. 41 °-4C�ti •t' al Cldt �iZ:1 �, • k 6 51 -t 81 2 a C61,13 3 L 35 ' CI.° =190 .1. , . x 1g_ &SD °° 2.4 . 1302 SW BERTHA BLVD. •PORTLAND, OR• 97219. PHONE: 503.892.5782 • EMAIL: DAVE@HORNCE.COM 'FORTE' MEMBER REPORT Level,Floor:Joist F' PASSED • 1 piece(s) 11 7/8"TJT®560 @ 16" OC • Overall Length:22'T' TF -3t}+r 4k,�$ � ,7•4 y� "t�S€` '11IP"'" r, '� 2Fyfi`LE X04�,.t L,s,„4, ""', Hv:z.f04 Alq rex, 1• 2 r r 20 All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Yk �R �a$� � y, Y{ �R ° n �rw1 ,.�L�^i t. �whwa 5trtyl l ck System:Floor Member Reaction(lbs) 685 @ 22'4 1/2" 1396(2.25") Passed(49%) 1.00 1.0 D+1.0 L(Alt Spans) member Type:]Dist Shear(lbs) 672 @ 22'3 1/2" 2050 Passed(33%) 1.00 1.0 0+1.0 L(Alt Spans) Building Use:Residential Moment(Ft-lbs) 3317 @ 12'7 1/8" 9500 Passed(35%) 1.00 1.0 D+1.0 L(Alt Spans) Building Code:IBC Live Load Defl.(in) 0.321 @ 12'3 1/8" 0.506 Passed(L/757) — 1.0 D+1.0 L(Alt Spans) Design Methodology:ASD Total Load Dell.(In) 0.388 @ 12'4 1/2" 1.011 Passed(L/625) — 1.0 D+1.0 L(Alt Spans) T3-ProTM Rating 43 40 Passed -- • •Deflection criteria:L1.0./480)and T1.(1.1240). •Overhang deflection criteria:LL(21/480)and TL(21/240). •Bracing(Lu):All compression edges(top and bottom)must be braced at 8'5 3/8"o/c unless detailed otherwise.Proper attachment and positioning of lateral bracing is required to achieve member stability. •A structural analysis of the deck has not been performed. •Deflection analysis Is based on composite action with a single layer of 23/32"Weyerhaeuser Edge"'Panel(24"Span Rating)that is glued and naifed down. •Additional considerations for the D-Pro""Rating Include:None r. 1� n ��..�q i 1LG'LlA "4.k7i3 1 � j C 1-Stud wall-DF 3.50" 330" 3.50" 419 560 37 1116 Blocking 2-Stud wall-DF 3.50" 2.25" 1.75" 142 551/-1 -4 693/-5 1 1/4"Rim Board •Rim Board Is assumed to carry all loads applied directly above 14 bypassing the member being designed. •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. �. r .,,sem,.,..,..-�i a.:. y i �^ 'k " c.0 � ' Y� E t 6 p S,„; 1-Uniform(PSF) 0 to 22'7" 16" 12.0 40.0 - Residential-Living Areas 2-Point(PLF) 0 16• 150.0 - 25.0 (=z;�',"`-�� �,1-ti�"x�,�'r-.,Fs�santw..4���a€�-`'���`' '�� �� i�'��d ' ;ti srt''�"� ; , '° �t�ro{ '�� y� FORESTRY ..< {8)SUS7AINABLE' RESTRYINmA71VE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design atteria and published design values. `f' Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com)Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Use of this software is not intended to circumvent the need fora design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. The product application,input design loads,dimensions and support information have been provided by Forte Software Operator • FdrlteA'c reEperator'::. .,;:: .,:'.:::, - .. -. Job Notes 4/28/201512:40:32 PM David HornForte v4.5,Design Engine:V6.1.1.5 Horn Conslulting Engineers (503)892-5782 dave@homoe.com ' Page 1 of 1 FO R T E w MEMBER REPORT Level,Copy of Floor:Joist PASSED 1 piece(s) 11 7/8"TM®360 @ 16" OC Overall Length:18'7" • 3 S`•f�'y 1-•a Oki r� ' a:)Yg ? �`� �W3 „� � j����� ����� �i,i•p. .v.�'-'r"`.�'✓'`°�'��`' x,� 0 . h�::c, •s....�a�w 'cam .... -' �,..w a "c�"' '�'•" est• <��°"moi 18'., 0 0 All locations are measured from the outside face of left support(or left cantilever end).Alt dimensions are horizontal. r"T,,k, "Y i7-I l JL4 -, ..51:AS. Uhl i,:l,' :,}72:is, it ' 7.1. .c.F:-;:grd-+cx-v.z7�"c. 31i�1`r s::-14 system:Floor Member Reaction abs) 627 @ 3 1/2" 1080(1.75") Passed(58%) 1.00 1.0 D+1.0 L(All Spans) . Member Type:301st Shear(Ibs) 627 @ 3 1/2" 1705 Passed(37%) 1.00 1.0 D+1.0 L(Ail Spans) Building use:Residential Moment(Ft-lbs) 2834 @ 9'4" 6180 Passed(46%) 1.00 1.0 D+1.0 L(All Spans) Building Code:IBC Live Load Deft.(In) 0.297 @ 9'4" 0.452 Passed(L/730) -- 1.0 D+1.0 L(All Spans) Design Methodology:ASD Total Load Defl.(in) 0.387 @ 9'4" 0.904 Passed([/561) -- 1.0 D+1.0 L(Ail Spans) -13-Prom Rating 42 40 Passed -. •Deflection criteria:LI.([/480)and 11.(L/240). •Bracing(Lu):All compression edges(top and bottom)must be braced at 4'10 7/16"o/c unless detailed otherwise.Proper attachment and positioning of lateral bracing Is required to achieve member stability. •A structural analysis of the deck has not been performed. •Deflection analysis is based on composite action with a single layer of 23/32"Weyerhaeuser Edge*"Panel(24"Span Rating)that Is glued and nailed down. •Additional considerations for the T3-Pro'"Rating include:None uru7 �,� � ti�--i' da$ Th €` [ ` �' 3 1� ' !4y' g •'�' '{�'i� f=� `7h �[�s f` +'� � , �' . - i ha !'...:...........d.,,` _ 1-Hanger on 117/8"DF beam 3.50" Hangers 1.75" 349 498 33 880 See notes 2-Stud wall-DF 3.50" 2.25" 1.75" 148 493 - 641 1 1/4"Rim Board •Rim Board Is assumed to carry all loads applied directly above it,bypassing the member being designed. •At hanger supports,the Total Bearing dimension is equal to the width of the material that is supporting the hanger •r See Connector grid below for additional information and/or requirements. ( .^,'}i i°'' J,: ��{ ) s }r•�^�' :�!��'�'�����,.v ,ate.^'..t y �+�i�..��.,�..�-'��'K >a-��.L�-r,?:� `�r r 3 '' I.�._n.... +i� l.a:.:an _a xa.;.r xr__., " „;:7'd-°111..-1-7,,-7::'�s< a 4 }� t rex � 3 S 1 �.�q- v ; w iii " k.- a , �...L ��51 :h � �Y_ . .,CcA is,���..._w�. �z,X 1-Face Mount Hanger 1US2.37/11.88 2.00" N/A 10-10d x 1-1/2 N/A 1-Uniform(P8F) 0 to 18'7" 16" 12.0 40.0 _ 2-Point(PLF) 0 16" 150.0 25.0 "°�t7 �ji '9 ,i ,�- a > ,.�S.. .. nr 7'S- ^a, :. L it ...` ,,,, ,,' a � t x ti 1 s �y lf.,�'.".�-8�o- ' /� �z�r u -_P a�f ;'.�rx # I y, �, M it �..�hw ` "•� {2;T)SUSTAIWABCE FORKtRY INtFG4TIVE Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. �" Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com)Accessories(Rim Board,Bloddng Panels and Squash Blocks)are not designed by this software.Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer Is responsible to assure that this calculation Is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. The product application,Input design toads,dimensions and support information have been provided by Forte Software Operator 4/28/201512:41:49 PM David Horn Forte v4.5,Design Engine:V6.1.1.5 Horn Consluiting Engineers (503)892-5782 deve@hornce.com _._..._....------•- Page 1 of 1 '" FORTE* MEMBER REPORT Level,Copy of Copy of Floor:Joist f'(D PASSED 1. piece(s) 11 7/8" TM® 210 @ 16" OC Overall Length:28'10 1/2" ` jAN, - e 4 t '1 Jx J+ , ' ARK4ire f • �o-� 5 a ke xrr <� ,..,;_.-",-4'=.4,-, l , p 0 - -X 4' - P • Is ...- ..._s z.. I- i1' '�X 17. • 4 4. Q . El a All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. a n "{ ca . ,. S '; lY F il: -QVat; 'c_,a), 4 iafi: C ?as--:4,1.....::::,:: System:Floor Member Reaction(lbs) 1277 @ 11'5 1/4" 2145(3.50") Passed(60%) _1.00 1.0 D+1.0 L.(All Spans) Member Type:Joist Shear(lbs) 673 @ 11'7" 1821 Passed(37%) 1.00 1.0 D+1.0 L(All Spans) Building Use:Residential Moment(Ft-Ibs) -1985 @ 11'5 1/4" 3795 Passed(52%) 1.00 1.0 D+1.0 L(All Spans) Building Code:IBC Live Load Deft.(in) 0.210 @ 20'7 15/16" 0.431 Passed 1./984) -- 1.0 D+1.0 L(Alt Spans) Design Methodology:ASD Total Load Defl.(In) 0.265 @ 20'8 5/8" ' 0.861 Passed(L/779) -- 1.0 D+1.0 L(Alt Spans) TJ-Prom Rating 44 40 Passed -- -•Deflection criteria:U.(11480)and Ti.(/240). •Bracing(Lu):All compression edges(top and bottom)must be braced at 4'6 5/16"%unless detailed otherwise.Proper attachment and positioning of lateral bracing is required to achieve member stability. •A structural analysis of the deck has not been performed. •Deflection analysts is based on composite action with a single layer of 23/32"Weyerhaeuser Edge•"Panel(24"Span Rating)that is glued and naffed down. •Additional considerations for the 13-Pro'^Rating Include:None ‘.3.`-"'..,:;717-`,f'' � f i `�i_f5. erg -s� Z T 7'a�4TI d [y , ?:,,i.,1--4-1,„: . � � s a !"" � '� "� � � t fi4wy'i�ys; � 9 iJ� ' ,6d " _ t A ;.f d :t � • • 1-Hanger on 117/8"DF beam 3.50" Hangers 1.75" 253 284/-92 33 570/-92 See note 1 2-Stud wall-DF 3.50" 3.50" 3.50" 295 982 - 1277 None 3-Stud wall-DF 3.50" 2.25" 1.75' 115 401/-13 - 516/-13 1 1/4"Rim Board •Rim Board is assumed to cany all loads applied directly above it bypassing the member being designed. •At hanger supports,the Total Bearing dimension is equal to the width of the material that is supporting the hanger •1 Se..-e connector grid below for additional information and/or requirements. -u. _- `• ;.1ci r1.. .;.1:..h. :'N '-74V11',73147:- M;.`::1 :a - '. {:�G:j -h ', 'J el ,1' 4 - ° ` Yh7Y-u) � b, c . i.,!e_,,,,,,,,,- .1y'lrF! :. 3SN raC.!! - :9!'� . Cy .l- s .. e � ? X "k ', ;rVr:larliBei+r� r i� ,- ,74;,.s...;::::,-4 F" :75 1-Face Mount Hanger IUS2.06/11.88 2.00" N/A 10-10d x 1-1/2 N/A �, �""hqjyrt�ITh .7,7;7,, s� ` - �) �' ' ,.. vs w fi �,,, .;-:!,,,..F4...45 v+,„ ---�[1 c`: 41. . `r.,'",11,,L-1-k7; a �� a r, -f,*i ';'l5 . jn7r 1-Uniform(P89 0 to 28'10 1/2" 16" 12.0 40.0 - Egiillin 2-Point(PLF) 0 16" 150.0 - 25.0 �- A .1 -ti? t Rb3 4t ,�a " `ll� ,-.41;-,ti . , oy ,. , F"; Va i'ti ;: i 'i k . /� - .o-7 W xz � � -�rv��r�'`'"'-' �SUSTAINABLE FORESTITYINRUITIVE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. ����ttt" Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com)Arrossories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer Is responsible to assure that this calculation is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. The product application,input design loads,dimensions and support Information have been provided by Forte Software Operator Odtte!oftwate QperatoF ' .-‘ Job Notes. 4/28/2015 12:43:19 PM David Horn Forte v4.5,Design Engine:V6.1.1.5 HornConslulting Engineers (503)8925782 JTS 15 11.4te dave@homce.com __ Page 1 of 1 • i RPRoaccr . HCHON yrs- SHEET• — CONSULTING DAV 'V'E 10.11. of E ENGINEERS LLC Slam= ItAMIN. I • BY; ,a?+i CZA wL Space f,�4 My,l,, . Y8' 1.1-1,, PG! oft { • S•,u 5' . 80.4. TrIo STAR Ls•io.ou , • 5 w= fis + +øJ & u o.13ye d.t3 (f•1,.`. o.41,-;)•P'' • Mo. 4:1•.I /8 j. I . 44 8 A ��*Z .,.__._. • $14, `s . J.+ u123 222;03 . `�► 54.8 .E . ry4410. i • • 11”). .6-..ierlf P.; 1 s.3‘t • • • 1.33/Ls a.t1 ,$ L.M, . ftjh 4-- • • 4iv4 - &rt , . • s•ss 4k44 a sfkit i5 • • • • • • • • I • • 13.02 SW WAWA BLVD. •PORTLAND,OR.97219 • PHONE: 503.$92.5782 • BMAIL:,DAVE-NCB@QWESTOFFIC6.NET HC HORN PROJECT 3TS-I'V-I SHEET I p0 — CONSULTING DATE c{.Zis E ENGINEERS LLC SUBJECT '�2AM%NCI BY D3 H . )! A1" A► 3 ;AF ►M^ .AIL Vw11-si GAST . Z4HE17, ,-]L"7 k �+(3 ' � ic- v. L .= 1.3.1 -. a. 91 (t - 1, 0 4K ett> � . ,� 2 r a r cor I grl. t'. e,t1/ 6 ) -= 2; )k - t.s.'fig- ve ht `_i IS ------. Y � � L1.I" by •Z► 4C E2lizi +,o.)-Z-.(1\ ', DC Z ' Q _ • 3 P, d �5 )b-.1.- z ' s - GL 3J- 111/4 9,t + 1' % I , f . k • C� Z /° eam Ohl. 1302 SW BERTHA BLVD. • PORTLAND, OR • 97219 PHONE: 503.892.5782 • EMAIL: DAVE(1IIORNCE.COM 14,_CHORN PROJECT ,'r'5—1(%. - /3 SHEET RI+4 CONSULTING • DATE 4--le-ts- ENGINEERS LLC SUBJECT Taa1iNvS BY pol �, �k ��� _ �,,� --rs 30 1 �7,`` !.«.t, fill a P vr/ 3 - tilt's u—A Y G�>✓��, -rites -�� z = ��,��` s k,C14414 /14- ,y)1.11 14- el lot G r2 3-114's \ Ar y'�/ $t �'' 3.3 ���d� = �a.1 k- Z• 4 13.3 TttTt X\�.„ 6M• 3,X4,5 L-Ar • 1302.SW BERTHA BLVD. • PORTLAND, OR • 97219 PHONE: 503.892.5782 - EMAIL: DAVE@HORNCE.COM