Loading...
Plans (70) Om � C V. V O C I m < z z- s. r- 2 2 0 v. — m oW oZ a z z «- .5 = * 1 1 s 4.a m �i a o co Et z 0, 81'4" ,.-r -r g 8'r .4 46'- 1112" k 6'-111@" �' '''''''T' • 1 - a H Fuss' 044 314, N y r_ y ESm a o o o O E N - Ili SII N a AM I � � r N U s Nre . reify ii,i kJ_ < N1811 . rog 1 3 a. v2iiiigz2i td,_ o gA _ b c gZ= � as 25, 0 CO 6g6PZ -n1 €11 Z -C...'. rileAWF,"' o NI r 8 6-, cr W\ a 2' .ol fit v. I � 62441/ .ww A E4 > , v Vsi cr mil .bom1 .aro <w►t 1 70 , ztn5 I 2T-71/2" I2'-11"I 18'-$" R'-111Q" t/f „�. 81'x" CONFORMS TO DESIGN CCNCEPT e 0 CONFORMS TO DESIGN CONCEPT E CONFORMS TO DESIGN CONCEPT WITH g REVISIONS AS SHOWN IM 9 -.. ^ ri CONFORMS TA DESIGN CONCEPT WITH REVISIONS NOTED ❑ NON-CONFORMING-REVISE AND RESUBMIT ❑ NON-CONFORMING-REVISE&RESUBMIT THIS SHOP DRAWING HAS BEEN REVIEWED FOR GENERAL CONFORMANCE n 9 3 THIS SHOP DRAWING HAS BEEN REVIEWED FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE WITH DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE FABRICATOR/VENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH THE Cr U FABRICATORNENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH DESIGN DRAWINGSSPECIFICATIONS,AND APPLICABDESIGN DRAWINGS AND SPECIFICATIONS ALL OF WHICH HAVE PRIORITY , LE CODESALL OF WHICH HAVE, OVER THIS SHOP DRAWING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS. y: gP PRIORITY OVER THIS SHOP DRAWING, Z CID By Alexia Fukui Date 11/20/14 By: Todd R. Eatoq Date: November 20. 2014 MILBRANDT ARCHITECTS CT ENGINEERING INC V V -aC e < Z Z -'' 1 < '" 2 2~ c) • V , XRI0 O i W v Z XI a = 1 4 2. y I" 5'_3' I 2T-7 112' I2'-11'I 181-8" I 8'-11112' 1 � kr CI 3 g 1 ,- D1 C. + A N ' 9 -- (2, -— t2 / i • toto c" m ii • - N • _ E3 (8)� zi O w w sii I: -�� N N /4// ..X / / \ r%14 ? R ug 13 N a s 5Wi gi i al i'_iR� E E2 (4) RI 133 N asN 11111111/1161 El , c 8'2' I 46'-11/r _I 8'-1111 ' a II 811-3' 1 P iii: El CONFORMS TO DESIGN CONCEPT T pX CONFORMS TO DESIGN CONCEPT fl CONFORMS TO DESIGN CONCEPT WITH 0CONFORMS TO DESIGN CONCEPT WITH REVISIONS AS SHOWN P " REVISIONS NOTED I. 0 NON-CONFORMING-REVISE&RESUBMIT 0 NON-CONFORMING-REVISE AND RESUBMIT 3 THIS SHOP DRAWING HAS BEEN REVIEWED FOR GENERAL CONFORMANCE THIS SHOP DRAWING HAS BEEN REVIEWED FOR GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE WITH THE DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE nFABRICATORNENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH DESIGN FABRICATOR/VENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH THE Q. DRAWINGS,SPECIFICATIONS,AND APPLICABLE CODES.ALL OF WHICH HAVEar -1 PRIORITY OVER THIS SHOP DRAWING. DESIGN DRAWINGS AND SPECIFICATIONS ALL OF WHICH HAVE PRIORITY -o. 1_ By Alexia Fukul Date 11/20/14 OVER THIS SHOP DRAWING. CONTRACTOR SHALL VERIFY ALL DIMENSIONS. zMILBRANDT ARCHITECTS By: Todd R. Eaton Date: November 20, 2014 - 1 CT ENGINEERING INC 11111111111 LUMBER SPECIFICATIONS TRUSS SPAN 18'• 6.5" TC: 2x4 KDOF M1&BTR LOAD DURATION INCREASE = "15 ICOND 2: Design checked for n t( paf)uolift at 24 oc specte I BC: 2x4 KDDF k1&BTflSPACED 24,0. O.C. DESIGN ASSUMES MOISTURE CONTENT DOES TC LATERAL SUPPORT <= 12'OC. UON. LOADING NOT EXCEED 194 AT TIME OF MANUFACTURE, sting BC LATERAL SUPPORT <= 12'0C. UON. LL( 25,0)+DL( 7.0) ON TOP CHORD = 32.0 PSF Design conforms to main andwcladding criteria Connector plate prefix designators: DL ON BOTTOM CHORD = 10.0 PSF system and components cladding criteria. Connect8,CN18 ((or no prefix) = CompuTrus, Inc TOTAL LOAD = 42.0 PSF M,M20HS,M18HS,1(or = Mek MT series Wind: 140 mph, h=21,2ft, TCDL=4,2,BCDL=6,0, ASCE 7.10 LL =25 PSF Ground Snow (Pg) (All Heights), Enclosed Cat.2, Exp.B, MWFRS(D{r), ads LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL olid duration factoring REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. Truss dpleneeofd ftheor wtrusioonl . in the y BAND OTTOM CHORDTOM CHECKEDORD FOR 1DPSF DS ACTLIVE NONLOAD. TOP CONCURRENTLY. Gable end truss on continuous bearing wall UON. M-1x2 or equal typical at stud verticals. Refer to CompuTrus gable end detail for complete specifications. 12 8-03-04 8-03-04 I 6.00 17 HM-4x4 12 Q 6,00 WHEN A FLAT BOTTOM CHORD GABLE TRUSS SUPPORTED ON TOP OF A 1 I BEARING WALL SETS NEXT TO SCISSOR TYPE TRUSS(ES), A HINGE TYPE CONNECTION WILL BE CREATED BETWEEN THE TOP PLATE OF THE BEARING WALL AND THE BOTTOM CHORD OF THE GABLE TRUSS. THIS IS DUE TO THE LACK OF THE LATERAL BRACING PROVIDED BY RIGID CEILING AT THE HINGE TYPE CONNECTION POINT. THE TRUSS DESIGNER ASSUMES NO RESPONSIBILITY FOR THE M DESIGN OF THE LATERAL BRACING TO THE HINGE CONNECTION r. SITUATION, COMPETENT PROFESSIONAL ADVICE MUST BE OBTAIN t Li) RELATIVE TO THE DESIGN OF THE ADEQUATE LATERAL Q BRACING TO THE HINGE TYPE CONNECTION. a m 0) 4 co o O EN OO � ' 1 I/// 0 //////L//J///////////L////////////////////////!//////////!/////////////////////////////////////////////!///////! c O M-3x4 y y M-3x4 1-00 16-06-08 J, i' 1-00 JOB NAME: POLYGON NW PLAN 7-B NH - Al ��a�° PRO��s Scale: 0.4872 ir ��c`5 °�7/Z/R s/c) WARNINGS: OENERAL NOTES,unless otherwise noted: !92 P E -' Af Truss: A 1 1.Builder end erection contractor should be advised of as General Notes 1.This design Is based only upon the parameters shown and Is for an individual �/ and Warnings before construction commences, building component.Applicability of design parameters and proper • 2.2x4 compression web bracing must be Installed where shown+• Incorporation of component Is the responsibility of the building designer. DES. BY: BS 3.Additional temporary bracing to Insure stabilityduty g construction 2•Design assumes the top and bottom chords to be laterally braced at // ' Is the responsibility of the erector.Additional permanent bracing of 2'o.abraced and at 10•o.o,respectively unless throughout their length by �� DATE: 9/12/2014 the overall structure is the responsibility of the building designer. Impact sheathingnor such as cingoehead where shownwdrywap(BC), yL OREGON� � 4.No bed should be applied to any3.2x continuous of truss or lateral bracing required where ++ SEQ. : 605 9056 PW component unlit after as bracing and 4.Installation of is the responsibility of the respective contractor. L4. fasteners are complete and at no are should any loads greater than 5.Design assumes trusses are to be used Inc noncorrosive environment, ��. i" 14. 2� IP. TRANS 'ID: 408071 design leads be applied to any component and are for"dry condition"of use. ii 5.CompuTrus has no control over and assumes no reaponaibialy for the 0,Desigassumes s umes full bearing at as suppIs orts shown.Shim or wedge If dI R n I O- V n of S.This fabrication, is furnished subject to the limitations set forthorbyle 5.Design hal be locatedcedon both drainage of truss,end pieced so their center r'1 r1 I IIIIII 11111111111111111 lines joint center Ones. 0111 111 IIII IIII MiTTek USA,Inc./CompuTrus s Softw re 7.6.6(1 L)-E request 1g.0.Fo bcoincodewitprpialedesign values see ESR-1311,ESR-1555(MINS) EXPIRES:12/31/2015 This design prepared from computer input by Ell PACIFIC LUMBER-BC TRUSS SPAN 16'- 6.5' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 LUMBERSPECIFICATIONSKDD1613TRLOAD DURATION INCREASE = 1.15 1. 2 0) 8- 8='-378) 1540 3-1540 8- Bo(.326) 934 TC: 309 2x4 KDDF 1/16BTR SPACED 24.0' 0.C. 2- 3 -1751` 8- 4= -121 934 BE: 2x4 KDDF S1ANDfl 3- 4= -1351 288 WEBS: 2x4 KDDF STAND LOADING 4- 5= •135 256 5. 8= -1751 502 IC LATERAL SUPPORT <= 12'0C. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 6- 6= 0 50 L ON BOTTOM CHORD = 10.0 PSF BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF OVERHANGS: 12.0' 12.0" LL = 25 PSF Ground Snow (Pg) BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZE MIN. (SPECIES) Connector plate prefix efixgnators: LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 0'- 0.0' -125/ 809V -82/ 82H 5.50' 1.29 KDDF ( 625) M M2OHS,MIB 8 (or no priTefiM) = riepuTrus, Inc 16'- 6.5' -125/ 809V 0/ OH 5.50' 1.29 KDDF ( 625) M,g20HS,M13HS,N18 =MiTek M series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP huh ' r 'h ,' '` .. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL MAX ELL DEFL = •0.075 ' @ 8'• 3.2' Allowed = 0.781' MAX TLMAXELL DEFL = 0.002' @ 17'- 6.5' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ 17'- 8.5' Allowed = 0.133' MAX HORIZ. LL DEFL = 0.059' @ 16'. 1.0' 8-03-04 8-03-04 T MAX HORIZ. TL DEFL = 0.091' @ 16'- 1.0' T DESIGN ASSUMES MOISTURE CONTENT DOES 4-04-11 3-10-09 3-10-09 4-04 11 T NOT EXCEED 19'1 AT TIME OF MANUFACTURE. T 12 Design conforms to main windforce•resisting 12 M-4X6 Q 6.00 system and components and cladding criteria. 6.00 4 4.0" Wind: 140 mph, hn21.2ft,.TCDL=4.2,BCDL=8.0, ASCE 7-10 All Heghts), Enclosed Cat.2, Exp.B, MWFRS(Dir), f load duration factor=1 � Trues designed for wind loads in the plane of the truss only. M-1.5x3llillill , M 1.5x3 I U, !�_ gi c , e 4 M-5x8 oM 3x4 M-3x4 cm C.,., 0o /-- /- o 1 0 3.00-. 12 3.00 12 12 y J, y y y 1-00 8-03-04 8-03-04 1-00y y y 16-06.08 1-00 1-00 R&D y PR04 Scale: 0.3206 �+ fizf/ ��# JOB NAME: POLYGON NW PLAN 7-B NH - A2111i�],111 WARPING!): GENERAL NOTES,unless of henvise noted: ,7 0 P E 1.Builder and erection contractor should be advised of al General Notes 1.This s��gun ibased°mponent�uuppon of e parameters a paran metersand orr an Individual and Warnings before bride construction be installed axle. Incorporation of component Is the responsibility of the building designer. Truss: A2 2.2x4 compression web bracing must be instaMd where shown+, 2.Design assumes the top end hues xn chords b be lebre1N braced at 3.Addllonat temporary bracing to Insure stability during construction 2'o.c.end at 10'0.0.respedWely untees Meced lhrou0hoot tMlr len�th by ,;."•�" DES. BY: BS lathe responsidwy of the erector.Additional permanent bracing of continuous sheathing such as plywood sheathing(TC)and/or drywaI(SC). +► tr the overall structure is the responsidlty of the building designer. 3.2x Impact bridging or lateral bradng required where shown++ •y OREGON A. DATE: 9/12/2014 4.No bad should be applied to any component anal after al bracing and s:Installation°`nom laathe responsibility tned ill: morespectivWw�ntractnm.nt. '/O �l 14 2.C1 tt�4,� SEQ. : 6059057 fasteners ere applied and at°°Imo�OUb any bads greater than and aro br'dry condition"of use. i5 design loads be appled to any component. 6.Design assumes full bearing at at supports shown.Shim o r wedge if I'rJ •� ti�� TRANS I D: 408071 5.C loads hes no control over and component assumes no responsibility the necessary. 6.This design furnished subject tfabrication,handing,shipment o the Imitation set installation of fourth by O.ponents. 7.Plates shalln assumes be located adequa te h s of trusprovids, placed an their center 11E1 111111111111111111111111111111111 MITcIPI Slnlnc.CompuTtwiSvAllbe furnished 10.Digits ForbealepnnectorplebAaig ~es see ESR-1311,ESR-1956Wei) EXPIRES:12/31/2015 This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 28'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDFICq=1.00 TC: 2x4 KDDF #1&BTR LOAD DURATION INCREASE = 1.15 1- 2= 0) 50 2.10= -251 92 10- 3= -12) 169 BC: 2x4 KDDF #1&BTR SPACED 24.0. O.C. 2- 3= 69 347 10.11= -255 90 3.11= -470 164 WEBS: 2x4 KDDF STAND 3- 4= -146) 779 11.12= -682 251 4.11= -1145) 248 LOADING 4- 5=( -74) 220 12.13= -48 472 4.12= 95 806 TC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 6=( -85) 246 13- 8= -241 848 5.12= -361 143 BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 6- 7.(-566) 90 12- 6= -765) 194 TOTAL LOAD = 42.0 PSF 7. 8='-980) 274 6.13= 0 450 OVERHANGS: 12.0' 12.0' 8. 9=( 0) 50 13- 7= -346 219 LL = 25 PSF Ground Snow (Pg) M-1.5x4 or equal at non-structural vertical members (uon). LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA plate desi nators: REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES C Connector8,CN18 (or prefixno pdesi9) = ConpuTrus, Inc 0'- 0,0" -61/ 213V -135/ 135H 119.00' 0.34 KDDF 625 C,CN,C18,C18,(or n MiTek xT series BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 5'- 1.0" -72/ 109V 0/ OH 119.00' 0.17 KDDF 625 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 9'- 11.0' -231/ 1605V 0/ OH 119.00' 2.57 KDDF 625 26'- 0.0' -109/ 613V 0/ OH 5,50' 0.98 KDDF 625 Refer to ConpuTrus standard gable end detail for complete ICOND. 2: Design checked for net(-5 psfl uplift at 24 "cc spacing.' specifications. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003" @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.036' @ 21'- 8.1' Allowed = 0.781• MAX TL CREEP DEFL = -0.065' @ 17'- 8.8' Allowed = 1.042' 13-00 13-00 MAX LL DEFL = 0.002' @ 27'- 0.0' Allowed = 0.100" 5-02-12 4-08-04 3-01 4-07 4-00-05 4-04-11 MAX TL CREEP DEFL = -0.003' @ 27'- 0.0' Allowed = 0.133' MAX HORIZ. LL DEFL = 0.021' @ 25'- 8.5' MAX HORIZ. TL DEFL = 0,034' @ 25'- 6.5' IIM-4x4 DESIGN ASSUMES MOISTURE CONTENT DOES M-3x5 NOT EXCEED 196 AT TIME OF MANUFACTURE. 12 M-1.5x4 5 4, sM-3x5 6.00 M-3X5 'S16.00 12 Design conforms to main windforce-resisting M-3x4 M-1.5x4 Q 6.00 system and components and cladding criteria. M-3-3x5x4 Wind: 140 mphh=22.4ft, TCDL=4.2,BCDL=8.0, ASCE 7-10 yr M (A11 Heights), Enclosed, Cat.2, Exp,B, MWFRS(Dir), load duration factor=l.6 co Truss designed for wind loads 0 M-3x6 in the plane of the truss only. 3441111111 M-1.5x3 M-2.5x4 or equal at non-structural diagonal inlets. 11 1111111111111111k4Truss designed for 4x2 outlookers. 2x4 let-ins �� a� of the same size and rade as structural top 0 3 chord. Insure tight fit at each end of let-in, r c M-5x6 M-3X4 c permissiblemust inletcut boardwith areas only. •-T/- 3 I -- B M-3x8 3 C M-1105x3 11 o M-3x4 M-5x10 -.33.00 3.00 - 12 12 J• l y )' 1, 9-11 3-01 4-08-12 8-03-04 J. /. ), 1. y 1, 1-00 9-11 7-09-12 8-03-04 1-00 J. y 1-00 26-00 1-00 0.0 PR Dicer, 'X JOB NAME : POLYGON NW PLAN 7-B NH - B1 Scale: 0.2140 �5G(Niu, s, WARNINGS: GENERAL NOTES,unless otherwise noted: kr /Zit "f1,�; B1 1.Builder and erection contractor should be advised of all General Notes 1.This design is based only upon the parameters shown and Is for an Individual 4t' 7,7G•'P E Truss: B 1 and Warnings before construction commence. building component.Applicability of design parameters end proper �// 2.2x4 compression web bradng must be Installed where shown+. Incorporation of component Is the responsibility of the building designer. '' 3.Additional temporary bracing to inure stability during construction2.Design assumes the top end bottom chords to be laterally braced at DES. BY: B$ Is ere responsibility of the erector.Additional permanent bracing of 2'o.c.and at 10'o.c.respectivelyunless braced throughout their length by �,,1111.4. DATE: 9/12/2014 the overall structure is the rasponeibimy of the building designer. continuous sheathing such as plywood sheatwng(TC)and/or drywaNSC). /�`a ' 3.2x Impact bridging or Mend bradng required where shown++ Q 4.No load should be applied to any component until after all bracing end 4.Installation of truss Is the responsibility � of the respective contractor. OREGON ti bads greater than 5.Design assumes trusses are to be used In a non-corrosive environment, 4". design loads beSEQ. : 6059058 fasteners are complete and at no time should any applied to any component 5.ConpuTrus has no control over and assume no responsibility for the and are for"dry condition"of use. 4., 8.Design assumes full bearing at ail supports shown.Shim or wedge If V '�J� 1 4 2,0� K�� TRANS I D: 408071 fabrication,handling,shipment and Installation of components. 7.Design assumes adequate drainage Is provided. R �. IIIIII)IIII)IIII VIII VIIIIII)NII III IIII �' 8.This design is furnished subject to the Imitaaora set forth by 8.Plates shall be located on both faces of truss,and placed so their center TPIM/TCA In BCS),copies of which will be furnished upon request tinea coincide with joint center lines. 8,Digits indicate size of plate In Inches. MITek USA,Ina/Com uTrua Software 7.8.8(1 L}E 10.For basic connector pate design values sea ESR-1311,ESR-1988(MRek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 26'• 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF 018BTR LOAD DURATION INCREASE = 1.15 1- 2= 0 50 2-10= •247 1594 10- 3= 0 228 BC: 2x4 KDDF ®16BTR SPACED 24.0' O.C. 2- 3= •1886 361 10-11.(-249) 1591 3.11= -378 107 WEBS: 2x4 KDDF STAND 3- 4= -1479 959 11.12= -171) 1308 4-11= -85 78 LOADING 4- 5= -1343 362 12.13= -436 2628 4.12= -183 151 TO LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -1388 348 13- 8= -618) 2784 5.12e -207 953 BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 8- 7= -2948 590 12- 8= -1728 395 TOTAL LOAD = 42.0 PSF 7- 8= -3145 715 6-13=) •191) 1428 : OVERHANGS12.0' 12.0' B- 9= 0) 50 13- 7=( •104) 165 LL = 25 PSF Ground Snow (Pg) Connector plate prefix desi nators: C,CN,C18,CN18 (or no prefix = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL BEARING MAX VERT MAX HORZ BOG REQUIRED BOG AREA M,M2OHS,M18HS,M16 = MiTek M series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES 0'- 0.0' -179/ 1208V -134/ 134H 5.50' 1.93 KDDF 625 BOTTOM CHORD CHECKED FOR IOPSF LIVE LOAD. TOP 26'- 0.0' -179/ 1206V 0/ OH 5.50' 1.93 KDDF 825 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. ICOND 2' Design checked for net(-F oaf) uplift at 24 'oc spacing.) VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.170" @ 17'- 8.8' Allowed = 1.254' MAX TL CREEP DEFL = -0.335' @ 17'- 8.8' Allowed = 1.872' MAX LL DEFL = 0.002" @ 27'- 0.0" Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ 27'• 0.0' Allowed = 0.133' 13-00 13-00 ,' MAX HORIZ. LL DEFL = 0.098' @ 25'• 6.5' 5-02-12 4-08-04 3 01 4.07 4.00-05 4-04-11 MAX HORIZ. TL DEFL = 0.162' @ 25'- 8.5' T T f '1 T '( '( DESIGN ASSUMES MOISTURE CONTENT DOES 12 12 NOT EXCEED 19%AT TIME OF MANUFACTURE. 6.0017 M-4x6 Q 6.00 Design conforms to main windforce•reaiating 4.0" system and components and cladding criteria. 5 Wind: 140 mph h=22.4ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 (All Heights), Enclosed Cat.2, Exp.B, MWFRS(D�r), M-3X4 load duration factor=1.� M-3x6 Truss designed for wind loads 440.1% in the plane of the truss only. M '' 0 , -- M-3x 3 M•1.5x3 ro441 �f 3 o M1- x6 =M-4x4 c� x� �` 0 f- f o 1 1u 'y' M-3x10 4 o M-3x4 M-1.5x3 M-5x10 c --, 13.00 3.00ta 12 12 y 5-01 y 4-10 y 3-01 y 4-08-12 y 8-03-04 y 1-00 9-11 7-09-12 8-03-04 1-00 /' y y y 1-00 26-00 1-00 JOB NAME: POLYGON NW PLAN 7-B NH - 62 Scale: 0,2,49 `.��� 4 P" ���`g/oA_ WARNINGS: GENERAL NOTES,unless otherwise noted: nn rrr111/Z/T 44 y� 1.Bidder end erection contrador should be advised of d General Notes 1.Ns design Is based only upon the parameters shown and Is for en Indlvlduo 4' •P E fy B2 end Wemings before construction commences. building component.Applicability of design parameters and proper J,.,. Truss: incorporation of component is the neponsldlty of the building designer.2.2x4 compression web bradng must be installed where shown+. 2.Design assumes the top and bottom chords to be laterally braced et 3.Addmlonei temporary bradng to Insure ei dmy during construction 2 o.c.and at 10'o.o.respectively unless braced throughout their ler qgthtln by ,/:� �' DES. BY: BS isms responsibility of the erector.Additional permanent bradng of continuous sheathing such as plywood sheathing(TC)and/or drywall(BC). Cr DATE: 9/12/2014 the overall sbudure Is the respanolbilty elle building designer. 3.2x Impact bridging or lateral bradng required where shown*« OREGON b S E 0. : 6059059 4.No bad should be tippled to any component until after d bradng and 4.!natation of truss Is the responslttty of the respective connector. yj Isetenen an conglste and et no gine should any bads greeter than 5.Design assumes trusses en to be used In a non-corrosive emiranmem, ,IF _Z�� design bads be applied to erry component. and aro for"dry condition•of use. TRANS I D: 408071 5.Com uTrus hes no control over and assumes no responeibNBy for the 6.Design assumes full bearing d supports shown.Shim or wedge If �vh1 4 tiQt fabrication,herding,shipment and Installation of components. necessary. c+l I 11�`- v 7.Design assumes adequate drainage is ed. II 6.The design Is furnished sub)ect to the Imitations set forth by 8.Plates shall be located on both faces of trues,and placed so their center IIIIII VIII IIII VIII VIII VIII IIII IIII IIII MIT USA,lnc.CompuTltla SoftwareTPVWTCA in BCS4,copies of which will be .furnished(1 L)E 1oint center Ines. 0.For basic connectorInes colndde Diglts Indicateof plate design values see ESR-1311,ESR-1958(MITeq aEXPIRE8:12/31/2015 I IIIIIIIIIIIIII This design prepared from computer input by' PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 26'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF)Cq=1.00 TC: 2x4 KDDF 81&BTR LOAD DURATION INCREASE = 1.15 1. 2= 0) 50 2- 8= •270111 1528 3. 8= -383 258 BC: 2x4 KDDF N1&BTR SPACED 24.0' O.C. 2- 3= -1813) 396 8- 9=(-124) 1001 8- 4=(.128` 638 WEBS: 2x4 KDDF STAND 3- 4= •1590) 399 9. 8=(•298) 1528 4. 9= -128) 638 LOADING 4- 5= -1590) 399 9- 5=(•383) 258 TC LATERAL SUPPORT<= 12'OC. UON. BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -1813 396 DL ON BOTTOM CHORD = 10.0 PSF 8. 7= 0 50 OVERHANGS: 12.0' 12,0' TOTAL LOAD = 42.0 PSF Connector plate prefix desi nators: LL= 25 PSF Ground Snow (Pg) BEARING MAX VERT MAX HORZ BAG REQUIRED BR0 AREA C,CN,CI8,CN18 (or no prefix = CompuTrus, Inc BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE LOCATIONS REACTIONS REACTIONS SIZE SG.IN, (SPECIES M,M2OHS,M18HS,M16 = MiTek MT series LIVE LOAD AT LOCATION(S) SPECIIED BY IBC 2012. 28'- 0,0' -179/ 1206V 130/ 13 OH 55.50' 1.93 KDOF.50' 1.93 KDDF 4H ( 625 625) THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. (00110. 2: Design checked for net( psf) uplift at 24 'oc spacing I VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' @ -1'• 0.0' Allowed . 0.100' MAX TL CREEP DEFL = -0.003' @ -1'• 0.0' Allowed = 0.133' MAX LL DEFL = -0.083' @ 17'- 1.8' Allowed = 1.254" MAX TL CREEP DEFL = •0.127" @ 17'- 1.8" Allowed = 1.672" MAX LL DEFL = 0.002" @ 27'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = •0.003" @ 27'- 0.0' Allowed = 0.133' MAX HORIZ. LL DEFL = 0.026' @ 25'- 6.5' MAX HORIZ. TL DEFL = 0.043" @ 25'• 6.5' 13-00 13-00 6-09 04 '' DESIGN ASSUMES MOISTURE CONTENT DOES 6-02-12 6-02-12 6-09-04 NOT EXCEED 19%AT TIME OF MANUFACTURE. to man wndforce- esistin 12 12 system fponentsiandicladdin rcriteria. s,00 M-4x6 a 6.00 Y andcomP e Wind: 140 mph h=22.4ft, TCDL=4.2,BCDL=8.0, ASCE 7-10 f 4 4 " (A11 Heights), Enclosed, Cat,2, Exp.B, MWFRS(Dlr), 1° Trussduration designedfacforwind6load loads in the plane of the truss only. c M 1.5x3 M -1.5x3 0 M O m O 9 9 yo 8 M-3x4 M-3x4 M-3x4 M-3x4 0 M-3x5(S) 1, ) /, 8-10-03 8-03-11y y y 8-10-03 10-00 16-00 y J. b 1-00 26-00 1-00 y 1 JOB NAME : POLYGON NW PLAN 7-B NH - 63 Scale: 0.2199 '•(.. JSP" Afi6:0. WARNINGS: GENERAL NOTES,unless otherwise noted: �tLI 1 I L.!! / 1.Builder and erection contractor should be advised of al General Notes 1.Na design Is based only upon the parameters shown and Is for an Individual 9`2..P E q{ T r u s s B3 and Warnings before construction commences. buildingcomponent //f Incorporationf component is th of spogn pay of en and proper / 2.2x4 compression web bradng must be Installed where shown+, asuofthe topds the responsibility toy the ally braced designer. _ ,✓' ✓ DES" BY: BS 3.Additional temporary bradng to Insure stability during construction 2.Design at 1'the and bottom chords be throughout et is the respons istity of the erector.Additional permanent bradng of 7 sc,and at 10'do respectively unless braced throughout their le ptit by ,/, /r" DATE: 9/12/2014 the overall structure is the responsibility continuous sheathing such as plywood heaths g(TC)and%ordryvnA(BC), !a" • non ,p of the building designer. 3.2xIn impactofbridgingtruss ors laterel leering required the where shown+a r , ` OREGON ,t(/ 4.No load should c ba lateappledn any component should ld until afteral bracing and 4.Design ass of es trusses Is the responsibility obs sof the respective contractor. ^7 Z, SEQ. : 605 9060 fasteners are complete and at no time should any loads greater than 5.Design assumes busses ars to be used In a non-corrosive environment, G" � design loads be applied to any component •and aro for"dry condition*of use. TRANS I D: 408071 e.CompuTn,s he.no control over and assumes no responsibilityresponsibilityfor the 6Denean assumes full bearing at all supports shown.Shim or wedge If V 14 20n Q`} fabrication,handling,shipment and Installation of components. 7.Design assures adequate drainage Is provided. /� '�R V�y V 6.This design Is furnished subject to the Imitations set forth by It Plates shall be located on both faces of truss,and placed so their center 1111111 VIII VIII VIII VIII VIII IIID IIII IIIIch will be furnished MTe USA,Inc./CompuTrusIANTCA in BCSI,copies of tSoftware 7 8 L En request. th Joint center Ines. lines Da of design iBlF � plaro inches. see ESR-1311,ESR-1968(g9Tek) EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 28'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 IC: 2x4 KDDF Y16BTR; LOAD DURATION INCREASE = 1.151- 2= 0 50 2- 8= -251 1275 8- 3= 0) 232 SPACED 24.0' O.C. 2. 3= -1524 377 8- 9= -253 1272 3- 9= -448 135 206 KDDF N18BTR T2 9. 4= -1084 960 9.10= -282 1212 9. 4= -87) 535 BC: 2x4 KDDF 411NDfl LOADING 4- 5= 0) 0 10-11= -261 1213 9- 8= -391) 167 WEBS: 2x4 KDDF STAND LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 4. 6= -1043) 332 6.10= 0) 201 TC LATERAL SUPPORT<= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 6.11= -1450 362 BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF 13- 7= -846 181 LL = 25 PSF Ground Snow (Pp) NOTE: 2T4 OPACIOR AT E'SC UON. FOR BEARINGLMAX VERT MAX HOAZ BRG REQUIRED BAG AREAOCATIONS REACTIONS REACTIONS SIZE MIN. (SPECIES ALL FLAT TOP CHORD AREAS NOT SHEATHED RIMIIRD STORAGE DOES NOT APPLY DUE TO THE BEANIAL 0'- 0.0" -187/ 1048V -97/ 102H 5.50' 1.68 KDDF ( 825 _, = AEOUIREYENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 21'- 6.5" -92/ 683V 0/ OH 53.50' 1.09 KDDF ( 625 OVERHANGS: 12.0' 0.0' BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 26'- 0.0' -149/ 286V 0/ OH 53.50' 0.46 KDDF ( 625 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. verica or equal non-structural verticalICOND 2• Design checked for net(_5,nsfl uplift at 24 'oc soacina.) members (uon). VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L1180 Connector plate prefix designators: MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed = 0.100' C,CN,C18,CN18 (or no prefix) = CompuTrua, Inc Refer to CompuTrus standard MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' M,M2OHS,1118HS,M18 = MiTek MT series gable end detail for complete MAX LL DEFL = -0.041' @ 11'- 0.0' Allowed = 1.054' specifications. MAX IL CREEP DEFL = -0.083' @ 11'• 0.0' Allowed = 1.406" MAX HORIZ. LL DEFL = 0.020' @ 21'- 11.5' MAX HORIZ. TL DEFL a 0.034' @ 21'- 11.5' DESIGN ASSUMES MOISTURE CONTENT DOES NOT EXCEED 19's AT TIME OF MANUFACTURE. 13-00 13-00 Design conforms to main windforce-resisting f system and components and cladding criteria. 5-11 5-01 2-00 3-01 9-11 (Wind: 140 mph, h=22.4ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 T T T A11 Heghts), Enclosed, Cat.2, Exp.B, MWFRS(Dir), 12 5 =M-4x4+ 12 load duration factor=l.6 ? M-4X6 *- 16.00 Truss designed for wind loads 8.00 in the plane of the truss only. e v� M-3x4 o M-3x4 0 , v; M-3x4 M-3x4+ 0 V) O .4- o O feil� . O B 9 a ' r 10 11^ 8 M-3x4 M-1.5x3 0.25' M-1.5x3 0 M-5x8(S) y y y ), y 5-09-04 5-02-12 5-02-12 5-03-12 4-05-08 k y 26-00 1- 00 1-00 �c�c,0 PROPt JOB NAME: POLYGON NW PLAN 7-B NH - 64 Scale: 0.2436 „c� I,7iz /0 .WARNINGS: GENERAL NOTES,unless otherwise noted: - ' ,�P E f' B4 ir 1.Builder end erection c ntrador should be advised of al Gener&Notes 1.This design Is based only upon the parameters shown end Is for an Individual i .Truss: B4 and Warnings before construction commences. building component.Applicability of design parameters and proper 2.2x4 compression web bradng must be Installed where shown+. Incorporation of component Is the responsibility of the building designer. 3.Additional temporary bracing to Insure stadmy during construction 2.Design assumes the top and velybosu chords to be laterally braced a[ DES. BY: BS is the responsibility or the erector.Additional permanent bradng of c o.c,and a<ta'4nc.cre h as p y unless braced(TC)and/o dry lerpth). /,-d d' �, continuous sheathing such a pywood ehaathing(TC)and/or drywnl(BC). DATE: 9/12/2014 the eyeful structure Is the responsibility of the building designer. 3.2x Impact bridging or lateral bradng required where shown++ 37L y .( RE�ION�a �C 4.No load should be rippled to any component until after al bracing and 4.m otellatlon of truss Is the responsldly of the respective contractor. . '��' E N SEQ. : 60590 61 fasteners ere complete and at no time should any beds greater len 5.Design eesumss tomes eret sbe used In a noncorrosive environment. V design loads be applied to any component end are for"dry condition"of as. TRANS I D: 408071 5.CompuTnrs has no control over and assumes no responsibility for the 8.Design aasumes full beading at el supports shown.Shim or wedge H A. fabdcation,handling,shipment and Installation of components. necessary.ass --/`R R V t-k- 7.Design assumes adequate drainage Is provided. 8.This design Is furnished sr�ect to the imitations set forth.by 8.Plates shell be located of pooneboth faces of Nes,end placed so their center 11111111111111111111111111111111111 Welt SATPIANTCA'nln CompuTrrta Software 7 es of which v4I be furnished 8(1 L)�m in inches. 0. Joint center Ines. 9.Fla basic ts connInes coindde eector plate design values see ESR-1311,ESR-1988(MITeq EXpIRE5:12/3112015 IIIIIIIIIIIIi This design prepared from computer input by— PACIFIC yPACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 22'• 0.0" TC: 2x4 KDDF #16BTR LOAD DURATION INCREASE = 1.15 ICOND. 2: Design checked for net(-5 sit) uplift at 24 'oc spacing,' BC: 2x4 OF #16BTR; SPACED 24.0' O.C. DESIGN ASSUMES MOISTURE CONTENT DOES 2x4 KDDF #16BTR 51 NOT EXCEED 19%AT TIME OF MANUFACTURE. LOADING TC LATERAL SUPPORT<= 12'OC. UON. BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF Design conforms to main windforce-resisting DL ON BOTTOM CHORD = 10.0 PSF system and components and cladding criteria. Connector plate prefix desi nators: TOTAL LOAD = 42.0 PSF Wind: 140 mph h=15ft, TCDL=4.2 BCDL=6.0, ASCE 7.10, C,CN,C18,CN18 (or no prefix = CompuTrus, Inc LL= 25 PSF Ground Snow (Pg) (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), M,M2OHS,M18HS,M16 = MiTek MT series coed duration factor=l.6 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind loads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET, in the plane of the truss only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP Gable end truss on continuous bearing wall UON. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. Refer or equal typical at stud verticals. to CompuTrus gable end detail for complete specifications. 11-00 11-00 12 T T 6.00 C;7- HM-4x4 12 3 Q 6.00 11 M O O u; 03 O /—V'S 4 Cr) O8IA : 4 O M-3x5(S) a M-3x4 M-3x4 J. J. J. y 12-00 10-00 y 1-00 22-00 y l 1.00 JOB NAME: POLYGON NW PLAN 7-B NH - Cl 9, pR4Ft Scale: 0.3691 \���1 IN ss WARNINGS: GENERAL NOTES,unless otherwise noted: if? /rt,,, t 1.Builder and erection contractor should be advised of ell General Notes 1.This design Is based only upon the parameters shown and Is for an Individual -4t' T 921 4 P E r Truss: 01 and Warnings before construction commences, building component.Applicability of design parameters and proper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component Is the responsibility of the building designer. �.% /.../ DES. BY: BS 3.Additional temporary bracing to insure stability during construction 2.Design assumes the top and bottom chords to be laterally braced at is the responsibility of the erector.Additional permanent bracing of 2'c.c.and at 10'o.c.respectivelyunless braced throughout their length by ,�r,�► DATE: 9/12/2014 the wares structure Is the responsibility of the build designer. continuous sheathing such as (g ^5 5^ 3.2s Impact bridging or lateral bracing�shred wheres oven drywaA C). /^�'Aa� �f 4.No load should be applied to anycomponentrt�prequired shown++ ea SEQ. : 60590 62 fasteners are co p� until alter all bracing and 4.Desalt tion of trues is the responelday of the respective contractor. n4 7 OREGON complete and at no time should any loads greater than 5.Design assumes trusses ere to be used In a non-corrosive environMe ts J.0 TRANS I D: 408071 Cornpudesign Trus be applied to any component. and are for"dry condition*of use. / Q S.CompuTrus has no control over and assumes no responslbmy for the O.Designnecessassumes full bearing at ail supports shown.Shim or wedge if 114 1 2. p, n 6.This design is furnished subject to the fabrication,handing,shipment andmryations tet forthn B.Design h s shall beytoceteduata drainage Is provided.and placed so their center 4ferir1`uv. 5 I IIIIII 11111 11111 VIII 11111 11111 11111 IIIb IIIb TPIANTCA in SCSI copies of which will be furnished upon request apes coincide with)Dint on faces Ness.o MITek USA,Inc./CompuTrus Software 7.8.8(1 L)-E 190.For bDigitsasicconesize of neector plate desigte in n values see E8R-1 311,E8R-1588(MiTek) EXPIRES:12/31/2015 This design prepared from computer input by IIIIIIIIIIIIII PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 22'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF M18BTR LOAD DURATION INCREASE = 1.15 1- 2= 0 50 2- 8= •224 1281 3. 8= -311 220 SPACED 24.0' O.C. 2- 3= -1504 335 8- 9= -103 834 8- 4= -111` 492 BC: 2x4 KDDF S1ANDfl 3. 4= -1318 338 9. 6=1.2531 1281 4- 9= -111) 492 WEBS: 2x4 KDDF STAND LOADING 4- 5= -1318) 338 9- 5= -311) 220 LL 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -1504`) 335 TC LATERAL SUPPORT <= 12'OC. UON. ( UL ON BOTTOM CHORD = 10.0 PSF 6- 7= 0 50 BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF OVERHANGS: 12,0' 12.0' LL = 25 PSF Ground Snow (Pp) BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA Connector plate prefix designators: LOCATIONS REACTIONS REACTIONS SIZE SQ,IN. (SPECIES C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 0'- 0.0' -119/ 1038V -109/ 109H 5.50' 1.68 KDDF 825 M,M2OHS,M18HS,M16 =MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. 22'- 0.0' -119/ 1038V 0/ OH 5.50' 1.66 KDDF ( 625 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP IGOhD 2 Des gra checked for net( 5 asfl uslift at 24 'oc soac ng AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed= 0.100' MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' MAX LL DEFL = -0.043' @ 14'- 5,8' Allowed = 1.054' MAX TL CREEP DEFL= •0.088' @ 14'- 5.8' Allowed = 1.406' MAX LL DEFL = 0.002' @ 23'- 0.0' Allowed = 0.100' MAX TL CREEP DEFL = -0.003' @ 23'- 0.0' Allowed= 0.133' MAX HORIZ. LL DEFL = 0.018' @ 21'- 8.5' 11-00 MAX HORIZ. TL DEFL = 0.030' @ 21'- 8.5' 11-00 1' 1' DESIGN ASSUMES MOISTURE CONTENT DOES 5-09-04 5-02-12 5-02-12 5-09-04 NOT EXCEED 19's AT TIME OF MANUFACTURE. TDesign conforms to main windforce-resisting 12 "'" :16.00 12 system and components and cladding criteria. 6.00 M-4x6 Q 6.00 Wind: 140 mphh=15ft, TCDL=4.2 BCDL=6.0, ASCE 7-10, 4.0' (All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), 4 hf oad duration factor=1.6 /- /1\1" Truss designed for wind loads in the plane of the truss only. (+) M-1.5x3 M-1.5x3 a 0 co c., a NF m w` o F o 1 1.t. 8 9 • c M-3x4 M-3x4 M-3x5(S) M-3x4 M-3x4 C J, l y 6-11-11 y 7-06-03 7-06-03 y /' y 10-00 12-00 y J, J, y 1-00 22-00 1-00 qac° PRope. G s JOB NAME: POLYGON NW PLAN 7-B NH - C2 Scale: 0.2588 C� ‘11/Z/[77` /oir' 44 ir WARNINGS: GENERAL NOTES,unless otherwise noted: cc "92.'P E r 1.and end erectionrconstrcontractoruction onshouldcon nr advised of al General Notes 1.This deNgnmb�bnand onApplicabilityuddesignthe ters shown and perameten ands for en individual Truss: C2 and Wamroa on bredng commences. properf Incorporation component of component Is the of design pa r of the bend designer. 2.2tr4 compression web bndrg must be Instilled where shown+. 2.Design assumes the top and bottom chords to be laterally braced at . �, ` 3.Additional temporary bracing to Insure stability during construction 2'a.o.and at 10'o.e.respedNely unless braced throughout their NnnQtpthh by ,r.:'P DE$• BY: BS b the responsibility of the erector.Additional permanent bracing of continuous sheathing such as plywood sheathing(TC)end/or drywal(SC). CC DATE: 9/12/2014 the overall structure la the responsibility of the building designer. 3.24 Immppaect bridging or lateral bracing required where shown++ OREGON [/ 4.No bed should be applied to any component until alter elracing band 4.Inion of truss Is the responsibility of the respective contractor. 1,, r�' SEQ. : 6059063 fasteners are complete and at no urns should any beds greater then 5.Design assumes trusses are to be used in a noncorrosive environment, ��/ 14 011P- TRANS I D: 408071 design loads be tippled to any component 5.CompuTrus has no control over and assumes no responsibility for the end are for"dry on full n'of use. n V 6.Design assumes bearing at al supporta shown.Shim or wedge k �r 1�' necesesry. 74 fabdcetion,handling,shipment and instals/on of components. 7.Design assumes adequate drainage Is provided. .. 6.TTPVU eCA In B copes subject tote l banished forth trupon y 8. 8.ins csndde with joint located on Anes.faces of •,end pieced so their center 1111111 IN /1111/1111 II 11111 VIII IIII II MiTek USA,Inc./CompuTrus which Software furnished l)-E ,o.For basiindicate conMaor plate plate value,see ESR-1311,ESR 1985(Wet) EXPIRES;12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by— PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 22'- 0.0' IC: 2x4 KDDF CATION LOAD DURATION INC221.15 ICOND. 2: Design checked for net(-5 psfl uplift at 24 'oc spacing.) BC: 2x4 KDDF A1SBTflSPACED 24.0' O.C. DESIGN ASSUMES MOISTURE CONTENT DOES IC LATERAL SUPPORT <= 12'OC. UON. LOADING NOT EXCEED 19%AT TIME OF MANUFACTURE, BC LATERAL SUPPORT <= 12'0C. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF Design conforms to main andwcladdingresisting Connector plate prefix designators: DL ON BOTTOM CHORD = 10.0 PSF system and components criteria. Connect6,CN16 (or no prefix) = CompuTrus, Inc TOTAL LOAD = 42.0 PSF M,M20HS,M16HS,Mor = MiTek MT series Wind: 140 mph h=15ft,Enclosed, ASCE 7-10, LL = 25 PSF Ground Snow (Pg) (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), pad duration factor=1.8 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind toads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. in the plane of the truss only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP Gable end truss on continuous bearing wall UON. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. M-1x2 or equal typical at stud verticals. 11-00 Refer to CompuTrus gable end detail for f11-00 complete specifications. 12 f 6.00 2 HM-4x412 3 Q 6.00 0 0 0 ui C,) 0 4 M M-3x5(S) o M-3x4 M-3x4 y y y y 12-00 10-00 y 1-00 22-00 y 1-00 JOB NAME : POLYGON NW PLAN 7-6 NH - C3 <(,,1vO PRO4 GENERAL NOTES,unless otherwise noted: Scale: 0.3675 �<j l7`7y(`/CJI NJ /�+yfp, V'/ WARNINGS: f4,1 /1 I fwl/ I O Truss C3 1.Builder and erection contractor should be advised of as General Notes 1.This design Is based only upon the parameters shown and is for an Individual 4• !9 2� ,P E �f and Warnings before construction commences. building component Appaabltity of design parameters and proper 2.2x4 compressional web bracinmust be startled where shown t. Incorporation of component s the responsibility of the building designer. DES. BY: BS 3.Additional temporary bracing to Insure sedgy dosing construction 2.Design assumes the top and bottom chords to be latently braced at s the responsibility of the erector.Additional permanent bracing of 2'oto.and at 10'o.c,respectively unless braced throughout their length by DATE: 9/12/2014 the went structure Is the responsibility of the building designer. continuous sheathing such as plywood ng(TC)andlor drywall(BC). �''ew /� 4.No lad should be tippled te 3.Installation2x Impact bridging or lateral bracing required ofthe where shown++ RI SEQ. : 6059064any componentuntilafterallbracingand 4. ofburseIstheres responsibility of the fasteners are complete and at no time should anybadsDesignto used respective contractor. 74* j7 OREGON TRANS ID: 408 071 design sect'be alrWed to any component. greater than 5.and are assumes dotrusses of to In anon non-corrosive environment, S.CompuTrus has no control over and assumes no responsibility for We S.necessary. Ds Design assumes Na bearing at all supportspshown.Shim or wedge If L'6 4 14 V �4 ents. 6.Thfais design is furnished subject to thecation,handling,shipment and eInd Installation setco Mn by 5.Design sshall assumes both drainage is of buss,and placed so their center [� 1 (i III VIII 11111 II 11111 IIID VIII IIII 1111 TPI/WTCA In BCSI copies of which will be furnished upon request Ines ecindde with Joint center Anes. r7 R 11�.�' V MITek USA,Ina/CompuTrus Software 7.6.8(1 L)-E 10.For connate ector ze plate deste Inign values see ESR-1311,E8R-1g66(MITeir) EXPIRES:12/31/2015 This design prepared from computer input by IIIII III IIIIu PACIFIC LUMBER-BC TRUSS SPAN 22'- 0.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 LUMBER SPECIFICATIONS LOAD DURATION INCREASE = 1.15 1. 2= 0 50 2- 8= •224 1281 3- 8= -311 220 TC: 2x4 KDDF t18BTR SPACED 24.0' O.C. 2- 3= -15041 335 8- 9=I-103I 834 8- 4= -111) 492 WE: 2x4 KDDF S1ANDA 3- 4= -1318) 338 9- 8= -253))))) 1261 4- 9= -111) 492 LOADING WEBS: 2x4 KDDF STAND 4- 5= -131 5- B= -1504 8) 338 9- 5= -311 335 220 TC LATERAL SUPPORT <= 12OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 7= 0 50 BC LATERAL SUPPORT <= 12'OC. UON. L ON BOTTOM CHORD = 10.0 PSF TOTAL LOAD = 42.0 PSF OVERHANGS: 12.0' 12.0' LL = 25 PSF Ground Snow (Pp) BEARING MAX VERT MAX HORZ SRO REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES Connector plate prefix efixpnet ora: T 0'- 0.0' -119/ 1038V -109/ 109H 5.50' 1.68 KDDF ( 825 C M,M2OHS,MI8HS (or no MiTekprefix) = riesuTrus, Inc REQUIREMENTSIMITED AOF IBC GE S2012 AND LIRC U2012 NOT BEING MET. 22'- 0.0• -119/ 1038V 0/ OH 5.50' 1.68 KDDF ( 625 M,g20HS,M18HS,M16 = MTT series BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP IGONO 2 Design checked for nett 5 osfi uplift at 24 'ox soacino.l AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = 0.002' 0 -1'- 0.0' Allowed = 0.100' MAX TLCREEP MAX LL DEFL = -0.043' @ 14'- 5.8' Allowed = 1. 054' MAX TLMAXELL DEFL = 0.002' @ 23'- 0.0' Allowed = 0.100• MAX TL CREEP DEFL = -0.003' @ 23'- 0.0' Allowed = 0.133' MAX HORIZ. LL DEFL = 0.018' @ 21'- 6.5' MAX HORIZ. TL DEFL = 0.030' @ 21'- 8.5' 11-00 11'00 DESIGN ASSUMES MOISTURE CONTENT DOES NOT EXCEED 19%AT TIME OF MANUFACTURE. 5-09-04 5-02-12 5-02-12 5-09-04 Design conforms to Bain windtorce•resisting 12 system and components and cladding criteria. 12 M-4x6 Q 6.00 Wind: 140 mphh=15ft, TCDL=4.2 BCDL=6.0, ASCE 7.10, 6.00 (All Heights), Enclosed, t;at.2, Exp.B, MWFRS(Dir), 4.0' load duration factor=1.6 4 .1-.,/ Truss designed for wind loads ii in the plane of the truss only. c; M-1.5x3 1\ M-1.5x3 0 0 u, C) 0 0 co O „' 9 C. M-3x4 M-3x4 M•3X5(S) M-3x4 M-3x4 O y y y 6-11-11 y 7-06-03 7-06-03y b 12-00 y 10-00 ), )' y y 22-00 1-00 1•00 ? .0 PROF�rs JOB NAME: POLYGON NW PLAN 7-B NH - C4 Scale: 0.2498 [�]y ixi �q GENERAL NOTES,unless otherwise noted: 4' 7 r"E 7 WARNINGS: "00 / 1.Builder and erection contractor should be advised old General Notes 1.Ibis design is bassi only upn the deslSnurepar shown and is of individual� _aidf and Warnings before construction commences. building componentApplicability pe Truss• C4 on web bredng must be installed where shown+. Incorporation of component is the responsldety of the building designer. • 2.2x4 compression 2.Design assumes the top and bottom chords to be laterally braced at 3.Additional temporary bracing to Insure stsdlty during construction T o.a ad at 1O'o.e.mpedMey unless breed throughout their lerr��ptly,h by ./ DES. BY: BS Is the responsibility of the erector.Addtaonel pwmaned bracing of continuous t 10'cling such as plywood s brae ndt rc)and/or drywength b *7/61471.;t25..°1:1 OREGON �fJ DATE: 9/12/2014 the overall sWdhn is the responsibility of the bulking designer. 3.2x Impact bridging or lateral bredng required where shown++ mpe a 4.No bad should be applied to any component until titer d bracing and 4.Installation of truss is the responsibility of the respective codredor. , '.� "� 1 Z��Q,SEQ. : 6059065 fasteners are complete and at no time should any bads greeter than 5.Design assumes trusses ere to be used in a non-corrosive environment, IC design bads be applied to any componentend are br-dry condbon'of use. TRANS I D: 408071 5.Compares hes no contrd over end assumes no responsibility for the 5.Design ea bearing etas supporta shown.Shim or wedge t J� b ,�� fabrication,herding,shipment and installation of components. 7.Design assumes ed ctuate drainage Is provided. e.This design is furnished subject to the Imitations set forth by 5.Plates n wind&with ted on both lace.�'and plead so their center I IIIIII IIII11111111111111111111INII III 1111 MITekIS,lac.Comps of wS Software furnished 1L)-E request. Digits qainubpa «ow es see ESR-1 31 1,ESR-teas(htTeb) EXPIRES:12/31/2015 1E111111 Th PACIs iFIC LdesiUMgn BER-BC prepared from computer input by LUMBER SPECIFICATIONS LU: 2x4 KDDF #1&BTR TRUSS SPAN 4'- 0.0' BC: 2x4 KDDF N18BTR LOAD DURATION INCREASE = 1.15 IBC 2012 MAXM2MBEfl 4O(C3S 2WR2-4u(-99).8 WEBS: 2x4 KDDF STAND SPACED 24,0' O.C. 1.2=(-511) 28 1.4=(•35) 32 2.4=(•99) B11 2-3=( 7 3 TC LATERAL SUPPORT <= 12.00. UON. LOADING BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BAG REQUIRED BAG AREA DL ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES Connector plate prefix designators: TOTAL LOAD = 42.0 PSF 1'• 0.0" -24/ 205V -18/ 43H 5.50' 0.31 KDDF ( 625) C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc LL = 25 PSF Ground Snow (Pg) 4'• 0.0' 18/ 131V 0/ OH 5.50' 0.21 KDDF ( 625) M,M20HS,M18HS,M16 = MiTek MT series JT 1: Heel to plate corner = 5.25' LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL (GOND 2 Desicn the s d for net( osf)yplift at 24 oc soacinc I REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VEflTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX ILMAX CREEP DEFL = -0.002' @ 0'- 0.0" Allowed = 0.133' 3-00 AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX IC PANEL LL DEFL = 0.004' @ 2'- 4.0' Allowed = 0.159' T T MAX TC PANEL TL DEFL = -0.005' @ 2'• 5.2' Allowed = 0.239' 12 4.00 D MAX HORIZ. LL DEFL = -0.000' @ 3'• 8.2' MAX HORIZ. TL DEFL = •0.000' @ 3'- 8.2' DESIGN ASSUMES MOISTURE CONTENT DOES NOT EXCEED 19h AT TIME OF MANUFACTURE. Design conforms to main windforce•resisting system and components and cladding criteria. M-1.5x3 3 Wind: 140 mphh=19.8ft, TCDL=4.2,BCDL=6.0, ASCE 7.10 (All Heights), Enclosed, Cat.2, Exp,B, MWFRS(Dir), load duration factor=1.6 Truss designed for wind loads in the plane of the truss only. PI r; Lo0 C 5►' 111.-- 81 4 -/ M-3x8 M-3x6 M-1.5x3 3-00 1, /, 4-00 JOB NAME : POLYGON NW PLAN 7-B NH - D1 vt,0 PR Opt Scale: 0.6324 \ , IN/ �`r/Q WARNINGS: GENERAL NOTES,unless otherwise noted: t,V� �(nA(���rrr���iz, Truss: I]1 1.Builder and erection contractor should be advised of al General Notes 1.This design Is based only upon the parameters shown and is for an Individual 4t" = f P E r" and Warnings before construction commences. building component.Applicability 2.2s4 compression web bredng must be Installed where shown+, Incorporationsh of design aerometers and proper cuuof component Is the responsibility to of ate building designer. - /,.' e.�•' DES. BY: B S 3.Additional temporary bracing to insure atabimy during construction 2.Design assumes the top and bottom chords to be laterally braced at ✓ Is the responsibility of the erector.Additional permanent bracing of 2'o.c.and at 10'o.c.respectively unless braced throughout their lengthby rd's► DATE: 9/12/2014 the overall structure Is the responsibility of the building d 2s Impact bridging sheathing such as plywood sheathing(TC)iceshown and/or d A(B 4.No load should tbeo applied to any0 esigner' 3.2x Impact bridgi g or lateral bracing required where ++ C) ... �� Q SEQ. : '605 9066 pw component until after al bracing and 4.Installation of truss Is the responsibility of the respective contractor. '�� ,� �EGO 0� t(/ fasteners are complete and at no time should any loads greater than 5.Design assumes trusses are to be used In a noncorrosive environment, TRANS I D: 408071 5.design bads be applied to ant'component. 8 and re for"dry condition"of use. CompuTrus has no control over and assumes no responsibility for the necessary.assumes NI bearing at al supports shown.Shim or wedge If Q. 4 Z "�•• 8.Thfais design Is furnishedion, lsu�bject to themltatlo set components.t and Installation of by0.Plates shall be locaated ens othfdrainage ce Is proviso nd placed so their center 1111111111111U1111111111111111111111111111 TPI, CAinBCSI.agesofwhichwilbefurisheduponrequest. evescdnddew,M>ointcenterle:,pf RL�� MiTek USA,Ina/CompuTrus Software 7.6.8 1t.-E 5.Digits Indicate size of plata In inches. ( ) 10.For basic connector piste design values see EOR-1311,ESR-1985(MITeW EXPIRES:12/31/2015 This design prepared from computer input by IIIIIIIIII�III PACIFIC LUMBER-BC TRUSS SPAN 4'- 0.0' IBC 2012 MAX MEMBER(FORCES) 4 4WR!DDF/Cq=1.00 TC4PKDDFI#16BTRS LOAD DURATION INCREASE = 1.15 TC: 2x4 KDDF M16BTR SPACED 24.0' O.C. BC: 2x4 KDDF S168TR AREA WEBS: 2x4 KDDF STAND LOADINGBEARING MAX VERT MAX HORZ BRG REQUIRED BAG LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES TC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 1'- 0.0' -27/ 215V 0/ 27H 5.50' 0.32 KDDF 625 BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD =01)42.0 PSF 3'- 9.2' 0/ 38V 0/ OH 5.50" 0.08 KDDF 825 4'• 0.0' 36/ 84V 0/ OH 1.50' 0.13 KDDF 825 Connector plate prefix designators:) .CoLL = 25 PSF Ground Snow (Pg) C,CN,CI8,CN18 (or no prefix) = ries True, Inc ICOND 2 Design checked for net/ pal) uplift at 24 "Sc eoacine.l g,Y20HS,Y18HS, 18 =MiTek MTseries LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL JT 1: Heel to plate corner = 5.25' flEOUIREMENTB OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L1240, TL=L/180MAX LL DEFL = -0.004' @ 0'• 0.0' Allowed = 0.100• BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX TL CREEP DEFL = -0.003' @ 0'- 0.0' Allowed = 0.133' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TC PANEL LL DEFL = 0.008' @ 2'- 5.6' Allowed = 0.183' MAX TC PANEL TL DEFL = -0.010' @ 2'- 7.0' Allowed = 0.274' MAX HORIZ. LL DEFL = -0.003' @ 3'- 11.2' MAX HORIZ. TL DEFL = 0.003' @ 3'- 11.2' 12 DESIGN ASSUMES MOISTURE CONTENT DOES 4.00 I7 NOT EXCEED 19+1 AT TIME OF MANUFACTURE. Design conforms to main windforce-resisting system and components and cladding criteria. / Wind: 140 mpph h=19.8ft, TCOL=4.2,BCDL=6.0, ASCE 7-10 IAll Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), load duration factor=1.6 M-3x6 Truss designed for wind loads in the plane of the truss only. 9 0, Co / c.,, 4 >-1 3 X M-3x8 1, 1, 3-00 y J' 4-00 PROVIDE FULL BEARING:Jta:4.3.2I Ptp PROpe JOB NAME: POLYGON NW PLAN 7-6 NH - D2 Scale: 0.9224 4`� /Z J f °� WARMNGS: GENERAL NOTES,unless otherwise noted: ' '92 e e P E f .. 1.Bader and erection contractor should be advised of all General Notes 1.Tu s designlding en sed only uponuphift of e ardeameters ign er shown n andend isfor an Individual /�f Truss• D2 and Warningss before bradng mu commences. Incorporation of component N the responsibility of the bulking designer. • 2.2x4 compression web bndrtg mast tis Installed where shown+. 2.Design assumes the top and bottom chords to be laterally braced et 3.Additional temporary bradng to Insure staday during construction Y o.e,and at 10'o.e.rsspectivsy unties braced throughout their b th by f'� DES. BY: BS N the rsspossibNxy of the erector.Addmonal permanent„icing of continuous sheathing such as plywood sheaNng(TC)and/or drywaA cj. F� E...... ON�� ~�4t. DATE: 9/12/2014 the overal structure to the rsponelbmtY of the building designer. 3.2x Impact bddglre or lateral brining required where shown++ 4.No load should be tippled to any component until eller al bredng and 4.Installation of truss Is the responddaty of the respective contractor. ��._L P 14 Q SEQ. : 6059067 fasteners are complete end at no time should any bads greeter than 5.Design assumes tresses aro b be used In a non-corrosive environment, design bads be applied to any component. and are for'dry condtion"of use. it ,r I D: 408071 S.CompuTrus has no control over and assumes no responsibility for the 6.necessary. Na bearing at al supports shown.Shim or wedge N /(�� n`��y fabrication,handing,shipment and Instillation of component•. 7.Design assumes adequate drainage N provided. P 8.The design Is furnished subject to the Irritations set forth by e.Plates shall be located on both faces of truss,end placed so their center 1111111 VIII III1111111(liii III 11111111111111 h c/ upuest. Ines coindde with joint center Ines. on Digits ctor plate e : mo MTcUA,ln.CompuTrue Software 8 6(1L)-E . r sIc connectorin gn ues see ESR-1311,ESR-1955(MITek) EXPIRES:12/31/2015 r . IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 8'- 2.0' ICOND. 2: Design checked for ne lift at 24 "oc TC: 2x4 KDDF M1&BTR LOAD DURATION INCREASE = 1.15 S1 gpeti l BC: 2x4 KDDF 1/1&BTfl SPACED 24.0' O.C. DESIGN ASSUMES MOISTURE CONTENT DOES TC LATERAL SUPPORT<= 12'OC, UON. NOT EXCEED 19%AT TIME OF MANUFACTURE, BC LATERAL SUPPORT <= 12'0C. UON. LOADING Designg LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF conforms to main and cladding criteria. Connector plate prefix designators: DL ON BOTTOM CHORD = 10.0 PSF system and components cladding criteria. Connec 8,CN18 (or no prefix) = CompuTrus, Inc TOTAL LOAD = 42.0 PSF Wind: 140 mph, h=15ft, TCDL=4.2,BCDL=6.0, ASCE 7-10, M,M20HS,M18HS,M16 = MiTek MT series LL = 25 PSF Ground Snow (Pg) (All Heights), Enclosed, Cat,2, Exp,B, MWFRS(Dir), load duration factor=1,6 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind loads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. in the plane of the trues only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP Gable end truss on continuous bearing wall UON. AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. M-1x2 or equal typical at stud Refer to CompuTrus gable end detailtail for for complete specifications. 12 3 -s 4.00 t7 0 ....0 0 ___..111illill U) r,,- C:...- 1 ariEll11111111.11.11111111..1.1.II 11.111111.1111.111 MEM ENE M-3x4 4 y y 1-00 8-02 y JOB `NAME : POLYGON NW PLAN 7-B NH - El ., PRpcF Scale: 0.6585 ,os G(N ' `SQ/0 WARMNOB: GENERAL NOTES,unless otherwise noted: �t, /r� . 1.Builder and erection contractor should be advised of as General Notes 1.This design is based only upon the parameters shown and is for an Individual '9G 0 P E rTruss: El and Warnings before construction commences. building component.Applicability of design parameter and proper 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component is the responsidaly of the building designer. ,r' ,,/ DES. BY: BS 3.Additional temporary bracing to Insure stability during construction 2.Design assumes the top and bottom chords to be laterally bracedat Is the responsibility of the erector.Additional permanent bracing of Z o.c,and at 10'o.a respectively unless braced throughout their length by - 4610101F DATE: 9/12/2014 the ovxaa struduro Is the responsibility of the building designer. continuous sheathing such as plywood sheathing(TC)and/or drywse(eC. „...",4111111. . Q 4.No load should be applied to anym 3.2x Impact bridging or lateral bredng required where shown++ ) f PeM component until after all bracing and 4.InstDesign a s of es trussesr s responsibility be sInhere-corn respective acontractor.erofron "pL/ ,yOREGON� �4(/ SEQ. : 6059068 fasteners are complete and at no time chock any loads greater than 5.Design assumesslat are to be used in a resile tive c eov t 44, t„ design loads be applied to any component, and are for"dry condition'of use. TRANS I D: 408071 5.CompuTrus8.Design as um es full bearing at all supports shown.Shim or wedge If Q 1 4-.1 P has no control over and assumes no responsibility for the fabrication,handling,shipment end Installation of components. T.Design assumes adequate drainage Is provided. ./41411t.\-.necessary. 4 h faces d so their center III VIII VIII VIII(IIII VIII VIII IIII IIII BM Te USA,Inc./CompuTrus I,copies ofCompuTrus Softwa.This design is furnished subject to the h will re 7 8 6(1 L E request upon 9.0 Ines Ines Indicateidsize cons set forth by 8.Plates shall be nnector plate da values truss, ESR-1711x ESR-1988(MRep EXPIRES:12/31/2015 11411 This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 8'. 2.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF N18BTR LOAD DURATION INCREASE = 1.15 1.2=( 0) 36 2.5=(-51) 67 3-5=(-255) 179 BC: 2x4 KDDF S1ANDR SPACED 24.0' 0.C. 2.3= -105 3.4= )1 88 3 WEBS: 2x4 KDDF STAND LOADING TC LATERAL SUPPORT<= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BEARING MAX VERT MAX HORZ BRG AEOUIRED BRG AREA 4 BC LATERAL SUPPORT <= 12'0C. UON. DL ON BOTTOM CHORD = 10.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SO.IN. (SPECIES TOTAL LOAD = 42.0 PSF 0'- 0.0' -68/ 479V .33/ 97H 5.50" 0.77 KDDF ( 6251 OVERHANGS: 12.0' 0.0' LL = 25 PSF Ground Snow (Pp) 8'- 2.0' -39/ 335V 0/ OH 5.50' 0.54 KDDF ( 625 Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL (GONG 2 Design checked for net(�psft uplift et 24 'oc soecinc. M,M2OHS,M18HS,M/8 =MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX LL DEFL = 0.002' @ -1'- 0.0' Allowed = 0.100' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed = 0.133' S MAX TC PANEL LL DEFL = -0.294' @ 4'- 1.7' Allowed = 0.484' 7-10-04 0-03-12 MAX TO PANEL TL DEFL = -0.393' @ 4'- 1.7" Allowed = 0.727' T f 'f MAX HORIZ. LL DEFL = 0.001' @ 7'- 10.3' 12 MAX HORIZ. TL DEFL = 0.001' @ 7'- 10.3' 4.00 I7 DESIGN ASSUMES MOISTURE CONTENT DOES M-1.5x3 NOT EXCEED 19%AT TIME OF MANUFACTURE. 4 -v Design conforms to main windforce-resisting system end components and cladding criteria. 1 Wind: 140 mph h=15it, 7CDL=4.2,BCDL=8.0, ASCE 7-10, �All Nelghts), Enclosed, Cat.2, Exp.B, MWFRS(Dir), oad duration factor=l.8 Truss designed for wind loads 0 in the plane of the truss only. _...iiiiiiiiiiiiiil0 0 c:)rn iG r. i 111 o � -1'0 2►� ►�5 M-3x4 M-1.5x3 yy J' 7-10-04 0-03-12 J' J, y 1-00 8-02 `���� 619 �,0 PR()Fe JOB NAME: POLYGON NW PLAN 7-B NH E2 Scale: 0.5571 �, ��iZ /9��f- WARNINGS: GENERAL NOTES,unties otherwise noted: 92 0/P E 1.Builder and erection contractor should be advised of el General Notes 1.Tile design Is based only upon the parameters shown and is for an Individual 40P,007,„ Truss E2 and Warnings before construction commences. budding component.Applcadmy of design parameters end proper nSs Incorporation of component is the responsibility of the building designer. 2.2x4 compression web bracing must be InsteRed where shown+. 2.Design assumes the top and bottom chords to be laterally braced at ,/, " 3.Additional temporary bracing to Insure etdHy during construction 2'o.o.end at 10'o.a respectively unless braced throughout their isn�th by �'aes' DES. BY: BS Is the responNdmy of the erector.Additional permanent bracing of cmtlnuous sheathing such as plywood sheatNng(TC)andlor drywaa(aC). A CC DATE: 9/12/2014 the overaA structure is the responsibilty of the building designer. 3.2x Impact bridging or lateral bredng required where shown++ OREGON } 4.No load should be rippled to sny component until after al bracing and 4.Iratetatition of toms la the reaponsiblhty piths respective contractor. SEQ. : 605 9069 festenea aro complete end at no time should any beds greater than 5.Design sesame.trusses aro a be used in■noncorrosive environment, design loads be applied to any component and ere for"dry condition"of use. '�ary. "6 41/ 14 .0�Q` TRANS I D: 408071 5.designCompTrw has no control over end component usumno responsibility for the S Design assumes full besting t al support shown.Shim or wedge If jE I � fabrication,handing,shipment and instdation of components. 7.Design assumes adequate drainage Is provided. S.This design a BCnish easubject to the elch nth Wttione set forth by upon request. a Pneses shall ddbee bested blest n bocenter Ines.�of toes,and placed so their center I 111111 11111 IIIA IIIII 111 /1111/1111 IIII IIII MITek USA,lSCSCompuTrus Software 7.6.6(1 L)-E 0.For basic connector cantle design values see ESR-1311,ESR-1988(MRek) EXPIRES:12/31/2015 11101111111 This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 5'• 3.0' IBC 2012 MAX MEMBER FORCES 4WR/DDF/Cq=1.00 TC: 2x4 KDDF #16BTR LOAD DURATION INCREASE = 1.15 1.2=I0)38 2.5=(-33) 38 3.5=(-161) 127 BC: 2x4 KDDF #1&BTR SPACED 24.0' O.C. 2.3= -89 49 WEBS: 2x4 KDDF STAND 3.4= -7) 3 LOADING TC LATERAL SUPPORT <= 12"OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF BEARING MAX VERT MAX HORZ BRG REQUIRED BRG AREA TOTAL LOAD = 42.0 PSF LOCATIONS REACTIONS REACTIONS SIZE SG.IN. (SPECIES) OVERHANGS: 12.0' 0.0' 0'- 0.0' -61/ 367V -20/ 63H 5.50' 0.59 KDDF625 Connector plate prefix desi nators: LL = 25 PSF Ground Snow (Pg) 5'- 3.0' -24/ 212V 0/ OH 5.50' 0.34 KDDF ( 625) C,CN, C18,CN18 (or no prefix = CompuTrus, Inc LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL M,M2OHS,M18HS,M18 = MiTek MT series REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET, ICOND. 2: Design checked for net(•5 s(Lf) umlift at 24 'oc s acn Snc I VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP MAX LL DEFL = 0.002' @ .1'- 0.0' Allowed = 0.100' AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. MAX TL CREEP DEFL = -0.003' @ -1'- 0.0' Allowed . 0.133' 4-11-04 0-03-12 MAX TC PANEL LL DEFL = 0.038' @ 2'- 10.1" Allowed = 0.279' 1' .' f MAX TC PANEL TL DEFL = -0.043' 9 2'- 8.1' Allowed = 0.419' 12 MAX HORIZ. LL DEFL = 0.000' @ 4'• 11.2' 4.00 i7 MAX HORIZ. TL DEFL = 0.000' @ 4'- 11.2' DESIGN ASSUMES MOISTURE CONTENT DOES NOT EXCEED 194 AT TIME OF MANUFACTURE. Design conforms to main windforce-resisting M-1.5x3 4 system and components and cladding criteria. 3 Wind: 140 mph h=15ft, TCDL=4.2,BCOL=8.0, ASCE 7.10, All Heights), Enclosed Cat.2, Exp.B, MWFRS(Dir), load duration IIIfactor=l.l Truss designed for wind loads in the plane of the truss only. 0 0 N in 0 1 M-3x4 M-1.5x3 y ), y 4-11-04 0-03-12 1-00 5-03 Scale: 0.6126 '<(-. m 6'6> ' O JOB NAME: POLYGON NW PLAN 7-6 NH - E3 � (N� s,* WARNINGS: GENERAL NOTES,unless otherwise noted: _ /,�� "f�,, 1.Builder and erection contractor should be advised of el General Notes 1.This design is based only upon Gia parameters shown end is for an Individual �' 92.0.P E Truss: E3 and Warnings before construction commences. building component Applicability of design parameters and proper /// 2.2x4 compression web bracing must be Installed where shown+. Incorporation of component is tire responsidlIryry of the building designer. �,+r'"' 3.Additional temporary bracing to insure wdlty during construction2.Design assumes the top and bottom chords to be laterally braced at DES. BY: BS is the responsibility of the erector.Additional permanent bradng of 2'o.c.and at 10'o.c,respectively unless braced throughout their length by ` e%IMP' the overall structure Is the res continuous sheathing such as plywood sheathand/or drywal(BC). DATE: 9/12/2014 responsibility of the building designer. 3.2x Impact bridging or lateral bndng required where here shown++ OREGON �Q 4.No load should be applied to any component until alter sl bracing and 4.Installation of truss Is the responsibility of tM respective contractor. SEQ. : 6059070 fasteners are complete and at no time should any bads greater then 5.Design assumes trusses are to be used ina non-corrosive environment, L�1�J 1_ 2 ��4. design bads be applied to any component. and are for"dry condition"of use. c!. ^'�.r 14 Q �, TRANS I D: 408 071 5.ConpuTrus has no control over end assumes no responsibility for the S.Design�aassumes N6 bearing at al supports shown.Shim or wedge If1 fabrication,handling,shipment and installation of components. 7,Design assumes adequate drainage Is provided. R I311.•'-� (IIII VIII VIII VIII VIII VIII VIII III IIII a.This design is furnished subject to the t be funs set forth by O.Plates shall be located on both faces of truss,ad placed so their center TPI/WTCA in SCSI,copies of which will be furnished upon request Ines cdndde with joint center Ines. 9.Digits indicate size of plate in Inches. MiTek USA,Ina/Com uTfus Software 7.6.6(IL)-E 10.For basicconnedor plate design values see ESR-1311,ESR-19e5(Minn() EXPIRES:12/31/2015 IIIIIIIIIIIIII This design prepared from computer input by PACIFIC LUMBER-BC LUMBER SPECIFICATIONS TRUSS SPAN 5'- 3.0' ICOND 2' Design checked for net(-5 osfl uplift at 24 'ox apacing.l TC: 2x4 KDDF N1&BTH LOAD DURATION INCREASE = 1.15 DESIGN MOISTURE CONTENT DOES BC: 2x4 KDDF 91&BTR SPACED 24.0' D.C. NOT EXCEED ASSUMES19%AT TIME OF TENTMANUFACTURE. TC LATERAL SUPPORT<= 12'OC. UON. LOADING Design conforms to lain windforce•resisting BC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF DL ON BOTTOM CHORD a 10.0 PSF system and components and cladding criteria. Connector plate prefix desipnators: TOTAL LOAD = 42.0 PSF C,CN,CI8,CN18 (or no prefix) = CampuTrus, Inc Wind: 140 mph Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), h=15ft, TCDL=4.2,BCDL=8.0, ASCE 7-10, i M,M2OHS,M18HS, 18 = MiTek MTT series LL = 25 PSF Ground Snow (Pg) (Alload duration factor=1.8 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL Truss designed for wind loads REQUIREMENTS OF IBC 2012 AND IRC 2012 NOT BEING MET. in the plane of the truss only. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP -1e2 or equal typical at stud verticals. x2 end truss on continuous bearing lsUON, He AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. Rf Refer to CoapuTrue gable end detail for • complete specifications. 12 4.00 ' 3 0 a N in./— C. M-3x4 in y 1, ), 1-00 5-03 I ��t0 PRore JOB NAME: POLYGON NW PLAN 7-B NH - E4 Scale: 0.7737Ap �� � �izi /o WARNINGS: GENERAL NOTES,unless otherwise noted: (,� .9 s _/PrE f 1.Builder end erection contractor should be eddied of all General Notes 1.This design is based only upon the parameters shown end Is for an Individual 92. E4 and Warnings before construction commences. building component.Applicability of design parameters and proper Truss: compression Incorporation of component Is the responsibility of the building designer. ' 2.7x4 coon web)erasing must be bstaaed where shown+. 2.Design assumes the top end bottom chords to be laterally braced a 3.Additional temporary bracing to inure stabilry during construction ,sfd iiiiIP DES. BY: BS Is the res of the erector.Additionalpermanent bracing of 7 0.0.and et 10'o.c.respectively unless braced throughout their length by ,%•esa,n responsibility continuous sheathing such n plywood aheetNng(TC)and/or drywaA(BC). -_ty tr DATE: ; 9/12/2014 the overall structure is the responsibility"of the building designer. 3.2x Impact bridging or lateral bradng required where shown++ QRE�I•ON to 4.No load should be rippled to any component until after al bracing end 4.Installation of buss b the responsibility of the respective contractor. t, SEQ. : 6059071 fasteners are complete and et no time should any bads greater than 5.Design assumes busses are to be used in a non-corrosive environment. Z �~ design bads be applied to any component and aro for"dry condition"of use. V. TRANS I D: 408071 5.CampuTrus hes no control over and assumes no responsibility for the 5.necessary.edar es.umes on bossing d ell supporta shown.Shim or wedge N '�.A' 4 ��T' fabrication,handling.shipment end Installation of components. Dsignas "r'I fi`�R`L�„_ 7. assumes adequate drainage is provided. 5.The design Is furnished subject to the Irritations set forth by e.Plates shell be located on both faces of trues,end placed so their center 111111111111111111111 M Tek US,lncJCompuTrua In SCSI,copies of )ch will be Software 7.furnished 6(1 L En 1joint canter Ines. 0.ForbIndicate nic am Ines coincide d000f plate plate gn values see ESR-1311.ESR-1958 pNReW EXPIRES:12/31/2015 1