Report (43) yS o1/ &- CX 76
l ccs w 7 -4
Generated by COMcheck-Web Software
flat(1 Envelope Compliance Certificate
k
Section 1: Project Information
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title: Interstate Roofing . . .
Project Type: New Construction
Envelope Compliance Method:Simplified Trade-Off
Construction Site: Owner/Agent: Designer/Contractor:
15065 SW 74th Ave
Portland,Oregon 97224
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Vertical Glazing/Wall Area Pct.: 26%
Building Use:Area Type Floor Area
1-Office:Nonresidential 5522
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES:Design 5%better than code.
Envelope Assemblies:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factor(a)
Perimeter
Roof:Insulation Entirely Above Deck,[Bldg.Use 1 -Office] 5776 --- 42.6 0.023 0.048
Ext.Wall:Solid Concrete,7in.Thickness,Normal Density,Furring: 3635 14.0 0.0 0.140 0.150
Metal,[Bldg.Use 1 -Office]
Door:Uninsulated Single-Layer Metal,Swinging,[Bldg.Use 1 - 21 --- --- 0.800 0.700
Office]
Window:,Pert.Specs.:Product ID solarban 60,SHGC 0.39,[Bldg. 1806 --- --- 0.350 0.450
Use 1 -Office](b)
Door:,Perf.Type:Energy code default,Single Pane,Clear,SHGC 84 --- --- 1.200 0.800
0.80,[Bldg.Use 1 -Office]
Ext.Wall:Steel-Framed,16in.o.c.,[Bldg.Use 1 -Office] 3569 14.0 0.0 0.121 0.064
Floor:Unheated Slab-On-Grade,[Bldg.Use 1 -Office] 384
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
,pnestration Product Rating:
1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Exceptjon(s):
Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: F
Project Title: Interstate Roofing Report date: 08/25/16
Data filename: Page 1 of 10
' ` 12. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Exception(s):
❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: 1 0tf3OOO
Leakage, Insulation,and Component Certification:
3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials.
Plans reference page/section: . i .4-113 l 0 net Zf)i
S. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and
labeled and certified by the manufacturer.
Exception(s):
❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3.
Plans reference page/section: 0'6+l 13 t o 11 2-00
Erg.: Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing,
the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Exception(s):
❑ Requirement is not applicable. �t
Plans reference page/section: 024'113 1 0 19 iA90
el. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
W7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
caelf. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value
rule.
Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
rt 04.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems.
Except' n(s):
Requirement is not applicable.
Plans reference page/section:
❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Exception(s):
(}'Requirement is not applicable.
Plans reference page/section: 'j"CC L\1( / QFA PJ tr(- ( -. l—r-r 0 . 1_
❑ 12.Recessed lighting. Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Exception(s):
( Requirement is not applicable. lQ
Project Title: Interstate Roofing Report date: 08/25/16
Data filename: Page 2 of 10
Plans reference page/section: FL t /
.Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception(s):
U Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms.
O Doors opening directly from a sleeping unit or dwelling unit.
O Doors that open directly from a space less than 3000 sq.ft.in area.
O Revolving doors.
D Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors.
LI Requirement is not applicable.
Plans reference page/section: 4 5- I
14.'Other'components have supporting documentation for proposed U-Factors.
Exception(s):
Requirement is not applicable.
Plans reference page/section:
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck-Web and to comply with th leo datory requirements in the Requirements Checklist.
Name-Title Signature Date
Project Title: Interstate Roofing Report date: 08/25/16
Data filename: Page 3 of 10
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal`
` ansmittal Letter
7,1
13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: pa'n j Q_ADATE lyttly,ED
DEPT: BUILDING DIVISION
NOV 7 2016
FROM: C C;\7v .0fz..( k-\ (.V c N C;lk N,`F,12 S
CITY OF`I'IGARD
COMPANY: C O 10 vl \Ai-21 Y6"IA i BUILDING DIVISION
PHONE: -SQ3 ' ZZ(a — I,2 5 By:`(f/ --
RE:
RE: 6 S
S0l 94-r-
ivie, b UPZC?r(o - oo2 -O
(Site Address) (Permit Number)
'—(Ai S - 2-00
( rolect name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Additional set(s) of plans. (3) 'Revisions: T(. j , Ti .2, T z,1 -T-3. 1 S
Cross section(s)and details. Wall bracing and/or lateral analysis. T` 3 2
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
`T'
-
REMARKS: iZP I_n la c i ko t\,S AQP_ S (2 A v r-e n f l Li r_.n -17) r fie rm 1 -I--
Routed
tRouted to Permit Technicians Date: 'i /rm'
Fees Due: • Yes E;r o Fee Descri.tion: Amort!
$
$
$
$
Special
Instructions:
Re'rint Permit ser PE : ❑ Yes ❑No ❑ Done
A• .licant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012