Loading...
Report (43) yS o1/ &- CX 76 l ccs w 7 -4 Generated by COMcheck-Web Software flat(1 Envelope Compliance Certificate k Section 1: Project Information Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title: Interstate Roofing . . . Project Type: New Construction Envelope Compliance Method:Simplified Trade-Off Construction Site: Owner/Agent: Designer/Contractor: 15065 SW 74th Ave Portland,Oregon 97224 Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 26% Building Use:Area Type Floor Area 1-Office:Nonresidential 5522 Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSES:Design 5%better than code. Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factor(a) Perimeter Roof:Insulation Entirely Above Deck,[Bldg.Use 1 -Office] 5776 --- 42.6 0.023 0.048 Ext.Wall:Solid Concrete,7in.Thickness,Normal Density,Furring: 3635 14.0 0.0 0.140 0.150 Metal,[Bldg.Use 1 -Office] Door:Uninsulated Single-Layer Metal,Swinging,[Bldg.Use 1 - 21 --- --- 0.800 0.700 Office] Window:,Pert.Specs.:Product ID solarban 60,SHGC 0.39,[Bldg. 1806 --- --- 0.350 0.450 Use 1 -Office](b) Door:,Perf.Type:Energy code default,Single Pane,Clear,SHGC 84 --- --- 1.200 0.800 0.80,[Bldg.Use 1 -Office] Ext.Wall:Steel-Framed,16in.o.c.,[Bldg.Use 1 -Office] 3569 14.0 0.0 0.121 0.064 Floor:Unheated Slab-On-Grade,[Bldg.Use 1 -Office] 384 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. ,pnestration Product Rating: 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label afixed to the fenestration products must not be removed prior to inspection. Exceptjon(s): Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: F Project Title: Interstate Roofing Report date: 08/25/16 Data filename: Page 1 of 10 ' ` 12. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Exception(s): ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: 1 0tf3OOO Leakage, Insulation,and Component Certification: 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: . i .4-113 l 0 net Zf)i S. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): ❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: 0'6+l 13 t o 11 2-00 Erg.: Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): ❑ Requirement is not applicable. �t Plans reference page/section: 024'113 1 0 19 iA90 el. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. W7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. caelf. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value rule. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. rt 04.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Except' n(s): Requirement is not applicable. Plans reference page/section: ❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): (}'Requirement is not applicable. Plans reference page/section: 'j"CC L\1( / QFA PJ tr(- ( -. l—r-r 0 . 1_ ❑ 12.Recessed lighting. Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): ( Requirement is not applicable. lQ Project Title: Interstate Roofing Report date: 08/25/16 Data filename: Page 2 of 10 Plans reference page/section: FL t / .Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): U Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. O Doors opening directly from a sleeping unit or dwelling unit. O Doors that open directly from a space less than 3000 sq.ft.in area. O Revolving doors. D Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. LI Requirement is not applicable. Plans reference page/section: 4 5- I 14.'Other'components have supporting documentation for proposed U-Factors. Exception(s): Requirement is not applicable. Plans reference page/section: Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck-Web and to comply with th leo datory requirements in the Requirements Checklist. Name-Title Signature Date Project Title: Interstate Roofing Report date: 08/25/16 Data filename: Page 3 of 10 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal` ` ansmittal Letter 7,1 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov TO: pa'n j Q_ADATE lyttly,ED DEPT: BUILDING DIVISION NOV 7 2016 FROM: C C;\7v .0fz..( k-\ (.V c N C;lk N,`F,12 S CITY OF`I'IGARD COMPANY: C O 10 vl \Ai-21 Y6"IA i BUILDING DIVISION PHONE: -SQ3 ' ZZ(a — I,2 5 By:`(f/ -- RE: RE: 6 S S0l 94-r- ivie, b UPZC?r(o - oo2 -O (Site Address) (Permit Number) '—(Ai S - 2-00 ( rolect name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Additional set(s) of plans. (3) 'Revisions: T(. j , Ti .2, T z,1 -T-3. 1 S Cross section(s)and details. Wall bracing and/or lateral analysis. T` 3 2 Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): `T' - REMARKS: iZP I_n la c i ko t\,S AQP_ S (2 A v r-e n f l Li r_.n -17) r fie rm 1 -I-- Routed tRouted to Permit Technicians Date: 'i /rm' Fees Due: • Yes E;r o Fee Descri.tion: Amort! $ $ $ $ Special Instructions: Re'rint Permit ser PE : ❑ Yes ❑No ❑ Done A• .licant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012