Report C/-7 9-016 - cr X17 Isr� l 5 t 19-171- G r--G F OoES(GN= DRAFT FIELD REPORT ... �.. _ Page 1 of 3 GDI Project: Polygon-122-04 Prepared By: Bret Moskal Project Name: Polygon at Bull Mountain Date: 02/14/17 Location: 15402 SW Seine Court,Tigard, Report#: 139 Oregon Arrival: 1030 Departure: 1100 Weather: Cloudy, 40's Permit#: MST2016-00025 Site Visit Requested By: Jason (Polygon) Met With (on site) Jason Purpose: Evaluate Deck footings lots 47&48, Evaluate lot 31 subgrade. Outstanding Issues: FR 135-Soft disturbed subgrade surface areas for Lots 29, 30,32,ani*RESOLVED TODAY* I arrived on site and met with Jason who directed me to areas observed today, Lot 47&48 Deck footings I observed areas of deck footings of lots 47&48 that had been undermined during the process of the excavation for new footings below preexisting footings. I was informed that crew would be backfilling undermined area with concrete ting newly formed footing into preexisting deck footing,as well as backfilling preexisting deck footings ting into continuous footings of the building. We understand that footing can be backfilled in the orientation. I observed base rock that on site crew had placed in the preparation of concrete backfill of undermined footings. I was informed that there was approx. 2"of crushed rock on the surface of the footing subgrade. Using a Y2"diameter steel foundation rod I probed the base rock. Probing indicated loose base rock. I recommended that base rock be compacted tell rock is well keyed before backfilling. Lot 31 Subgrade While on site I observed the subgrade for lot 31. Crew had place approx. 3"of crushed rock the surface of the subgrade. Using a Y2"diameter steel foundation rod I probe the base rock. Probing indicated area of dense and loose base rock, i'recommended that base rock be compacted-ten crushed rock is-well keyed. I observed areas of silt that approx. 6"(or thicker)in depth that fell underneath what is to be a footing. I recommended that crew remove silt for area before pouring footing. Based on our observation and probing, in area observed today and indicated on attached site plan, expect areas of undermined dock footings which are going to be backfill, were prepared in general acrodance with or geotechnical recommendations. Distribution: Attachments:Site Plan (1), Photo(2) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and spedficatlons throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor`semployees or agents gentsd Ourufirm Is rnoteresponsible sia for site This held report h a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be upon9 project manager,as indicated by Initials in the"Reviewed By"section. 9450 SW Commerce Circle,Suite 300 I Wilsonville,Oregon 97070.1 Off 503.968.8787 1 Fax 503.968.3068 ins rAc,26 - o 4-145 Cn + S89'50'56"W 92.50' I .y'�` 9£{a I 504- 195.214.00. x19101 661r6Lx -3ig43.47 -a 9 4041 0 21.00• 1 ,6.06-- -a <4. m q $ I 51 a I Q 6 * m I A m O w - LL' t6 6 6650 Off- x191162 w 0 rn x 3.05 w car: 12.00' o Y I o D I i4 I 4 f<TI am. N89.50'56"E 92.50' 1 a STAKEOUT LOT 51 HERITAGE CROSSING SE 1/4 SEC 11, T2S, R1 W, WM CITY OF TIGARD WASHINGTON COUNTY, OREGON MARCH 16, 2017 DRAWN: RLMc CHECKED: DMR SCALE 1"=20' ACCOUNT #144-608 Y:\144-608\DWG\144608ST.D WG CMT SURVEYING AND CONSULTING NOTE: 9136 SE ST HELENS ST, SUITE J THIS DRAWING IS NOT INTENDED TO BE USED FOR PC BOX 3251 CLS, OR 97015 850-46 THE PURPOSES OF A MORTGAGE LOAN INSPECTION PHONE (503) 850-4672 FAX(503) 850-4590