Loading...
Report 4,i577-'/(e oD33/ 17v3 ( S w I I AquaSAFETM FIRE SAFETY SYSTEM OFFICE COPY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 "1.-111111)011r- 2/21/17 Job Name : RIVER TERRACE - One Head Calculation (H.8) Drawing : RESIDENTIAL Location : BLDG 7 8 9 & 10 UNIT K-5 TIGARD OR 97223 Remote Area : 18 Contract : 19816F 018 Data File : 19816F 018 Bldg 7, 8, 9, 10, Unit K-5.wx1 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor Page 1 RIVER TERRACE- One Head Calculation (H.8) Date 2/21/2017 HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE Date - 2/21/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 18 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 018 Calculated By - EVAN BENEDICT Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: (X) 1 ( ) 2 ( ) 4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 10 Gpm System Type Listed Pres. at Start Point - 7.3 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 14 x 14 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RESLF37 I Elevation at Highest Outlet - 128 Feet Size 7/16 K-Factor 3.7 G Note: Temperature Rating 162 N Calculation Gpm Required 10 Psi Required 27.58 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: A Date of Test - 1/14/16 Rated Cap. T Time of Test - 11 AM @ Psi E Static (Psi) - 60 Elev. R Residual (Psi) - 55 Other Flow (Gpm) - 3650 S Elevation - 100 P Location: x P L Source of Information: WATER AUTHORITY Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor Page 2 RIVER TERRACE -One Head Calculation (H.8) Date 2/21/2017 City Water Supply: Demand: Cl - Static Pressure : 60 iD1 - Elevation : 12.127 C2- Residual Pressure: 55 D2 - System Flow : 9.997 C2 - Residual Flow : 3650 D2- System Pressure : 27.581 Hose ( Demand ) D3- System Demand : 9.997 Safety Margin : 32.419 150 �V 140 130 : p 120 R 110 E 100 S 90 S 80 U 70 Cl R 60 q ' - C2 E50 o 40 30 a D2 20 10 D1 400 800 1200 1600 2000 2400 2800 3200 3600 'FLOW( NA1.85 ) Computer F,ograms by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Uponor Page 3 RIVER TERRACE -One Head Calculation (H.8) Date 2/21/2017 Fitting Legend Abbrev. Name '/2 3/4 1 1% 11/2 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 E 90'Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Generic Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA 2007 Uponor Page 4 " RIVER TERRACE - One Head Calculation (H.8) Date 2/21/2017 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 60.0 55 3650.0 60.0 10.0 27.581 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.8 128.0 3.7 7.3 10.0 H.11 128.0 7.93 T.36 128.0 9.24 H.16 128.0 9.42 H.13 128.0 9.49 T.32 128.0 9.67 T.34 118.0 14.02 T.37 108.0 18.51 T.23 108.0 18.73 S.1 104.0 20.82 MTR 100.0 26.21 STR 100.0 27.58 T.28 128.0 7.68 T.20 128.0 9.04 H.1 128.0 9.34 H.4 128.0 9.45 T.22 128.0 9.67 T.21 118.0 14.05 T.19 118.0 13.44 H.3 118.0 13.67 H.2 118.0 13.76 H.5 118.0 13.85 T.24 118.0 14.01 H.6 118.0 13.53 T.30 118.0 13.58 r .g 1361 T.38 118.0 13.69 H.18 118.0 13.82 H.17 118.0 13.86 T.33 118.0 14.01 T.35 118.0 13.69 T.41 108.0 18.18 H.15 108.0 18.38 H.14 108.0 18.46 T.39 108.0 18.5 T.40 108.0 18.33 H.10 128.0 9.67 H.7 128.0 9.67 T.26 118.0 14.01 T.25 118.0 14.01 H.9 118.0 14.01 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 5 RIVER TERRACE- One Head Calculation (H.8) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.8 5.19 0.671 Utr 2.0 8.000 7.300 K Factor= 3.70 to 150.0 0.0 2.000 0.0 H.11 5.19 0.0626 0.0 10.000 0.626 Vel = 4.71 H.11 0.0 0.671 Utb 17.0 4.000 7.926 to 150.0 0.0 17.000 0.0 T.36 5.19 0.0627 0.0 21.000 1.316 Vel = 4.71 T.36 -3.61 0.671 Utb 17.0 7.000 9.242 to 150.0 Utr 2.0 19.000 0.0 H.16 1.58 0.0069 0.0 26.000 0.179 Vel = 1.43 H.16 0.0 0.671 0.0 10.000 9.421 to 150.0 0.0 0.0 0.0 H.13 1.58 0.0068 0.0 10.000 0.068 Vel = 1.43 H.13 0.0 0.671 Utb 17.0 7.000 9.489 to 150.0 Utr 2.0 19.000 0.0 T.32 1.58 0.0069 0.0 26.000 0.179 Vel = 1.43 T.32 -0.14 0.862 Utr 2.0 13.000 9.668 to 150.0 0.0 2.000 4.331 T.34 1.44 0.0017 0.0 15.000 0.026 Vel = 0.79 T.34 1.20 0.862 Utb 17.0 15.000 14.025 to 150.0 0.0 14.000 4.331 T.37 2.64 0.0053 0.0 29.000 0.154 Vel = 1.45 T.37 3.48 1.054 Utr 4.0 19.000 18.510 to 150.0 0.0 4.000 0.0 T.23 6.12 0.0094 0.0 23.000 0.217 Vel = 2.25 T.23 3.88 1.054 Utr 4.0 8.967 18.727 to 150.0 T 2.44 6.440 1.732 S.1 10.0 0.0233 0.0 15.407 0.359 Vel = 3.68 S.1 0.0 1.244 2E 3.443 60.000 20.818 to 150.0 0.0 3.443 4.732 ** Fixed Loss = 3 MTR 10.0 0.0104 0.0 63.443 0.661 Vel = 2.64 MTR 0.0 0.995 E 2.336 35.000 26.211 to 150.0 T 5.841 9.345 0.0 STR 10.0 0.0309 G 1.168 44.345 1.370 Vel = 4.13 0.0 10.00 27.581 K Factor= 1.90 H.8 4.80 0.671 Utr 2.0 5.000 7.300 to 150.0 0.0 2.000 0.0 T.28 4.8 0.0543 0.0 7.000 0.380 Vel = 4.35 T.28 0.0 0.671 Utr 2.0 6.000 7.680 to 150.0 Utb 17.0 19.000 0.0 T.20 4.8 0.0542 0.0 25.000 1.355 Vel = 4.35 T.20 -2.88 0.671 Utb 17.0 14.000 9.035 to 150.0 0.0 17.000 0.0 H.1 1.92 0.0100 0.0 31.000 0.309 Vel = 1.74 H.1 0.0 0.671 Utr 2.0 9.000 9.344 to 150.0 0.0 2.000 0.0 H.4 1.92 0.0100 0.0 11.000 0.110 Vel = 1.74 H.4 0.0 0.671 Utb 17.0 5.000 9.454 to 150.0 0.0 17.000 0.0 T.22 1.92 0.0100 0.0 22.000 0.219 Vel = 1.74 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 6 ' RIVER TERRACE- One Head Calculation (H.8) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.22 0.14 0.862 0.0 14.000 9.673 to 150.0 0.0 0.0 4.331 T.21 2.06 0.0034 0.0 14.000 0.047 Vel = 1.13 T.21 1.82 0.862 Utb 17.0 16.000 14.051 to 150.0 Utr 2.0 16.000 4.331 T.23 3.88 0.0108 0.0 32.000 0.345 Vel = 2.13 0.0 3.88 18.727 K Factor= 0.90 T.20 2.88 0.862 0.0 12.000 9.035 to 150.0 0.0 0.0 4.331 T.19 2.88 0.0062 0.0 12.000 0.074 Vel = 1.58 T.19 -1.16 0.671 Utb 17.0 11.000 13.440 to 150.0 0.0 17.000 0.0 H.3 1.72 0.0081 0.0 28.000 0.228 Vel = 1.56 H.3 0.0 0.671 Utr 2.0 9.000 13.668 to 150.0 0.0 2.000 0.0 H.2 1.72 0.0081 0.0 11.000 0.089 Vel = 1.56 H.2 0.0 0.671 Utr 2.0 10.000 13.757 to 150.0 0.0 2.000 0.0 H.5 1.72 0.0081 0.0 12.000 0.097 Vel = 1.56 H.5 0.0 0.671 Utb 17.0 2.000 13.854 to 150.0 0.0 17.000 0.0 T.24 1.72 0.0082 0.0 19.000 0.155 Vel = 1.56 T.24 0.10 0.862 Utb 17.0 2.000 14.009 to 150.0 0.0 14.000 0.0 T.21 1.82 0.0026 0.0 16.000 0.042 Vel = 1.00 0.0 1.82 14.051 K Factor= 0.49 T.19 1.16 0.671 Utb 17.0 5.000 13.440 to 150.0 Utr 2.0 19.000 0.0 G _ s 1S 0.00-154- 00 -2400E0 44394 {_ } J H.6 0.0 0.671 Utr 2.0 10.000 13.534 to 150.0 0.0 2.000 0.0 T.30 1.16 0.0039 0.0 12.000 0.047 Vel = 1.05 T.30 0.0 0.671 Utr 2.0 5.000 13.581 to 150.0 0.0 2.000 0.0 H.12 1.16 0.0040 0.0 7.000 0.028 Vel = 1.05 H.12 0.0 0.671 Utb 17.0 3.000 13.609 to 150.0 0.0 17.000 0.0 T.38 1.16 0.0039 0.0 20.000 0.078 Vel = 1.05 T.38 0.14 0.671 Utb 17.0 8.000 13.687 to 150.0 Utr 2.0 19.000 0.0 H.18 1.3 0.0049 0.0 27.000 0.131 Vel = 1.18 H.18 0.0 0.671 0.0 9.000 13.818 to 150.0 0.0 0.0 0.0 H.17 1.3 0.0048 0.0 9.000 0.043 Vel = 1.18 H.17 0.0 0.671 Utb 17.0 11.000 13.861 to 150.0 Utr 2.0 19.000 0.0 T.33 1.3 0.0049 0.0 30.000 0.146 Vel = 1.18 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams r Uponor Page 7 RIVER TERRACE- One Head Calculation (H.8) Date 2/21/2017 • Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.33 -0.09 0.862 Utb 17.0 1.000 14.007 to 150.0 0.0 14.000 0.0 T.34 1.21 0.0012 0.0 15.000 0.018 Vel = 0.67 0.0 1.21 14.025 K Factor= 0.32 T.36 3.62 0.862 0.0 12.000 9.242 to 150.0 0.0 0.0 4.331 T.35 3.62 0.0094 0.0 12.000 0.113 Vel = 1.99 T.35 -0.14 0.862 Utr 2.0 16.000 13.686 to 150.0 0.0 2.000 4.331 T.41 3.48 0.0088 0.0 18.000 0.159 Vel = 1.91 T.41 -1.66 0.671 Utb 17.0 4.000 18.176 to 150.0 Utr 2.0 19.000 0.0 H.15 1.82 0.0090 0.0 23.000 0.207 Vel = 1.65 H.15 0.0 0.671 0.0 9.000 18.383 to 150.0 0.0 0.0 0.0 H.14 1.82 0.0090 0.0 9.000 0.081 Vel = 1.65 H.14 0.0 0.671 Utr 2.0 2.000 18.464 to 150.0 0.0 2.000 0.0 T.39 1.82 0.0090 0.0 4.000 0.036 Vel = 1.65 T.39 1.66 1.054 0.0 3.000 18.500 to 150.0 0.0 0.0 0.0 T.37 3.48 0.0033 0.0 3.000 0.010 Vel = 1.28 0.0 3.48 18.510 K Factor= 0.81 T.35 0.14 0.862 Utb 17.0 3.000 13.686 to 150.0 0.0 14.000 0.0 T.38 0.14 0.0001 0.0 17.000 0.001 Vel = 0.08 0.0 0.14 13.687 K Factor= 0.04 T.41 1.65 0.671 Utb 17.0 1.000 18.176 to 150.0 Utr 2.0 19.000 0.0 T.40 1.65 0.0076 0.0 20.000 0.151 Vel = 1.50 T.40 0.0 0.671 Utb 17.0 6.000 18.327 to 150.0 0.0 17.000 0.0 T.39 1.65 0.0075 0.0 23.000 0.173 Vel = 1.50 0.0 1.65 18.500 K Factor= 0.38 T.32 0.14 0.671 Utb 17.0 5.000 9.668 to 150.0 0.0 17.000 0.0 H.10 0.14 0.0001 0.0 22.000 0.002 Vel = 0.13 H.10 0.0 0.671 Utr 2.0 7.000 9.670 to 150.0 0.0 2.000 0.0 H.7 0.14 0.0001 0.0 9.000 0.001 Vel = 0.13 H.7 0.0 0.671 Utb 17.0 12.000 9.671 to 150.0 Utr 2.0 19.000 0.0 T.22 0.14 0.0001 0.0 31.000 0.002 Vel = 0.13 0.0 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 8 ' RIVER TERRACE- One Head Calculation (H.8) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******' Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.14 9.673 K Factor= 0.05 T.33 0.10 0.671 Utb 17.0 10.000 14.007 to 150.0 0.0 17.000 0.0 T.26 0.1 0.0 0.0 27.000 0.001 Vel = 0.09 T.26 -0.02 0.671 Utr 2.0 1.000 14.008 to 150.0 0.0 2.000 0.0 T.25 0.08 0.0 0.0 3.000 0.0 Vel = 0.07 T.25 0.02 0.671 Utr 2.0 2.000 14.008 to 150.0 Utb 17.0 19.000 0.0 T.24 0.1 0.0 0.0 21.000 0.001 Vel = 0.09 0.0 0.10 14.009 K Factor= 0.03 T.26 0.02 0.671 Utb 17.0 9.000 14.008 to 150.0 0.0 17.000 0.0 H.9 0.02 0.0 0.0 26.000 0.0 Vel = 0.02 H.9 0.0 0.671 Utb 17.0 11.000 14.008 to 150.0 Utr 2.0 19.000 0.0 T.25 0.02 0.0 0.0 30.000 0.0 Vel = 0.02 0.0 0.02 14.008 K Factor= 0.01 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 • } AquaSAFETM FIRE SAFETY SYSTEM OFFICE COPY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 �rd 2/21/17 Job Name : RIVER TERRACE-Two Head Calculation (H.1 & H.4) Drawing : RESIDENTIAL Location : BLDG 7 8 9 & 10 UNIT K-5 TIGARD OR 97223 Remote Area : 18 Contract : 19816F 018 Data File : 19816F 018 Bldg 7, 8, 9, 10, Unit K-5.wx2 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor Page 1 RIVER TERRACE-Two Head Calculation (H.1 & H.4) Date 2/21/2017 HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE Date - 2/21/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 18 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 018 Calculated By - EVAN BENEDICT Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: ( ) 1 (X) 2 ( ) 4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 10 Gpm System Type Listed Pres. at Start Point - 7.3 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 14 x 14 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RESLF37 I Elevation at Highest Outlet - 128 Feet Size 7/16 K-Factor 3.7 G Note: Temperature Rating 162 N Calculation Gpm Required 20.0269 Psi Required 39.35 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: A Date of Test - 1/14/16 Rated Cap. T Time of Test - 11 AM @ Psi E Static (Psi) - 60 Elev. R Residual (Psi) - 55 Other Flow (Gpm) - 3650 S Elevation - 100 P Location: x P L Source of Information: WATER AUTHORITY Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 of Water Supply Curve C Uponor Page 2 RIVER TERRACE-Two Head Calculation (H.1 & H.4) 11 Date 2/21/2017 City Water Supply: Demand: Cl -Static Pressure : 60 D1 - Elevation : 12.127 C2 - Residual Pressure: 55 D2 - System Flow : 20.027 C2 - Residual Flow : 3650 D2 - System Pressure : 39.348 Hose ( Demand ) D3 -System Demand : 20.027 Safety Margin : 20.651 150 140 130 p 120 R 110 E 100 S 90 S 80 U 70 Cl R 60 0 - C2 0 E 50 D2 40 Q 30 20 10 Dt 400 800 1200 1600 2000 2400 2800 3200 3600 FLOW( NA1.85 ) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Uponor Page 3 RIVER TERRACE -Two Head Calculation (H.1 & HA) Date 2/21/2017 Fitting Legend Abbrev. Name '/2 3/4 1 1'/4 1% 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 E 90'Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Generic Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T 90' Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch • Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA 2007 Uponor Page 4 RIVER TERRACE -Two Head Calculation (H.1 & H.4) Date 2/21/2017 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 60.0 55 3650.0 60.0 20.03 39.348 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.1 128.0 3.7 7.3 10.0 T.20 128.0 12.41 T.28 128.0 13.07 H.8 128.0 13.25 H.11 128.0 13.52 T.36 128.0 14.08 T.35 118.0 18.46 T.41 108.0 23.07 H.15 108.0 23.43 H.14 108.0 23.57 T.39 108.0 23.63 T.37 108.0 23.65 T.23 108.0 24.24 S.1 104.0 27.28 MTR 100.0 34.4 STR 100.0 39.35 H.4 128.0 3.7 7.35 10.03 T.22 128.0 13.12 T.21 118.0 18.13 T.19 118.0 16.98 H.6 118.0 17.52 T.30 118.0 17.8 H.12 118.0 17.95 T.38 118.0 18.4 H.3 118.0 17.44 H.5 118.0 17.81 T.24 118.0 18.12 T.25 118.0 18.3 T.26 118.0 18.32 T.33 118.0 18.55 T.34 118.0 18.63 H.7 128.0 13.65 H.10 128.0 13.8 1.32 128.0 14.18 H.9 118.0 18.31 H.18 118.0 18.46 H.17 118.0 18.48 H.16 128.0 14.12 H.13 128.0 14.14 T.40 108.0 23.33 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 5 RIVER TERRACE -Two Head Calculation (H.1 & H.4) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.1 8.76 0.671 Utb 17.0 14.000 7.300 K Factor= 3.70 to 150.0 0.0 17.000 0.0 T.20 8.76 0.1647 0.0 31.000 5.106 Vel = 7.95 T.20 -5.50 0.671 Utr 2.0 6.000 12.406 to 150.0 Utb 17.0 19.000 0.0 T.28 3.26 0.0265 0.0 25.000 0.662 Vel = 2.96 T.28 0.0 0.671 Utr 2.0 5.000 13.068 to 150.0 0.0 2.000 0.0 H.8 3.26 0.0266 0.0 7.000 0.186 Vel = 2.96 H.8 0.0 0.671 Utr 2.0 8.000 13.254 to 150.0 0.0 2.000 0.0 H.11 3.26 0.0265 0.0 10.000 0.265 Vel = 2.96 H.11 0.0 0.671 Utb 17.0 4.000 13.519 to 150.0 0.0 17.000 0.0 T.36 3.26 0.0265 0.0 21.000 0.557 Vel = 2.96 T.36 -0.73 0.862 0.0 12.000 14.076 to 150.0 0.0 0.0 4.331 T.35 2.53 0.0048 0.0 12.000 0.058 Vel = 1.39 T.35 2.14 0.862 Utr 2.0 16.000 18.465 to 150.0 0.0 2.000 4.331 T.41 4.67 0.0152 0.0 18.000 0.274 Vel = 2.57 T.41 -2.23 0.671 Utb 17.0 4.000 23.070 to 150.0 Utr 2.0 19.000 0.0 H.15 2.44 0.0155 0.0 23.000 0.357 Vel = 2.21 H.15 0.0 0.671 0.0 9.000 23.427 to 150.0 0.0 0.0 0.0 H.14 2.44 0.0156 0.0 9.000 0.140 Vel = 2.21 H.14 0.0 0.671 Utr 2.0 2.000 23.567 to 150.0 0.0 2.000 0.0 T.39 2.44 0.0155 0.0 4.000 0.062 Vel = 2.21 T.39 2.23 1.054 0.0 3.000 23.629 to 150.0 0.0 0.0 0.0 T.37 4.67 0.0057 0.0 3.000 0.017 Vel = 1.72 T.37 5.93 1.054 Utr 4.0 19.000 23.646 to 150.0 0.0 4.000 0.0 T.23 10.6 0.0260 0.0 23.000 0.598 Vel = 3.90 T.23 9.43 1.054 Utr 4.0 8.967 24.244 to 150.0 T 2.44 6.440 1.732 S.1 20.03 0.0844 0.0 15.407 1.300 Vel = 7.37 S.1 0.0 1.244 2E 3.443 60.000 27.276 to 150.0 0.0 3.443 4.732 ** Fixed Loss = 3 MTR 20.03 0.0376 0.0 63.443 2.388 Vel = 5.29 MTR 0.0 0.995 E 2.336 35.000 34.396 to 150.0 T 5.841 9.345 0.0 STR 20.03 0.1117 G 1.168 44.345 4.952 Vel = 8.26 0.0 20.03 39.348 K Factor= 3.19 H.1 1.24 0.671 Utr 2.0 9.000 7.300 to 150.0 0.0 2.000 0.0 H.4 1.24 0.0045 0.0 11.000 0.049 Vel = 1.13 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 6 ' RIVER TERRACE -Two Head Calculation (H.1 & H.4) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.4 10.03 0.671 Utb 17.0 5.000 7.349 K Factor= 3.70 to 150.0 0.0 17.000 0.0 T.22 11.27 0.2625 0.0 22.000 5.776 Vel = 10.23 T.22 -2.57 0.862 0.0 14.000 13.125 to 150.0 0.0 0.0 4.331 T.21 8.7 0.0480 0.0 14.000 0.672 Vel = 4.78 T.21 0.73 0.862 Utb 17.0 16.000 18.128 to 150.0 Utr 2.0 16.000 4.331 T.23 9.43 0.0558 0.0 32.000 1.785 Vel = 5.18 0.0 9.43 24.244 K Factor= 1.92 T.20 5.50 0.862 0.0 12.000 12.406 to 150.0 0.0 0.0 4.331 T.19 5.5 0.0205 0.0 12.000 0.246 Vel = 3.02 T.19 -2.51 0.671 Utb 17.0 5.000 16.983 to 150.0 Utr 2.0 19.000 0.0 H.6 2.99 0.0226 0.0 24.000 0.542 Vel = 2.71 H.6 0.0 0.671 Utr 2.0 10.000 17.525 to 150.0 0.0 2.000 0.0 T.30 2.99 0.0225 0.0 12.000 0.270 Vel = 2.71 T.30 0.0 0.671 Utr 2.0 5.000 17.795 to 150.0 0.0 2.000 0.0 H.12 2.99 0.0226 0.0 7.000 0.158 Vel = 2.71 H.12 0.0 0.671 Utb 17.0 3.000 17.953 to 150.0 0.0 17.000 0.0 T.38 2.99 0.0226 0.0 20.000 0.452 Vel = 2.71 T.38 -0.85 0.862 Utb 17.0 3.000 18.405 to 150.0 0.0 14.000 0.0 T.35 2.14 0.0035 0.0 17.000 0.060 Vel = 1.18 0.0 4&46: 1K Factor--= 0:50 1.19 2.50 0.671 Utb 17.0 11.000 16.983 to 150.0 0.0 17.000 0.0 H.3 2.5 0.0162 0.0 28.000 0.455 Vel = 2.27 H.3 0.0 0.671 Utr 2.0 9.000 17.438 to 150.0 0.0 2.000 0.0 H.2 2.5 0.0163 0.0 11.000 0.179 Vel = 2.27 H.2 0.0 0.671 Utr 2.0 10.000 17.617 to 150.0 0.0 2.000 0.0 H.5 2.5 0.0162 0.0 12.000 0.195 Vel = 2.27 H.5 0.0 0.671 Utb 17.0 2.000 17.812 to 150.0 0.0 17.000 0.0 T.24 2.5 0.0162 0.0 19.000 0.308 Vel = 2.27 T.24 -0.72 0.671 Utr 2.0 2.000 18.120 to 150.0 Utb 17.0 19.000 0.0 1.25 1.78 0.0086 0.0 21.000 0.181 Vel = 1.61 T.25 -0.31 0.671 Utr 2.0 1.000 18.301 to 150.0 0.0 2.000 0.0 T.26 1.47 0.0060 0.0 3.000 0.018 Vel = 1.33 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams . Uponor Page 7 RIVER TERRACE -Two Head Calculation (H.1 & H.4) Date 2/21/2017 ` Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.26 0.31 0.671 Utb 17.0 10.000 18.319 to 150.0 0.0 17.000 0.0 T.33 1.78 0.0086 0.0 27.000 0.232 Vel = 1.61 T.33 0.85 0.862 Utb 17.0 1.000 18.551 to 150.0 0.0 14.000 0.0 T.34 2.63 0.0053 0.0 15.000 0.079 Vel = 1.45 T.34 3.30 0.862 Utb 17.0 15.000 18.630 to 150.0 0.0 14.000 4.331 T.37 5.93 0.0236 0.0 29.000 0.685 Vel = 3.26 0.0 5.93 23.646 K Factor= 1.22 T.22 2.57 0.671 Utb 17.0 12.000 13.125 to 150.0 Utr 2.0 19.000 0.0 H.7 2.57 0.0170 0.0 31.000 0.527 Vel = 2.33 H.7 0.0 0.671 Utr 2.0 7.000 13.652 to 150.0 0.0 2.000 0.0 H.10 2.57 0.0170 0.0 9.000 0.153 Vel = 2.33 H.10 0.0 0.671 Utb 17.0 5.000 13.805 to 150.0 0.0 17.000 0.0 T.32 2.57 0.0170 0.0 22.000 0.374 Vel = 2.33 T.32 0.73 0.862 Utr 2.0 13.000 14.179 to 150.0 0.0 2.000 4.331 T.34 3.3 0.0080 0.0 15.000 0.120 Vel = 1.81 0.0 3.30 18.630 K Factor= 0.76 T.24 0.73 0.862 Utb 17.0 2.000 18.120 to 150.0 0.0 14.000 0.0 T.21 0.73 0.0005 0.0 16.000 0.008 Vel = 0.40 0.0 0.73 18.128 K Factor= 0.17 T.25 0.30 0.671 Utb 17.0 11.000 18.301 to 150.0 Utr 2.0 19.000 0.0 H.9 0.3 0.0003 0.0 30.000 0.010 Vel = 0.27 H.9 0.0 0.671 Utb 17.0 9.000 18.311 to 150.0 0.0 17.000 0.0 T.26 0.3 0.0003 0.0 26.000 0.008 Vel = 0.27 0.0 0.30 18.319 K Factor= 0.07 T.38 0.86 0.671 Utb 17.0 8.000 18.405 to 150.0 Utr 2.0 19.000 0.0 H.18 0.86 0.0022 0.0 27.000 0.060 Vel = 0.78 H.18 0.0 0.671 0.0 9.000 18.465 to 150.0 0.0 0.0 0.0 H.17 0.86 0.0022 0.0 9.000 0.020 Vel = 0.78 H.17 0.0 0.671 Utb 17.0 11.000 18.485 to 150.0 Utr 2.0 19.000 0.0 T.33 0.86 0.0022 0.0 30.000 0.066 Vel = 0.78 0.0 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 8 • RIVER TERRACE-Two Head Calculation (H.1 & H.4) Date 2/21/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.86 18.551 K Factor= 0.20 T.36 0.73 0.671 Utb 17.0 7.000 14.076 to 150.0 Utr 2.0 19.000 0.0 H.16 0.73 0.0017 0.0 26.000 0.043 Vel = 0.66 H.16 0.0 0.671 0.0 10.000 14.119 to 150.0 0.0 0.0 0.0 H.13 0.73 0.0017 0.0 10.000 0.017 Vel = 0.66 H.13 0.0 0.671 Utb 17.0 7.000 14.136 to 150.0 Utr 2.0 19.000 0.0 T.32 0.73 0.0017 0.0 26.000 0.043 Vel = 0.66 0.0 0.73 14.179 K Factor= 0.19 T.41 2.22 0.671 Utb 17.0 1.000 23.070 to 150.0 Utr 2.0 19.000 0.0 T.40 2.22 0.0130 0.0 20.000 0.260 Vel = 2.01 T.40 0.0 0.671 Utb 17.0 6.000 23.330 to 150.0 0.0 17.000 0.0 T.39 2.22 0.0130 0.0 23.000 0.299 Vel = 2.01 0.0 2.22 23.629 K Factor= 0.46 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087