Loading...
Report (32) r», 7409 SW Tech Center Dr,Ste.145 f Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 nas 503.143.3799 Special Inspection Final Report Date: March 13,2017 Job#17-6946-03 Permit#BUP2017-00043 Mail To: Project: SPEEDRACK WEST CED GREEN TECH 1458 NE 25TH AVE. 14160 SW 72ND AVE HILLSBORO,OR 97124 STE 150 TIGARD, OR 97224 PO#58876 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Anchors-Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. iA1*iU . Approved by: Bob Brown/President BB/KP P,u,! it ,nal!‘ \A'LCs.t1 1,,.. l i`s,is i.' le'll ik, „1 ACCREDITED