Report (32) r», 7409 SW Tech Center Dr,Ste.145
f Tigard,OR 97223
Ph:503-443-3799 Fax:503-620-2748
nas
503.143.3799 Special Inspection
Final Report
Date: March 13,2017 Job#17-6946-03
Permit#BUP2017-00043
Mail To: Project:
SPEEDRACK WEST CED GREEN TECH
1458 NE 25TH AVE. 14160 SW 72ND AVE
HILLSBORO,OR 97124 STE 150
TIGARD, OR 97224
PO#58876
To Whom It May Concern:
ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
For the following:
Anchors-Expansion
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
iA1*iU .
Approved by:
Bob Brown/President
BB/KP
P,u,! it ,nal!‘ \A'LCs.t1 1,,.. l i`s,is i.' le'll ik, „1
ACCREDITED