Loading...
Report ;c iao 1( - Doi-737 or) 6411.51/dv 16110 SE Goosehollow Drive Butler Damascus,Oregon 97089 (503)658-0200 consulting Inc. (503)658-0204 Fax ENGINEERING FIELD DIRECTIVE #1 To: Sage Built Homes Project: Maple Plan,Balfour Parcel 2 From: Mark Butler Subject: Garage Pier Date: March 10,2017 BCI Job No: 156-0911-10 This Engineering Field Directive is issued to Sage Built Homes for the single family residence identified as the Maple plan under construction on Parcel 2 at the Balfour Parcel 2 partition on SW Frewing Street in Tigard, Oregon regarding the height of the garage piers. The plans call for the shear walls on the sides of the garage doors to be a maximum height of 5' by pouring taller concrete stem walls. The stem walls were not poured tall enough resulting in a 6' tall shear wall. The shear walls will need to be reinforced by adding 7/16" OSB sheathing on the inside face attached with 8d nails spaced at 3" on center at panel edges and 12" field. The HDU8 holdowns installed at each end have sufficient capacity and can remain. Please do not hesitate to call if you have any questions or need additional clarification. Respectfully Submitted, � �p PROFESS Igj j gR C ONSULTING�II C. s ,_N c.� It ‘<' 14855N- .44, 4855 - 4... ,i 0 i, 4 7,c, __ Mark E. Butler,P.E., S.E. OREGON `�'o/. eke 4 President -74,4„ '4 ' � E6U I EXPIRES 12-31-2017 I