PFI2017-00014 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT _ • COMMUNITY DEVELOPMENT Permit#: PF12017-00014 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/02/2017 Parcel: SEG970 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 11565 SW Walnut Street. Relocate pad-mount transformer and secondary pedestal for Washington Couty/City of Tigard road widening project @ SW 116th Ave and SW Walnut Street. SEG 970 Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX. Applicant: DAVID DROCHNER 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-736-5763 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12017-00014 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. call Ken Fisher at 503-816-6146 or Kenny@tigard-or.gov PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard FEB 0 2 2017 PUBLIC WORKS — ENGINEERING CITY OF TIGARD = LANNING/ENGINEERING Public Facility Improvement rovement (PFI Permit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) �TYPE 1–Franchise Utility Work Check one: 1A Utilities ❑Sidewalk/driveway approach ❑Street improvements performed by NXVNI, PGE Detailed description: and/or utility agency. Relocate pad-mount transformer and secondary pedestal for Washington ❑ TYPE 2-Sidewalk/Driveway/Sewer Work performed for the purpose of: County/City of Tigard road widening project @ SW 116th Ave. &SW Walnut St . Sidewalk installation or repair. • Driveway approach installation Property address/location(s): and/or repair 11565 SW Walnut Street,Tigard, OR 97223 �� 1 �� • Sanitary sewer lateral installation and/or main line tap Applicant: Portland General Electric El TYPE 3–Full scale Development PP Work performed with Land use Address: 10800 SW Avery Street approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: 503-736-5763 Prere Coord n.com • Subdivisions or Partitions Phone: Email: q @P9 Contact name: David Drochner Phone: 503-736-5763 • Street widening • Mainline installation for Sanitary N/A sewer, Storm sewer, Tigard water Contractor: and/or Tigard Water Service Area CCB#: Expiration: Address: SUBMIT COMPLETED APPLICATION TO: City/state: Zip: City of Tigard Phone: Email: Planning/EngineMng 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 47223 Applicaticnrs for"minor work in right-of-wry" Engineer: David Drochner only may be emailed to: Avery Address: 10800 SW Ave Street tow- rmitsQtigard-or.Qov City/state: Tualatin, OR Zip: 97062 Phone: 503-736-5763 Email: PreregCoord@pgn.com Case `zon^ 00014N . Contact name: Application submittal fee: Additional fees: Estimated value of work is required(if over$5,000):$ Application accepted: (widen the public right-of-way) By:_ & Date: % t Is work related to a LAND-USE DECISION? ❑ Yes 9 No Application reviewed: If so,please specify(MLP,SDR,SUB,etc.) case#: By:%�6;SL­- Date: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Yes d No By: 1—cz, _Date; If so,please specify(BUILDING PERMIT)case#: 1.\CURPLNWast.n\t+ndUxAppliations Re,09/26/2016 Cityof Tigard • 13125 SW HallBlvd. • Tigard,Oregon 97223 • wu�utigard-or.gov 6 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * Vith the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with writren authorization from the owner or an agent of the owner. '11he owner(s)must sign this application in the space provided or submit a written authorization with this application. franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any,recorded deed restrictions that may be attached to or imposed upon the subject 12ropeM. • If the application is granted,the applicant will exercise die rights granted in accordance with the terns and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on dais application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of die application,including the policies and criteria,and understands tie requirements for approving or denying the application. Brian Moore Applicant/Au horized Agent's signature Print name Date SIGNATURES of each owner of the subject property,if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 Six'Hall Blvd. • Tigard,Oregon 97223 6 www.tigard-or.gov 503-718-2421 6 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: APPLICATION FEE Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY Part 2: Allnon-water system improvements CONNECTIONS,ETC. Engineer's estimate X 5%(less$300.00 submittal fee) (work in the right of way) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE ❑ Dimensions Part 3: All public water system improvements ❑ Street Name Engineer's estimate X 12% ❑ Site Address PFI Permit Fee Exemptions: FULL SCALE DEVELOPMENT There will be no permit fee charged,or assurance required (Subdivisions/Partitions and Sweet Improvements) for the following types of work: • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (6 sets,24x36 or 22x34) • Weep hole repair ❑ Cover—Site,Vicinitv,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc) • Lawn sprinkler system installation or repair ❑ Street(Plan,Profile) • Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile) • Planter strip landscape maintenance ❑ Water Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A cash assurance may be required per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140.(customer deposit) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(.Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard 13125 S%X'Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SAMPLE SKETCH: Edge of Pavement �— Ditch Streetlight 1 —-—-—-—-—-—-— —r--- Rijn r%ldn I I T`�ia'pelw'ei rlir"' Existing House Existing Drivewy a 1 I rl �I 1 o� a I ( I v ! y , o . Existing Shop L Powerpole I 1 = ! d ! a I 95' 1 -------Fopert}i Lme-------- I 1 ! I Fire Hydrant(FH) I 1 I Scale: 1 I I � � I I I ! � MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): Nortb arrow Property lines &dimension Slope of property Street &street name(s) Existing building,structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard - 13125 S%V Hall Blvd. - Tigard,Oregon 97223 - wwwtigard-or gov - 503-718-2421 0 Page 4 of 4 Drrksen ' Nefure Perk Q - Woodard Perk THINK SAFETY SAFETY FIRSTI 1114"; WR CHECKLIST YES COMMENT HOLEDIGGER BOOM ✓ BACKHOE ✓ PGE TRENCH ✓ LOCATES ✓ STAKING V/ OTHERS FLAGGING ✓ TREE TRIM LANDSCAPE EASEMENT PERMITS CITY OF TIGARD TRAFFIC PLAN CUTSHEET UG CIR. VER. TRANS SHUTDOWN CUST SHUTDOWN DOOR HANGER CONTACT COMPANY PHONE ICELL DATE ITIME PGE CONSTRUCTION DRAWING A4" M2240462 DESCRIPTION RELOCATE PM TRANSFORMER. nrcE SW 116TH AND WALNUT ROAD WIDENING SEC PEDESTAL,INTERCEPT PGE / LOCATION 11565 SW WALNUT ST,TIGARD EXISTING CONDUIT CREATED BY DAVID DROCHNER (503-724-0304) DATE 1/16/2017 PORTLAND GENERAL ELECTRIC CO-ALL RIGHTS RESERVED 0 15 b I!D F«t WL 1 PDd4: trey stall: 644PGE PAD VAULT W/NON-SLIP LID ,tsa INSTALLED BY OTHERS 1 P 25KVA PADMOUNT TRANSFOMER 6 CUST,23 PEAK LOAD C 33 r..- rStx w1K WL2P0""': - W4 Remove: ;6 C1Al 1P25KVATRANSFORMER 4242 PAD 1 5 cn711W r �� t a roA>_ .FMK' 'WoLm-61 C2 1.03A �1PM Vt. C21-03D F i IWLIPD-1311 c1 - Install: raclla y • SECONDARY PEDESTAL INSTALLED BY OTHERS ♦ _ INTERCEPT SVCS TO 11545 AND 11525 SW WALNUT INTERCEPT CONDUIT TO VT47 Rem SECONDARY PEDESTAL B{ c Na1'- INTERCEPT EXISTING 4'PRIMARYT-47 I-7 PLd7: RUN EXISTING SECONDARY INTOVid7 '�°°� InNall: RUN NEW 1350 AL TX SEC IN P CONDUIT 504CONCRETE VAULT WITH NONSLIP UD FROM PD-44 TO VT47 INSTALLED BY OTHERS WL 5 3PLK:E PIT. INTERCEPT 12 DIRECT BURIED PRIMARY WITH PUCEPIT 11•IA1111 LN PD11.MAP C11-0SA 12756 SW 114- PD-M: CLOSE OPEN INSTALL OPEN TO DE-ENERGIZE C 7 AL PD-1519 C 25 73694 P E LEGEN THINK NEW PDE FACILITIES TO BE INSTALLED SAFET, FIRST TENSION IN LBS. .ter.r",µr..r,.. -.... A5UAF Vfa"pcnTroa r+f tf vr°r ATmNs c°aafc Ffc CWYPu1 Dkon<a CoMuhhl-350� 77 MrMlw Howes.eanua.oa.ar"rcua Iria+a h No WM No Lub♦ Q GenMalFawnwi bN PD-Mto VT-17 350' 4' 105 ]H8 ..awes F.uurm er cus+c.m NO�TIETV M � PD-M to splice PR 120' 4' Al. 32 32 V rMawme.rorF_l_' a.ttv+aum DE�7ION PROAL"IS DEWA AWW 127/1017 n 302 t0)000t t000pp.S.3 Mx3.D p PD-44to VT-47 40 4' 17 30 APPROVEDBY THEPGE PRO/ECTMA/IAG(RIW-47 to PD-1531 220' 4' 126 126 FAGLrtIE98WttaTN4VYLNUTROADYnDENiNc -47 LO PD-1532 20D' 4' 241 120 -__---_7ro 115655WWalnut 14tl 3' 66 71 _---__- rw.awmaarAUAoarcui� an / 1t3m IiW wAlNI1T ST.iI(iRD.OR.97x71 mtfmta 1 \ 8r1111Er a YWnM Raaa Nte.ni Maple W FsaeeF.i- PD-1532 to 115255W Wa101rt 65' 3" ld/O AL T% 23 33 ----- wconesar R y,ff+ PD-1532 to 11545 SW W.1— SD 4" ld/OALT% 18 1H c°"01^novoFa.rrrA+�arm+own Tov�tFm-xu twnr1.�1a,� PA9uN0TON mg— I 2 VT-4]to Pl-M ]s' z" 11-1/0ur% u 50 ______ raa'^D®.enT.umrrairsraMrn `a""� " p1�b111wp11y LMWDIXiOCHNEl 5017M 030. 6.6+6 VAULT WITH 6'TERA41-DUCTS wlwuFDRMDI —FACE PD-1531: PF300 SECONDARY SPLICE PEDESTAL arENINc IN TMNSfLxnlf.eAD ON LJOI 1®HTAt�inDl r iuLTiA`TDDF A siwcruE o B�FwV sus:Fn�« OF Lent a'e,...srAa w cirrF. ,,,� aBBesTAF u+N Wml r�Dhra. «vAUT cu«.Nw�Nima� TIAw rro sur.n � /��rRau cRAOE wFvl W _ ..x w LVILNR arP P � IAILUscvE ARu I I` U PD-44 + O C 0 ;3 mo inss sw wNMn ao - r%i.Nis`°' T 1 CONgREN— L A I -�CRthlD KKK '✓ � :�� fv u�.N 1---` •- w r nlRla�m r a NSI M01PMI�HYq l SECONDARY PEDFSIALS(PFa00)10 BE INSTALLED ON PROPERLY TINES WITHIN!HE UlllflY EASEMENT AND AT FINAL GRADE.ALTERNATE LOCATIONS MUST SE—.—BY PGE ANO WILL BE NOTED ON THE SKETCH COST FOR THE RELOCATIONS OR ADIUSTMENLS OF FEOESTA MU Bf THE RESPONSLBIIlry OF THE REQUESTING PARTY(BURDEROfVE CMA).PGE APPROVALS OF INSTALLATION WILL BE BASED ON FINAL GIUDE AND LOCATION CR WA SET BY TfIF DEVELOM OR HIS AGENT. 1-3'TO 11565 SW WALNUT NOUN 0 Q 1.'i0 Ors PD 1537 TO 0 PD�6 0 SOI/IN 0 C I-7 To PL-e, AS-BUILT VERIFICATION & NESC VIOLATIONS CORRECTED STREETLIGHT O O iNn dxumenl--6'--FIELD CovinMron FonllLoll: CCh: oO wsfRc er GeTwml FolemLm: Dat !or!Id cofdnwikn cho N'TO cowouns SDPMENG REVIEW: ASRINLT BY DESIGNER:R. PD-1531 TF )2617 KA'R PIIS ctxRIT 070001 "� 1000006566 No M2010167 REL � \ OC.UG FACLLrnK SW 116TH A WALNUTM7 ROAD DENNJG /I 5' -47 TIGARD-133677,13KV IIrF1ix17 sores VAULT PGE LonroN 11565 sw WALNUT RD,TK.ARD rs r aN SW I161H 6 WALNUT ROAD WIDENING,RFLOC.TIG FACILITIES CIaWD W«.wRN SHER WASHINGTON C7F-0]R « H'MSF(SOLI DAVID DROCHNER 776-0301 1.SCEIAEFER 0 FW MHO GENERAL ELECFRK 0-ALL&OHM W$ER O Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads(less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 v 1 N c 3 o N $ N $N N o Single Flagger Operation °« m If 1 for Low Volumes - �1 (optionaq o a N (ADT<400) 7 0 BE rn 1A0°a' PREPARED ONE LANE • ROAD b e H e A c A i TO STOP AHEAD r 8 1 8 °' I F 1-— — ♦_ 1 7 N b I ♦ •. ♦ I ROAD �D I '-, I WORK ot 1 C K 8 K 6 1 A I--I I AHEAD n Imo , V. I N I A w""'°°""°� in 18 -- `6' • I rano' SW 1 (D • A 1 1 mile 1 -n C max. p� FALB f;Q B ml- 5 wIL j Buffer Protection Vehicle ROAD �, w/TMA Moth hOOpti naqSee v r 4 WORK Imn � AHEAD BE ONE LANEPRE1 AROAD HEAD TO STOP Two Flagger Operation Nc �, (Optional) Oco Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted Spadn¢Between Suns "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 RpAD WpRK AHEAD ELAN1 1 ( ROAD AHEAD B BE PREPARED ro � e A (a •n IA oKE ROAD loon.Mex BE ARM AES ROAD 1 TO STOP WORN A B B C AHEAD Buffer,\ ' 1001L M—+i C B B A I T ROAD gE i WORK PREP ' 1001E Ma AHEAD TO Sipe IANE � NERD � A Tt B PREP ro srpP B (o0-0 LANE 1 1 C AHEAD ROAD WORK AHEAD September 2016 Chapter 5 Agnes Kowacz From: David Drochner <David.Drochner@pgn.com> Sent: Thursday, February 02, 2017 8:09 AM To: Prereq Coord; ROW Permits Cc: Mike McCarthy Subject: RE: NEW City of Tigard permit application, 11565 SW WALNUT ST, PGE JOB M2240462 Attachments: M2240462 CITY OF TIGARD Public_Facility_Improvement_Permit (Amended) 201....pdf; M2240462_SKETCH.PDF; M2240462_FLAGGING.PDF Categories: Misc. Correspondence Thank you, Pam. This work is part of the Walnut Street Improvement Project by Washington County/City of Tigard. Thanks, David Drochner Transmission Engineering Office: (503) 736-5763 Email: David.Drochner(a),p ng com Portland General Electric From: Pam Baldwin On Behalf Of Prereq Coord Sent: Thursday, February 02, 2017 8:04 AM To: ROWPERMITS@TIGARD-OR.GOV Cc: Prereq Coord; David Drochner Subject: NEW City of Tigard permit application, 11565 SW WALNUT ST, PGE JOB M2240462 Good morning, Attached is the City of Tigard permit application,job sketch and TCP for PGE Job M2240462. If you have additional questions please contact David Drochner at 503-736-5763. Thank you, Pam Baldwin— Prerequisite Line Coordination Portland General Electric 10800 SW Avery St.,Tualatin,OR 97062 %9: (503)612-6107 : (503)612-61501 Pam baldwin(a)pgn.com 1