Report (43) .44ST A 1 C - 00)--Es-
1 1 3 I 0,,,,51( /oar_
U ,S-
1133C ,SwJor_
coring
MU\TEANtiNC. !(// 2 „
CONSULTING ENGINEER "t «
3(.-,i R 016
11
SI
3204 NE 1661h Avenue I Vancouver,WA 98682 ON
corinam(a comcast.net 1503-313-3011
Lateral Analysis
For
Riverside Homes — Plan 2885 A
Walnut Ridge Lot 9—13330 SW Doe Ln
Tigard, OR 97223
May 29,2016
���p PROpS.
,N4 4' �o
1 49 78PE 'A 37
OREGON
001' l?, Nq"'
9'kA MUS``
Expires: t2`V`1(i)
Job No:15116
LIMITATIONS •
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L-15
Lateral Analysis
For
Riverside Homes— Plan 2885
Job No:15116
LIMITATIONS
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L- 15
Corina
MU\TEANtlNC.
CONSULTINGJENGINEER
3204 NE 166th Avenue I Vancouver,WA 98682
corinam(a comcast.net 1503-313-3011
STRUCTURAL DESIGN CRITERIA
Governing Code: 2012 International Residential Code (IRC)
2012 International Building Code (IBC)
Dead Load:
A. Roof 15 psf
5. Floor 10 psf
C. Exterior walls 10 psf
D. Interior walls with gypboard each side 5 psf
Snow Load:
A. Uniformly distributed snow load ...25 psf
Floor Live Load: 40 psf
Wind Load:based on ASCE 7-10 CH27 MWFRS Directional Procedure
A. 3 Second Gust Wind Speed V=126 mph
S. Importance Factor 1=1.0
C. Exposure B
D. Topographical Factor .Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
Seismic Load—based on ASCE 7-10 Section 12.14
A. Mailed-Sectral Acceleration for start periods.....Ss=1.0
S. Mapped Spectral Acceleration for 1 sec. period 51=0.34
C. Ductility Factor ...R=6.5
D. Seismic Design Category D
Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 20012 Table 1806.2....Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
Concrete:
A. 28 days design strength F'c 3000 psi
B. Reinforcing bars ASTM A615, Grade 60
IIIcarina
MUNTEAN� Nc.
CONSULTINGJENGINEER Plan 2885
Job No:15116 Sy:
CM
3204 NE 166^Avenue 1 Vancouver,WA 98682 Date:Nov 2015 Sheet: L-1
cortnamaacomcanLnet 1503-313-3011
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2•SDs
SEISMIC BASE SHEAR V:= R •W (EQ.12.14-11 with F=12)
Ss mapped spectral acceleration for Ss •-• 1.00
-
short periods(Sec.11.4.1) from USGS web site
Ss mapped spectral acceleration for
S1:= 0.34
1 second period(Sec.11.4.1)
F4 Site coefficient(Table 11.4-1) F4 1.1 Based on Soil
F„ Site coefficient(Table 11.4-2)
F := 18 Site Class D
SMS F4•Ss SMS= 1.1 (Eq.11.4-1)
SM1 Fv'S1 SM1= 0.61 (E q.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS 3'SMS SDS = 0.73 > 0.50g
SEISMIC
2 CATEGORY
5D1 3'5M1 Spi = 0.41 > 0.20g D per Table 11.6-1
1.2•SpS WOOD SHEAR PANELS
V:= •W
R:= 6.5 Table 9.32.2
R
1.2.0.73
V:= 6.5 W V:= 0.135•W
12.4 Seismic Load Combinations
E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135.W 0.123•W WOOD SHEAR PANELS
corina
MUNTEANtiNC.
CON SU LTI NGf ENGI NEER
Plan 2885
3204 NE 166'"Avenue I Vancouver,WA 98682 Job No:15116 5y:CM
corinarrr comcasLnet 503-313-3011 Date:Nov 2015 Sheet L-2
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
11 �' - 7.4
paf psf
Wind base
• Shear
Length L:= 52-ft
Height Ht:= 24-ft WIND:= L•Ht•(11.psf+ 7.4•psf)
SEISMIC WIND= 22963.2 lb
Fr Zroo-\\F\
F2 — Wfloor
Wavall Seismic
base Shear
Aroof 52•ft•40•ft Aroof= 2080ft2
Afloor 43•ft•40•ft Afloor= 1720ft2
Wwal14 4.52•ft•20•ft Wwalls =4160 ft2
SEISMIC:= (Aroof'15•psf+ Afioor•15•psf + Wwalls•10•psf)•0.123 SEISMIC= 12127.8 lb
WIND GOVERNS DESIGN
III carina
MU NTEAN NC
CONSULT!N GI ENGINEER
Plan 2885
Job No:15116 By:CM
3204 NE 166^Avenue 1 Vancouver,WA 98682
corinam(alcomcastnet 1 503-313-3011 Date:Nov 2015 Sheet L-3
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:= .00256•KZ•KZt•Kd•V2•I (Eq.6-15)
EXPOSURE B
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I := 1.0
TOPOGRAPHICAL FACTOR KZt:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 01-15' KZ:= 0.57 qZ:= .00256•KZ•KZt•Kd•V3s2.I qz= 19.69
(varies/height)
151-20' KZ:= 0.62 qz:= .00256•KZ•K2t•Kd•V3s2•I qZ= 21.42
201-251 KZ:= 0.66 q,:= .00256•KZ•KZt•Kd•V3,2.I qZ= 22.8
251-301 KZ:= 0.70 qz:= .00256•KZ•KZt•Kd•V3s2.I qZ= 24.18
corina
MUNTEANttNC
CONSU GTI NGI EN C IN EEC
Plan 2885
3204 NE 166''Avenue 1 Vancouver,WA 98682 Job No:15116 By:CM
corinamna comcast.net 1 503-313-3011 L-4
Date:Nov 2015 Sheet
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= 92•GCp G := 0.85 Gust factor
C, pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
O'-15' WINDWARD PH,:= 12.4•psf•0.85.0.8 P,= 8.43 psf
LEEWARD PL:= 12.4.psf•0.85.0.5 PL = 5.27 psf
15'-20'
WINDvIARD PW:= 13.49•psf•0.85.0.8 PW= 9.17 psf
LEEWARD PL:= 13.49•psf•0.85.0.5 PL = 5.73 psf
20'-25'
WINDWARD P„,:= 14.36•psf•0.85.0.8 PH,= 9.76 psf
LEEWARD PL:= 14.36•psf•0.85.0.5 PL = 6.1 psf
AT ROOF
O'-lS' WINDWARD - PN,.— - I-,-3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL = 6.32 psf
15'-20'
WINDWARD PW:= 13.49•psf•0.85.0.3 P„,= 3.44 psf
LEEWARD PL := 13.49•psf•0.85.0.6 PL = 6.88 psf
20'-25'
WINDWARD P,:= 14.36•psf•0.85.0.3 P„,= 3.66 psf
LEEWARD PL:= 14.36•psf•0.85.0.6 PL = 7.32 psf
25'-30' WINDWARD PW:= 15.23•psf•0.85.0.3 PW= 3.88 psf
LEEWARD PL:= 15.23•psf•0.85.0.6 PL = 7.77 psf
111 coring
MUNTEANt,Nc
CONSULTINGJENGINEER Plan 2885
Job No:15116 By:CM
3204 NE'66.Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-5
corinamOComcast.net I 503-313-3011
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
3.44 6.88 Assume
Cp-0.3 psf pg
\'1 6 := 35
yl ' cp--o.6
8 ft
9.17
PO 6.1
PO
Mean Roof Height
18+ 22
= 20
2
Loads at Roof roof-ave
Windward 3.44•psf•5.5•ft= 18.92pIf
Leeward 6.88•psf.5.5.ft= 37.84 plf
Wall loads at upper level at main level
Windward 8.43psf•4•ft= 33.72pIf 8.43•psf•8.5•ft= 71.66pIf
Leeward 5.73•psf•4.ft= 22.92pIf 5.73•psf.8.5.ft= 48.71 plf
M%.%? tak9S Roof A 04440 L-6
rt -r n
+ II
II
II
II 16II
IIyft1a
6 Il 7
I I II
C 7 1--, 1-1)--J 1 *
•
PRE MFG. MVP; O 24' O.C. `n
GIRD-
r ii s ��� w
4p .., �••♦•;•;•••*l ••. ••;+;,,•-,•;•4•••••t•;*•••t•w•tw Y
• • �
••'►♦ ••••.'®••••• NLEI•.•••••••••
•
4•S••••••••"0 ••,••••♦••••••r
ct •• .••••••••4�•••1••••••••••••/ A k-
►•ti+• - . 1••••••♦
N • .Iw• '.�'♦ .•!♦t•t•t•t•t•••
Ad.— e ;•i•••i•..+�•�•i4i►•i•i•i•i•q pO Ma . •••♦•v • +••••i�' •••••••••itt• t••.
I.
•
•
•
4%4.•••••••• �►,••t• k ._..-
�•► •••••�1••�
441147-4ort.;•11/./
rill
0
RIDGE -
Al
r••••••\
r�•••••k•••••\\
/0+ ••1►••? ••\
A r•••• ••••11••••\
d'r ••►••S♦••00•tt••••••\
r•••• ►•�•• ►••••••••♦
-•••4.#••4-a.S.c.V=tua-au-� s+a
r ••••••^►�•^ �:"1►•• -•-•1•••• " ••\
r•••••••� •••••13E311+, 41• A,••• ••'••• •\
r •••••• ••'r .6• Y►••••'•"•••♦•I•••••\
MFG. 0 24 O.C.
_ I
••A r
F.• Y 14-
c C ir-
-441:VnNlell‘ I
M/,�� + PR MFG. 1t, -,,i.:. O
((W��pI�t'—d' RA-,...
® `1a. ROOF ' Gl7EST 4 AT
JACO
PRE. KIEll
MFO. W 2t-g liMSED Milk.
® g
RVS^�ES NLEI
‘Z-61. RAISEDt -4 I-
A 5 jr
L-7
2-5-1blell&
- ..I I _a _... I I —EIS
, !pi0 0
III
i_,I ,__, ewTM
III „It___.) Ii____
MASTER
eEDRooM
BEDROOM # i 4-
0
IIC7� -
o 111 ty ''tl'��
111 11I c
r�
r- _1 -
I"."•Th
1.....,±...........4
ri IA l J{{�� IIAUNORY V 4"..
'�. PISS .4 ttt - �P 11 PAM
t 3 Pik 0
i ( PMS
Ar
• LOFT
0 o 0
BEDROOM BEDROOM
BE
THREE FOUR
1 a r 1
4 C
(EGRESS)SLOB. (EfESS)SLOB. M e030 PIC.
_,.. rii.• 1
44/Ott' II*l��Q
►D WAG'S e. L-8
—61414 L'elgV
of
PATO 3a 14014 �`
WillgariMial
-- .........._
,, -'71----=,,,
,,
.k. .....,_
DINING
I ROOM GREAT
ROOM
PCOKET Fm=41
ocFlc¢, 1 11 O
\ II ,.�
1ICAL --
�__�J \or. l I v
r'-'h R
I H {j rrA'L 'a
1 II ��_ ; --I+L
i n -a'- _
CI
II I t Q
it II KITCHEN I _-
iil
""L
lil I
iirrMl
I___I.__ I� 1 1 1 1 1 1 lJ 11 i i i i y
4 C;(17 01 14
TYPICI U
o wA_
,_�_ DETAIL
---
GARAGE I
4 :
I i
Q - Iii
- - I.. €0Y€R - --r-
r
—j--- I
....--.....\\_j.
L
I
oEN II
II {
nn (�, u
` � (.J ' it ° li
11.11$
ammo? I, i I 14
4 6
-t2a . r
1.114C01°
*414O
coring
MUNTEANtiNc
CONSULTINGIENGINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-9
connam(alcomcast.net 1 5O3-313-3011
SHEAR WALL DESIGN
PdI Pdl
Wdl Jo.
(V) P:= wind
V:= seismic
h
L R=Hol down
V Force
Based on 2012 IBC Basic Load Combinations 1605.3.1
0.6D+ W (Equation 16-11)
0.6•D+ 0.7•E (Equation 16-12)
Overturning Moment: Mot:= P•h
Resisting Moment: Mr:= 0.6•(Wdi + WWaii)•(L) +
+ 0.6•Pd•L
Mot— Mr
Holdown Force R:_
L
coring
MUNTEANtINc
CONSULTINGIENCINEER Plan 2885
Job No:15116 Sy:CM
3204 NE 166.Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-1 0
corinarn®comcast.net 503-3t3-3011
Left Elevation Exterior Walls
Second Level
Wind Force P:= 2260.lb P= 2260 lb
Length of wall L:= 5•ft+4•ft+ 19•ft L= 28ft
P
Shear v:= — v= 80.71 plf A
5
Overturning Mot:= P•8•ft 28 Mot= 3228.57lb•ft
Moment
(5ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•5•ft
Moment
Mr= 26251b.ft
Mot— Mr
Holdown = 120.71 Ib
Force 5 ft
Main Level
Wind Force P:= 4660.1b P= 46601b
Length of wail- L 14 ft+ 10 ft+ 8•ft _-___ = L= 32ft
P
Shear v:= — v= 145.63pIf S
8
Overturning Mat:= P•9•ft 32 Mot= 10485lb.ft
Moment
(8 ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•17•ft)• 2 + 0.6.800•Ib•8•ft
Moment
Mr= 7680lbft.
Mot— Mr
Holdown = 350.63 lb
8'ft
Force
corina
MUNTEANtiNc.
CONSULTINGIENCINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'r Avenue 1 Vancouver,WA 98682 Date:Nov 2015 Sheet L-11
corinem(alcomcast.net 503-313-3011
Front Elevation Exterior Walls
Second Level
Wind Force P:= 2373.1b P= 23731b
Length af wall L:= 3.5.ft+ 3.ft+ 3.5•ft+ 3.5.ft L= 13.5ft
P
Shear v:= — v= 175.78pIf B
3.5
Overturning Mot:= P•8-ft•— Mot= 4921.78lb-ft
Moment 13.5
(3.5•ft)2
Resisting Mr:= 0.6•(15.psf•4-ft 1- 10•psf•8•ft)• 2 + 0.6•600-1b•35-ft
Moment
Mr= 1774.5lb.ft
Ma— Mr
Holdown = 899.22 lb
Force 3.5 ft MSTC48B3
Main Level
Wind Force P:= 2988 lb P= 2988 lb
Length of wall L:= 2.25•ft+ 2.25-ft+ 1.5-ft+ 1.5.ft L=7.5ft
2.25.3.5= 7.88
P
Shear Wind v:= L v= 398.4 pIf D
2.25
Overturning Ma:= P-7.88'ft'75 Mot= 7063.631b•ft
Moment
(2.25•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft) 2 + 0.6.800•lb•2.25•ft
Moment
MotMrM — 1292.631b-ft
Holdown = 2564.89 lb r—
Force
2.25.ft
HT-15
III
coring
MUNTEANtiNC
CONSULTINGIENGINEEX Plan 2885
Job No:15116 Sy:CM
Date:Nov 2015 Sheet L-12
3204 NE 166'"Avenue I Vancouver,WA 98682
corinam®comcast net i 503-313-3011
Right Elevation Exterior Walls
Second Level
Wind Force P:= 2260•Ib P= 2260 lb
Length of wall L:= 8•ft+ 5•ft+ 4-ft L= 17ft
P
Shear v:= — v= 132.94pIf A
L
4
Overturning Mot:= P•8•ft•17 Mat= 4254.121b.ft
Moment
(4•ft)2
Resisting Mr:= 0.6•(15.psf•2•ft+10•psf•8•ft)• 2 + 0.6.600•Ib•4•ft
Moment
Mr= 1968lb.ft
Mat— Mr
Holdown = 571.53 lb
Force 4 ft
Main Level
Wind Force P:= 4660.16 P= 4660 lb
Length of wall L:= 15•ft+ 8•ft+ 3•ft L= 26ft
P
Shear v:= — v= 179.23 plf B
L
8
Overturning Mat:= P•9•ft•26 Mot= 12904.62lb.ft
Moment
(8•ft)2
Resisting Mr:= 0.6.(15.psf•2.ft+ 10•psf•17•ft)• 2 + 0.6.800.113•8•ft
Moment
Mr= 7680lb•ft
Mat— Mr
Holdown = 653.08 lb
8•ft
Force
•
coring
MUNTEANtiNC.
CONSULTINGIENGINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-13
corinam(a"}comcast net 503-313-3011
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 2373-lb P= 23731b
Lengthofwall L:= 7.5-ft+ 11•ft+ 4•ft L= 22.5ft
P
Shear v:= — v= 105.47p1f A
7.5
Overturning Mot:= P•8-ft•— Mot= 6328lb•ft
Moment 22.5
(7.5•ft)2
Resisting Mr:= 0.6-(15•psf•2•ft+ 10•psf'12•ft)• 2 + 0.6.600•lb•7.5•ft
Moment
Mr= 5231.25lb•ft
Mot— Mr
Holdown = 146.23 lb
Force 7.5 ft
Main Level
Wind Force P:= 3813-lb P= 3813 lb
Length of wall L:= 6-ft+ 7-ft+ 4-ft L= 17ft
P
Shear Wind v:= L v= 224.29pIf B
4
Overturning Mot:= P•9-ft•— Mot= 8074.59lb•ft
Moment 17
Resisting Mr:= 0.6•(15•psf-4•ft+ 10•psf•8•ft)•(42 )2 + 0.6.800-Ib-4•ft
Moment
Holdown Mot Mr = 1370.65 lb Mr= 2592lb•ft
Force Oft
HTfS
corina
MUNTEANtINc
CONSULTI N C1 E NC IN EER
Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue 1 Vancouver,WA 98682
corinamRcomcast net 503-313-3011 Date:Nov 2015 Sheet L-14
Interior Shear Walls at back of Garage
Malty Level
Wind Force P:= 4069•Ib P=4069 lb
Length of wall L:= 18•ft L= 18ft
P
Shear Wind v:= - v= 226.06pIf
Overturning Mot:= P-9-ft Mot= 36621 lb•ft
Moment
(18•ft)2
Resisting Mt:= 0.6•(10•psf•12•ft+ 10•psf•9•ft)• 2 + 0.6.1200•Ib•18•ft
Moment
Mot Mr =180.5lb Mr= 33372lb•ft
Holdown
Force 18 ft
IIIcoring
MUNTEANt,Nc.
CONSULTINGIENGINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-15
corinamta}comcast net 1 S03-313-3011
WIND ON PORCH ROOF
126 MPH,EXP B w:= 6•ft•(4.43•psf + 8.86.psi) w= 79.7 plf
/ d
/
H n
II II
II
w II II
Hit its..* c j I I
I
L - � II
1 III II
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 11-ft
w•L2
M:= 2 M= 39871bft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:_ — T:= C C= 398.7 lb
L 12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w•L Nail top and bottom chord of first truss to wall with
v — v= 72.49 plf (2)16d nails at 16"o.c.(web to studs)
D