Loading...
Permit (136) CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT s. COMMUNITY DEVELOPMENT Permit#: FPS2017 00022 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/06/2017 I I`'[� g Parcel: 1S126CB00500 Jurisdiction: Tigard Site address: 9300 SW WASHINGTON SQUARE RD Project: LensCrafters Subdivision: None Lot: None Project Description: Fire sprinklers-Modification of(3)sprinkler heads.Lenscrafters is located in the west end of Macy's, 1st floor Contractor: WYATT FIRE PROTECTION INC. Owner: MACY'S DEPARTMENT STORES INC 9095 SW BURNHAM ATTN:TAX DEPARTMENT TIGARD,OR 97223 7 WEST SEVENTH ST CINCINNATI, OH 45202 PHONE: 503-684-2928 PHONE: FAX: 503-684-9657 FEES Description Date Amount Specifics: Permit Fee-COM 03/06/2017 $77.99 12%State Surcharge-Building 03/06/2017 $9.36 Type of Use: COM Plan Review-Fire Life Safety-COM 03/06/2017 $31.20 Class of Work: ALT Type of Const: Info Process/Archiving-Lg$2.00(over 03/06/2017 $2.00 Occupancy Grp: M Height: ft 11x17) Stories: Info Process/Archiving-Sm$0.50(up to 03/06/2017 $5.50 11x17) Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: LT Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $126.05 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $1,489.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By Permittee Signature: ✓�a4r i Call 503.639.4175 by 7:00 a.m.for the next available inspe_ on da This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System FOR OFFICE USE 011.1 City of Tigard ReceivedAriEW -% f� 6 /7— Date/B Permit No.: i 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review D ' S' Phone: 503.718.2439 Fax: 503.598.l9f 1 +%UPI Other Permit: 4 r� Q 3 43 (_4.,- Date/B i 1I R D Inspection Line: 503.639.4175 Date Ready/By: Juris: 0 See Page 2 for Internet: www.tigard-or.gov 1 Notified/Method: Supplemental Information A/ r OF WORK 4 "V e < ' ' TYPE, REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION � r$ work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION' Total number of floors: Job site address:9300 SW Washington Square Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Lenscrafters Macy's Wa Sq Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet x REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: ( Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ',t DESCRIPTION Oil`WORK =;',''',,e- ,t work indicated on this application. Add and relocate fire sprinkler heads as required for TI Valuation: $$1,489.00 Existing building area: square feet New building area: 0 square feet � °`0 PROPERTY OWNER 1;'" 0 TENANT „,.„,,,A, '= Number of stories: 1 Name: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Light Phone:( )_ Fax:( ) - - __Ne,,,, ti '. 'APPLICANT 5', *-' e1,CONTACT PERSON 'i,,, • ,, . NOTICE- �» Business name:Wyatt Fire Protection All contractors and subcontractors are required to be Contact name:Max Colley licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:9095 SW Burnham Rd jurisdiction in which work is being performed.If the City/State/ZIP:Tigard,OR 97223 applicant is exempt from licensing,the following reasons apply: Phone:(503)684-2928 Fax::( ) E-mail:m.colley@wyattfire.com ��'� CONTRACTOR . ' w; '� � ” � ",<'` BUILDING PERMIT FEES* t :' Business name:Wyatt Fire Protection (Please refer le fee schedule) Permit fee: Address: State surcharge(12%of permit fee): City/State/ZIP: FLS plan review(40%of permit fee): Phone:( ) Fax:( ) (Due upon application.) CCB lic.:64077 Total permit fees: Authorized signature: Amount received: ,/,,?4,.,/,,?4,.d� This permitapplication expires if a permit is not obtained Print name:Max Colley ---------- Date:3/3/17 within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\FPS-PermitApp.doc Rev 01/05/2012 440-46131(11/02/COM/WEB) City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information Describelwork to be done: 1.) ❑ New 2.) Modification to sprinkler heads only: ® Addition ® 1-10 heads: No plan review required. ® Alteration ❑ 11+heads: Plan review required. ❑ Repair Number of sprinkler heads: 3 Additional description of work: hype of System(Conplete'A`B, C or D,asp applicable): A) Commercial Sprinkle . ® Wet ❑ Dry Additional Standpipes 0 Information: Hazard Group light Density 0.10 Design Area 1500 K. Factor 5.6 Sprinkler Project Valuation: $ 1489 B.) Type I- ,HoodFire Suppression System ri x Hood Project Valuation: $ .fir=� �; "xn C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ x: D.) Residential Sprinkler(Stand Alonem'System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 . ` k 7,201 and greater $404.39 . .,. r Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees xt Project valuation subtotal (see A,B &C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review(40% of permit fee): $ TOTAL: $ Plan review requires a completed application and three (3) sets of plans at submittal. Plan review fees are required at submittal. W:\Max\1112 PERMIT APPLICATIONS\Tigard App.doc Rev 01/05/2012 2 d d City of Tigard .` Permit No.: �g l7 111 13125 SW Hall Blvd.,Tigard,OR 97223 r , li: Phone: 503.718.2439 Fax: 503.598.1960 '" s /0 Date Received: 3/a//7 T I G A R D Inspection Line: 503.639.4175 a B I n� p Internet: www.tigatd-or.gov r y: (�IQJ wt d-'L�! FIRE SPRINKLER AFFIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS (1 to 10 SPRINKLER HEADS WITHOUT PLANS) Project Name: Lenscrafters Macy's Wa Sq Occupancy: Light Job Address: 9300 SW Washington Square Road Type of Construction: Suite: Contractor: Wyatt Fire Protection Phone: 503-684-2928 Number of Proposed or Altered Heads: 3 Type: $KP Veld( Hazard: Light Density: 0.10 I, Max Colley, Wyatt Fire Protection Oregon Construction Contractors Board No. 64077 certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits,beams,partitions, walls, etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. e La e a- sprinkler head will be-installed from one dr�xception• -up-to two heads from one drop_-maay--be-- installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads(see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition, I understand the following is required: • Submit(3) copies of a sketch showing the area of work within the building's structure. • Building fire protection systemstem permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. Signature: Date: 3/3/17 Print Name: Max Colley I:\Building\Forms\FireSprinklerAffidavit 071514.docx Page 1 of 1 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 9300 SW WASHINGTON SQUARE RD, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Fire Protection System FPS2017-00022 Inspection Type: Inspector: 999 Sprinkler final Chip Barnett Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor