Plans (39) STARK 4001 Main Street, Suite 305 FOUNDATIONS Vancouver WA, 98663 P: 360.566/343 -r-77 CZ:PY STRUCTURAL CALCULATIONS PREPARED FOR RAMJACK WEST flt-GEPit" 1 FOR FEB 7 2017 FOUNDATION REPAIR Cr 9291/9293/9297 SW HILL STREET -F3 UI TIGARD,OR PROJECT NUMBER: 17.017.RAM DATE: JANUARY 30, 2017 PROJECT MANAGER: DANIEL STARK, P.E. -4..Ci PROF c.5 \ 0%GINE41, ORE - v,04 GON 41MELO CCP.: 06/30/18 or: • - PY CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE Approved: / I OTC: Permit #: yyis-e a-7 - 000 S-2, Address: C1.2213. Suite #: By: —k Date: a.- I - 11 .04 STARK 4001 Main Street, Suite 305 FOUNDATIONS Vancouver WA, 98663 P: 360.566.7343 TABLE OF CONTENTS Project Background 2 Geologic Setting & Soil Capacity 3 Floor Level Survey 4 Design Calculations 5 ICC ESR 1854 (applicable pages only) 13 ION. STARK 4001 Main Street, Suite 305 FOUNDATIONS Vancouver WA, 98663 P: 360.566.7343 January 31, 2017 SFI Project No.: 17.004.RAM Mr. Ken Marquardt RamJack West 850 Bethel Drive Eugene, Oregon 97402 Re: 9291/9293/9297 SW Hill Street, Tigard, Oregon PROJECT BACKGROUND We understand that the structure is a multi-family residence and has been experiencing settlement at the rear half of the structure. A recent floor level survey(attached) indicates that as much as 2"of differential settlement may have occurred. We understand that (4) 2 7/8"diameter helical piers, (30) 2 7/8"diameter push piers, and (3) 2 7/8"diameter helical tie-backs have been proposed to help provide additional foundation support. ' ' ' A, ---..;.-......,_„------::-:::: ft ,,, - ',,,,,,.. , -. t., . - s 7 — " eas '''''' ' '1.,' AN I 'f Picture 1: Front Elevation Page 2 of 15 10• STARK 4001 Main Street, Suite 305 FOUNDATIONS Vancouver WA, 98663 P: 360.566.7343 t % k ; ., i � t � a - o2 4'4"�aV 1.x t ; . i 11 Y Z s, B.v'... �.r "'lam . S 5. :w ro , ,, . . t k x r. Picture 2: Rear Elevation GEOLOGIC SETTING The existing residential home site is located south of downtown Tigard and Fanno Creek Park. The geologic structure in the area is comprised of silty loam. According to DOGAMI, the site is not within any known landslide hazard areas. Due to the localized settling o the structure, it is our opinion that the poor drainage has resulted in an undermining of the soils under the foundation in that area as a result of the localized settling. We believe that suitable support can be achieved by installing helical and/or push piers. SUMMARY The ultimate load requirement for the helical anchors is 20,000 lbs and 54,000 lbs for the push piers. Based on the loads and geologic setting, we expect the helical anchors to achieve adequate capacity at approximately 15 - 25 feet and the push piers to achieve capacity at 40—50 feet. We recommend that helical anchors with a 2 7/8" shaft be installed to a minimum depth of 10-ft and a minimum installation torque of 2,500 ft-lbs, or refusal. We recommend that push piers with a 2 7/8"shaft be installed to a minimum depth of 10-ft and a minimum installation pressure of 3,400 psi, or refusal, using a 16.27 square inch hydraulic ram. Page 3 of 15 STARK 4001 Main Street, Suite 305 FOUNDATIONS Vancouver WA, 98663 P: 360.566.7343 PROOF TESTING Proof testing of the helical anchors and push piers should be performed and shall consist of loading at least one of the piers in five (5) equal increments up to 150 percent of the design load. The 150 percent of design load increment should be held for five (5) minutes and the displacement monitored. If the total displacement is less than 0.04", the pier may be considered acceptable. However, if the recorded strain exceeds 0.04"inches, the pier should either be deepened and retested or abandoned and a new pier shall be installed and tested. Please give our office a call if you have any questions or need further assistance. Regards, co PROF l .� ` C.'\ ANGINFpR J> ;v —,7,�940PE Daniel Stark, P.E. / r" Stark Foundations, Inc. UPII OREGON a //, Y 13.20�c Q MMELWO EXP.: 06/30/18 Page 4 of 15 030" scan tubes 41Q+ corm - ''' f ,O Second story deck P `} 17' _ } . 1, rib -2 17' -1 3/4 -1 3/4 -2 1/4 17' -2 1/4 -2 114 ` 'a 0 170 Sq ft o. 170 Sq ft .? 170 Sqft _ er " • A 1•' 17'' . ,_ 17' , } 1 1/21 344 17" -1 3/4cg '"► 2.5ft 17' -3?4cg -11.4c9 ri (;) 4x12i'l 1 / -1 . 1 314c 4cg 3.4(g 9 -1 3/4ct 11111111111MIS 1 MON MUM MINIM 314 1 11 NINO -314 2x12 6" UC 1 MINN ill. }� 1 112 r `r' >• Slab o t • • ` `w 1 h4cg tog 1,314cg -1 314cg•-$.314cg -1 3/4cg .4- 680 Sq ft d o ` 680 Sq ft nr q 680 Sq ft io ' ' C -112 -21/4 0 L , 00 00 thi, -1i2 / -1 i4cg 1,4cg 1!4cg Oc -.,, ,--- -114 - w 17' 17' 17' 17' coa cri ° Key: 9297 SW Hill St Tigard - - RamJack Driven Pile -0- - RamJack Helical Pile w - Existing concrete pillar support Date: 31-Jan-17 STARK W RamJack West- Foundation Underpinning Designed by: NDS FOUNDATIONS C 9291/9293/9297 SW Hill Street rg Tigard,OR Job No.: 17.004.RAM Desi,n Criteria Code(s): International Building Code(IBC)2012 ASCE 7-10 Design Loads: Dead: Soil: Roof= 15 psf Allow Lateral Bearing Pressure= 100 psf/ft (IBC Table 1806.2) Third Floor= 15 psf Active Pressure= 60 psf/ft Second Floor= 15 psf First Floor= 15 psf Walls= 8 psf 8"Foundation Wall = 100 psf Live: Roof(snow) = 25 psf Third Floor= 40 psf Second Floor= 40 psf First Floor= 40 psf Wind: Exposure= C Risk Category= II Wind Speed,V= 120 mph KA= 1.0 Gust Effect Factor,G= 0.85 Kd= 0.85 Internal Pressure Coefficient,GCP;= -0.18 K = 0.98 External Pressure Coefficient,CP= 0.8 Height,hz= 30 ft Design Wind Pressure: Design Load Combo= D+0.6W where: pw= qz(GCp-GCP;) w= 0.6 qz= 0.00256 K,KA Kd V2 Therefore: qz= 30.7 psf pw= 26.4 psf Factored Wind Pressure,p'w= 15.8 psf(say 16 psf) Page 6 of 15 Date: 31-Jan-17 40•STARK W RamJack West- Foundation Underpinning Designed by: NDS FOUNDATIONS ^ 9291/9293/9297 SW Hill Street re Tigard,OR Job No.: 17.004.RAM Helical Pier Design 0 Deck Vertical Design Loads: Tributary Widths: Roof= 0 ft > 0 plf Third Floor= 0 ft > 0 plf Second Floor= 6 ft > 90 plf First Floor= 0 ft > 0 Of Walls= 0 ft > 0 plf Foundation Wall (height) = 3 ft > 300 plf EDL= 390 plf Live: Roof(snow) = 0 ft > 0 plf Third Floor= 0 ft > 0 plf Second Floor= 6 ft > 240 plf First Floor= 0 ft > 0 plf ELL= 240 plf Max Pier Spacing = 17 ft Pier Working Loads: POL= 6630 lbs 0.75*Pu_= 3060 lbs PTL= 9690 lbs Pier Design: Pier Type Helical Pier . Shaft Diameter: Bracket 4038.1 t Bracket Capacity= 19700 lbs Therefore ok Reference ICC ESR-1854, Table 1-Foundation Mechanical Ratings of Brackets(Appendix A) Shaft Diameter 2.875" Installation Torque,T: Quit= 2(PTS) Qmt= Kt(T) where Kt=helix torque factor(ft') Shaft Dia Kt 19380 lbs according to the following table: 2.375 10 2.875 9 3.5 7 Therefore,T= Quit J Kt Allowable TSHAFr= 8200 ft-lbs Therefore ok 4.5 6 2153 ft-lbs_ Page 7 of 15 Date: 31-Jan-17 401STARK W RamJack West- Foundation Underpinning Designed by: NDS FOUNDATIONS 3 9291/9293/9297 SW Hill Street fY Tigard,OR C. Job No.: 17.004.RAM Push Pier Design-Interior Wall (Worst Case) Vertical Design Loads: Tributary Widths: Roof= 17 ft > 255 plf Third Floor= 17 ft > 255 plf Second Floor= 17 ft > 255 plf First Floor= 17 ft > 2.55 Of Walls= 24 ft > 192 plf Foundation Wall (height) = 3 ft > 300 plf EDL= 1512 plf Live: Roof(snow)= 17 ft > 425 plf Third Floor= 17 ft > 680 plf Second Floor= 17 ft > 680 plf First Floor= 17 ft > 680 plf ELL= 2465 plf Max Pier Trib Width = 8 ft Pier Working Loads: PDL= 12096 lbs 0.75*PLL= 14790 lbs PTL= 26886 lbs Pier Design: Pier Type Push Pier l t Shaft Diameter: Bracket 4021.1 11 Bracket Capacity= 31500 lbs Therefore ok Reference WC ESR-1854, Table 1-Foundation Mechanical Ratings of Brackets(Appendix A) Shaft Diameter 2.875" Installation Pressure, P: Quit= 2(PTL) Qmt= A, (P) where Ani=working area of the dual bore 53772 lbs installation cylinder Acyi= 16,27 in2 Therefore, Preu= Quit/Acyi 3 to a mmamam pressure of 1400 psi(or refusal) Page 8 of 15 Date: 31-Jan-17 0,4STARK W RamJack West- Foundation Underpinning Designed by: NDS FOUNDATIONS ^ 9291/9293/9297 SW Hill Street rg Tigard, OR O. Job No.: 17.004.RAM Lateral Design:-Rear Wall Design Wind Force: No. Piers: 6 p'w= 15.8 psf Trib Width,w= 25 ft FRooF=Pw(h,,+0.5h,)w Wall Trib Height,hw= 20 ft 9111 lbs Roof Trib Height,h,= 6 ft F= 9111 lbs Determine Tie-Back Force Install Angle,0= 15 degrees Tie-Back Force = F/sin rJ 9432 lbs say 10000 lbs Installation Torque,T: Quit= 2(PrL) Quit= Kt(T) where K,= helix torque factor(ft-1)according to the following table: 20000 lbs Shaft Kt 2.375 10 2.875 9 3.5 7 Therefore,T= Quit/Kt 4.5 6 2222 ft-lbs Therefore use 2 7/8"helical tie-back with 10"helix plate installed at 2,500 ft-lbs. Page 9 of 15 Date: 31-Jan-17 STARK W RamJack West- Foundation Underpinning Designed by: NDS FOUNDATIONS ^ 9291/9293/9297 SW Hill Street cg Tigard,OR O. Job No.: 17.004.RAM Lateral Design:-Interior Wall Design Wind Force: No. Piers: 5 p'W= 15.8 psf Trib Width,w= 34 ft FRooF=Pw(h„,+0.5h,)w Wall Trib Height,h,,,= 20 ft 12391 lbs Roof Trib Height,hr= 6 ft • F= 12391 lbs Determine Tie-Back Force Install Angle,O = 20 degrees Tie-Back Force= F/sin 0 1.3186 lbs say 15000 lbs Installation Torque,T: Quit= 2(Prl) Quit= Kt(T) where Kr= helix torque factor(ft-1)according to the following table: 30000 lbs Shaft Kt 2.375 10 2.875 9 3.5 7 Therefore,T= Quit/Kt 4.5 6 3333 ft-lbs Therefore use 2 7/8"helical tie-back with 10"helix plate installed at 3,500 ft-lbs. Page 10 of 15 • ENSICC EVALUATION SERVICE Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-1854 Reissued February 2015 Revised December 2015 This report is subject to renewal February 2017. , i.cci ,,?rf=, I (800) 423-6587 I (562)699-0543 A Subsidiary of the International Code Councils DIVISION:31 00 00—EARTHWORK 3.0 DESCRIPTION Section:31 63 00—Bored Piles 3.1 General: REPORT HOLDER: The Ram Jack` Foundation Systems consist of either helical piles or hydraulically driven steel pilings connected to GREGORY ENTERPRISES,INC. brackets that are in contact and connected with the load- 13655 COUNTY ROAD 1570 ,e. in. o d- io os uc r- ADA, OKLAHOMA 74820 (580)332-9980 3.2 System Components: op,w,ralr)a V 3.2.1 Helical Pile System—Lead Shafts with Helical Plates and Extensions: The lead shafts consist of either 2'/8- or 31/2-inch-outside-diameter (73 or 89 mm) steel pipe ADDITIONAL LISTEE: •-v' • ,, • • I 11, : • 'O•' respectively. Helical-shaped discs, welded to the pipe, RAM JACK MANUFACTURING, LLC advance the helical piles into the soil when the pile is 13655 COUNTY ROAD 1570 rotated. The helical discs (plates) are 8, 10, 12 or ADA, OKLAHOMA 74820 14 inches (203, 254, 305 or 356 mm) in diameter, and are cut from 3/s-inch- or /2-inch-thick (9.5 or 12.7 mm) steel EVALUATION SUBJECT: plate. The helical plates are pressed, using a hydraulic press and die, to achieve a 3-inch (76 mm) pitch, and are RAM JACK HELICAL FOUNDATION &DRIVEN then shop-welded to the helical lead shaft. Figure 1 FOUNDATION SYSTEMS illustrates a typical helical pile. The extensions have shafts similar to the lead sections, except without the helical 1.0 EVALUATION SCOPE plates. The helical pile lead sections and extensions are Compliance with the following codes: connected together by using a threaded pin and box system that consists of an internal threaded box shop-welded into 0 2015, 2012, 2009 and 2006 International Building Code the trailing end of the helical lead or extension sections and (IBC) an external threaded pin shop-welded into the leading end of helical extension sections. Each extension consists of a 0 2013 Abu Dhabi International Building Code(ADIBC)t threaded pin and a box on opposing ends. Figure 2 illustrates the helical pin and box connections. The lead 'The ADIBC is-based-en-the-20W IBC. 2009 IBC code sections shafts and extensions are coated with a polyethylene referenced in this report are the same sections in the ADIBC. copolymer coating complying with the ICC-ES Acceptance Criteria for Corrosion Protection of Steel Foundation Properties evaluated: t- U in. Paly ser • C.atia.s 2 ;) a • Structural and geotechnical a ng a ini u c•ati g is ne-s a 1 in Is $.4. ) as described in the approved quality documentation. 2.0 USES 3.2.2 Hydraulically Driven Pile System—Pilings, Ram Jacks Foundation Systems include a helical e Connectors, Starter, and Guide Sleeve: The pilings system and a hydraulically driven steel piling system. e consist of 2'18-inch-outside-diameter(73 mm) pipe having a helical pile system is used to transfer compressive, tension, o in. s .ft hi n- s •f • 21 in h, 'n :ith:r 3 , 5 or 7- and lateral loads from a new or existing structure . to. -.• g 9 , 5 •r m se Io s. o ne or soil bearing strata suitable for the applied loads, The used to connect the pilings together are 12-inch-long hydraulically driven steel piling system is used to transfer (305 mm), 23/s-inch-outside-diameter (60.3 mm) pipe compressive loads from existing foundations to load-bearing having a nominal shaft thickness of 0.19 inch, shop crimped soil strata that are adequate to support the downward- and inserted in one end of the piling section so that applied compression loads. Brackets are used to transfer approximately 6 inches of the connector extends out of one the loads from the building foundation to the helical pile end of the piling section. During installation, the subsequent system or the hydraulically driven steel piling system. piling section slides over the connector of the previous piling iCC-ES Ecu 1ut'nn Reports ore no:to be eon3trited u..rep re ser n,n ;7e.5 fneties t,r an other auri6 ite s not spec:-ie onl'addressed,nur are the to be c onsrrue'd � as on endorsement :he subiee'r u!:he report or a reeummendationf r..s use.1 here is m-a arrant)hs ICC E.uiuutton Sen ice,LLC.e.:press or implied,a, -ss1 t f 10 turd finding or other mutter in this report,or us-to an,pre•L•u':centred in the report. ,•...,-.� Page 11 of 13 Copyright U 2015 ICC Evaluation Service,LLC, Al rights reserved. vage of 14 ESR-1854 I Most Widely Accepted and Trusted Page 2 of 14 section. Figure 3 illustrates a typical piling used in 31/2-inch-outside-diameter (89 mm) pile is inserted through conjunction with a bracket. The starter consists of a the external guide sleeve. Once the 31/2-inch-outside- 21/9-inch-diameter (73 mm) steel pipe having a nominal diameter (89 mm) pile shaft has been installed through the shaft thickness of 0.217 inch, and a 23/e-inch-outside- external guide sleeve, the pile is cut approximately 6 inches diameter (60.3 mm) pipe having a nominal shaft thickness (152 mm) above the bracket. Two 11/4-inch-diameter of 0.19-inch, which is shop crimped and inserted in one end (32 mm) all-thread bolts are installed into the matching hex of the piling section so that approximately 6 inches of the nuts which are shop-welded to each side of the bracket connector extends out of one end of the piling section. A sleeve. A 21A-inch-square-bar support strap is then placed 23/6-inch-diameter-by-'/e-inch-thick (3.2 mm by 60.3 mm) over the all-thread bolts and centered on top of the pile. The ASTM A36 steel soil plug is shop-welded inside the support strap is then attached to the bracket with two 2'/9-inch (73 mm) starter section against the 23/9-inch 11A-inch (32 mm)hex nuts screwed down on the all-threads. (60.3 mm) connector. The starter section is jobsite-installed Figure 5 shows additional details. into the end of the initial piling and leads the piling in order 3.2.3.3 Support Bracket #4038.1: This bracket is similar to expand the soil away from the piling with a to the 4021.1 bracket but is designed for lighter loads and 3`/2-inch-outside-diameter (89 mm) steel ring having a is only used with the helical pile system on existing nominal wall thickness of 0.254 inch, shop-welded to the structures to support axial compressive loads. The bracket starter section 1 inch (25.4 mm) from the bottom edge to is constructed of a 3/9-inch-thick (9.5 mm) steel plate bent reduce skin friction. Figure 4 illustrates a typical starter joint. to a 90-degree angle seat measuring 10 inches wide A steel pipe guide sleeve, shown in Figure 3, is used to (254 mm) by 9 inches (229 mm) long on the horizontal leg laterally strengthen the driven pile. The starter, guide and 7 inches (178 mm) long on the vertical leg. The seat is sleeve, and pilings are coated with polymer coating welded to a 3'/2-inch-outside-diameter (89 mm) steel complying with AC228 and having a minimum coating bracket sleeve. The 2'/e-inch-outside-diameter (73 mm) pile thickness of 18 mils (0.46 mm), as described in the is inserted through the bracket sleeve. Once the 21/ -inch- approved quality documentation. outside-diameter(73 mm) pile has been installed,the pile is 3.2.3 Brackets: Brackets are constructed from steel plate cut approximately 6 inches above the bracket. Two 1-inch- and steel pipe components, which are factory-welded diameter (25 mm) all-thread bolts are installed in matching together. The different brackets are described in Sections nuts which are factory-welded to each side of the bracket 3.2.3.1 through 3.2.3.7. All brackets are coated with polymer sleeve. A 3/4-inch-thick (19 mm) support strap is then placed coating complying with AC228 and having a minimum over the all-thread bolts and centered on top of the pile.The thickness of 18 mils (0.46 mm), as described in the support strap is then attached to the bracket with two 1-inch approved quality documentation. (25 mm)hex nuts screwed down on the all-threads. Figure 6 3.2.3.1 Support Bracket#4021.1: This bracket is used to shows additional details. support existing concrete foundations supporting axial 3.2.3.4 Support Bracket #4039.1: This is a low-profile compressive loading. The bracket is constructed of a bracket used to underpin existing structures to support axial 3/B-inch-thick (9.5 mm) steel plate bent to a 90-degree compressive loads where the bottom of the footing is angle seat measuring 10 inches (254 mm) wide by approximately 6 inches to 10 inches below grade. The 9 inches (229 mm) long on the horizontal leg and 7 inches bracket is constructed of a 3/e-inch-thick(9.5 mm)steel plate (178 mm)on the vertical leg. The seat is factory-welded to a measuring 10 inches (254 mm) wide by 6.75 inches 4 /2-inch-outside-diameter (114 mm) steel bracket sleeve (172 mm) long, factory-welded to a 4 /2-inch-outside- having a nominal wall thickness of 0.438 inch. The external diameter (114 mm)steel bracket sleeve. The external guide guide sleeve, a 3''/2-inch-outside-diameter (89 mm) steel sleeve, a 3'/2-inch-outside-diameter (89 mm) steel pipe, is pipe having a nominal wall thickness of 0.254 inch, is inserted through the bracket sleeve. The 2'/8-inch-outside- inserted through the bracket sleeve. The 2'/e-inch-outside- diameter(73 mm) pile is inserted through the external guide diameter(73 mm) pile is inserted through the external guide sleeve. Once the 2'/e-inch-outside-diameter (73 mm) pile sleeve. Once (73 mm) pile has been installed, the pile is out approximately 6 inches shaft has been installed through the external guide sleeve, above the bracket. Two 1-inch-diameter (25 mm) all-thread the pile is cut approximately 6 inches above the bracket. bolts are installed in matching hex nuts which are factory- Two 1-inch-diameter (25 mm) all-thread bolts are installed welded to each side of the bracket sleeve. A 3/4-inch-thick into the matching nuts which are factory-welded to each (19 mm) support strap is then placed over the all-thread side of the bracket sleeve. A 3/4-inch-thick (19 mm) support bolts and centered on top of the pile. The support strap is strap measuring 5 inches (127 mm) long by 2 inches then attached to the bracket with two 1-inch (25 mm) hex (51 mm) in width is then placed over the all-thread bolts and nuts screwed down on the all-threads. This bracket can be centered on top of the pile. The support strap is then used with both the helical and driven pile systems. Figure 7 attached to the bracket with two 1-inch (25 mm) hex nuts shows additional details. screwed down on the all-threads. This bracket can be used 3.2.3.5 Slab Bracket #4093: This bracket is used to with both the helical and driven pile systems. Figure 5 underpin and raise existing concrete floor slabs to support shows additional details. axial compressive loading. The slab bracket consists of two 3.2.3.2 Support Bracket #4021.55: The bracket is similar 20-inch-long (508 mm) steel channels (long channels) to the 4021.1 bracket but is designed to support larger axial spaced 3 /2 inches (89 mm) apart, with two sets of 6-inch- compressive loads from existing structures. The bracket is long (152 mm) channels (short channels) welded flange-to- constructed of a 3/8-inch-thick (9.5 mm) steel plate bent to a flange(face-to-face) and then factory-welded to the top side 90-degree angle seat measuring 10 inches (254 mm) wide of each end of the long channels. One-quarter-inch-thick-by- by 9 inches (229 mm) long on the horizontal leg and 4-inch-by-5-inch (6 mm by 102 mm by 127 mm) steel plates 7 inches (178 mm) on the vertical leg. The seat is factory- are factory-welded on the bottom on each end of the long welded to a 51/2-inch-outside-diameter (140 mm) steel channels. The bracket sleeve is 3 /2-inch-outside-diameter bracket sleeve having a nominal wall thickness of (73 mm) steel tube factory-welded to and centered between 0.375 inch.The external sleeve, a 41-inch-outside-diameter the two long channels. Two 1-inch-diameter (25 mm) (114 mm) steel pipe having a nominal wall thickness of coupling hex nuts are factory-welded to the long channels 0.438 inch, is inserted through the bracket sleeve. A on each side of the bracket sleeve. One he222/Onch- ESR-1854 I Most Widely Accepted and Trusted Page 3 of 14 outside-diameter(73 mm) pile has been installed, the pile is conforming to ASTM A500, Grade C, except they have a cut approximately 6 inches above the bracket. Two 1-inch- minimum yield strength of 65,000 psi (448 MPa) and a diameter (25 mm) all-thread bolts are installed in matching minimum tensile strength of 76,000 psi (524 MPa). hex nuts which are factory-welded to each side of the bracket sleeve. A 3/4-inch-thick (19 mm) support strap is 3.3.4 Brackets: then placed over the all-thread bolts and centered on top of 3.3.4.1 Plates: The 3/9-inch- and /2-inch-thick (10 and the pile. The support strap is then attached to the bracket 12.7 mm) steel plates used in the brackets conform with two 1-inch (25 mm) hex nuts screwed down on the all- to ASTM A36, but have a minimum yield strength of threads. This bracket is only used with the helical pile 50,000 psi (345 MPa) and a minimum tensile strength of system. Figure 8 contains additional details. 70,000 psi (483 MPa). The /4-inch- and 5/9-inch-thick 3.2.3.6 New Construction Brackets #4075.1, #4076.1 (6.4 and 15.9 mm) steel plates used in the brackets and #4079.1: These brackets are used with the helical pile conform to ASTM A36, having a minimum yield strength of system in new construction where the steel bearing plate of 36,000 psi (248 MPa) and a minimum tensile strength of the bracket is cast into the new concrete grade beam, 60,000 psi(413 MPa). footing or pile cap concrete foundations. The brackets can 3.3.4.2 Channels: The steel channel used in the brackets transfer compression, tension and lateral loads between the conforms to ASTM A36, having a minimum yield strength of pile and the concrete foundation. The 4075.1 has a 36,000 psi (248 MPa) and a minimum tensile strength of /9-inch-thick-by-4-inch-wide-by-8-inch-long (15.9 mm by B0,000 psi (413 MPa). 102 mm by 203 mm) bearing plate with two predrilled holes. The 4076.1 has a 1-inch-thick-by-9-inch-wide-by-9-inch-long 3.3.5 Sleeves: The carbon steel round tube used in the (25 mm by 229 mm by 229 mm) bearing plate with four bracket assembly as a sleeve conforms to ASTM A500, predrilled holes. The 4079.1 has a 5/9-inch-thick-by-8-inch- Grade C, except it has a minimum yield strength of wide-by-8-inch-long (16 mm by 203 by 203 mm) bearing 65,000 psi (448 MPa) and a minimum tensile strength of plate with four predrilled holes. The 4075.1 and 4079.1 80,000 psi (552 MPa). bracket steel bearing plates are factory-welded to a 3.3.6 Threaded Rods, Bolts and Nuts: 3 /2-inch-outside-diameter (89 mm) steel sleeve with a predrilled 13/-6-inch-diameter (20.6 mm) hole. The 4076.1 3.3.6.1 Helical Piles : The threaded pin and box used in bracket steel bearing plate is factory-welded to a 2'/5-inch- connecting the 2''/9-inch-diameter (73 mm) helical lead outside-diameter (73 mm) steel sleeve with predrilled shafts and extensions together conform to ASTM A29, 3/le-inch-diameter(20.6 mm) holes.The 4075.1 and 4079.1 Grade 4140, having a minimum yield strength of 55,000 psi brackets are used with the 2'/9-inch-diameter helical piles. (379 MPa) and a minimum tensile strength of 80,000 psi The 4076.1 bracket is used with the 3.5-inch-diameter (552 MPa). The threaded pin and box used in connecting helical piles. The bracket is embedded into the foundation the 3Y2-inch-diameter (89 mm) helical lead shafts and unit to provide the effective cover depth and to transfer the extensions together conform to ASTM A29, Grade 4140, tensile and compressive forces between steel bearing plate having a minimum yield strength of 55,000 psi (379 MPa) and surrounding concrete. The bracket is attached to the and a minimum tensile strength of 80,000 psi (552 MPa). pile shaft with either one or two 3/4-inch-diameter (19.1 mm) 3.3.6.2 All Other Fastening Assemblies (Including through-bolts, as shown in Table 3B of this report, to Brackets): The threaded rods conform to ASTM A307 and complete the transfer of tension forces to the pile shaft. ASTM A449. The nuts conform to ASTM A563, Grade DH. Figure 9 contains additional details. The threaded rods and nuts are Class B hot-dipped 3.2.3.7 #4550.2875.1 Tieback Bracket Assembly: This galvanized in accordance with ASTM A153. Through-bolts assembly is used with a helical pile and is only designed for used to connect the new construction bracket and tieback tension loads. The assembly consists of two major bracket assembly to the pile to transfer tension forces components, a tieback connection with rod and a tieback conform to ASTM A325 Type I and must be hot-dip plate. The i - is a 234- ---galvanized in accordance with ASTM A153. (60 mm) steel sleeve with two predrilled holes to accept 4.0 DESIGN AND INSTALLATION through-bolts for the connection to the helical pile pipe. One end of the steel sleeve has a 1 /2-inch-diameter 4.1 Design: (38 mm) hex nut factory-welded to the sleeve to accept a 1 /2-inch-diameter (38 mm) all-thread rod that extends 4.1.1 Helical Pile: Structural calculations and drawings, through the wall being supported. The tieback plate is an prepared by a registered design professional, must be 8-inch-deep (203 mm) channel with a stiffening plate submitted to the code official for each project, based on with a 1''/9-inch-diameter (48 mm) hole in its center. The accepted engineering principles, as described in IBC assembly is secured with a 1'12-inch-by-72-inch (38 by Section 1604.4 and 2015, 2012 and 2009 IBC Section 1810 12.7 mm) wedge washer and nut. Figure 10 shows and 2006 IBC Section 1808, as applicable. The load values additional details. (capacities)shown in this report are based on the Allowable Strength Design (ASD) method. The structural analysis 3.3 Material Specifications: must consider all applicable internal forces (shear, bending 3.3.1 Helix Plates: The carbon steel plates conform to moments and torsional moments, if applicable) due to ASTM A36, except they have a minimum yield strength of applied loads, structural eccentricity and maximum span(s) 50,000 psi (345 MPa) and a minimum tensile strength of between helical foundations. The result of the analysis and 70,000 psi (483 MPa). the structural capacities must be used to select a helical 3.3.2 Helical Lead Shafts and lead foundation system based on the structural and geotechnical shafts.3.2and extensionsPile areShafts carbon steel Extensions:rouod Thehs that demands. The minimum embedment depth for various conform to ASTM A500, Grade C, except they have a loading conditions must be included based on the most minimum yield strength of 65,000 psi (448 MPa) and a stringent requirements of the following: engineering tensile strength of 76,000 psi (524 MPa). analysis, tested conditions described in this report, site- minimumspecific geotechnical investigation report, and site-specific 3.3.3 Piling Sections: The piling sections, connectors, load tests, if applicable. For helical foundation s stems starters and guide sleeves are carbon steel round tube subject to combined lateral and axial (6) ir3dR or `ESR-1854 I Most Widely Accepted and Trusted Page 8 of 14 5.9 Engineering calculations and drawings, in accordance and 2009 IBC Section 1810.3.6 (second paragraph) with recognized engineering principles and design and 2006 IBC Section 1808.2.7, are outside the scope parameters as described in IBC Section 1604.4, and in of this evaluation report. Compliance must be compliance with Section 4.1 of this report, are addressed by the registered design professional for prepared by a registered design professional and each site, and the work of the design professional is approved by the building official. subject to approval by the code official. 5.10 A soils investigation for each project site must be 5.13 Settlement of the helical pile is outside the scope of provided to the building official for approval in this evaluation report and must be determined by a accordance with Section 4.1.1 of this report. registered design professional as required in 2015, 5.11 In order to avoid group efficiency effects, an analysis 2012 and 2009 IBC Section 1810.2.3 and 2006 IBC prepared by a registered design professional must be 1808.2.12. submitted where the center-to-center spacing of axially 5.14 The interaction between the hydraulically driven pile loaded helical piles is less than three times the system and the soil is outside the scope of this report. diameter of the largest helix plate at the depth of 5.15 The Ram Jack`'Foundation Systems are manufactured bearing. An analysis prepared by a registered design at the Ram Jack Manufacturing, LLC,facility located in professional must also be submitted where the center Ada, Oklahoma, under a quality control program with to-center spacing of laterally loaded helical piles is less inspections by ICC ES. than eight times the least horizontal dimension of the pile shaft at the ground surface. Spacing between 6.0 EVIDENCE SUBMITTED helical plates must not be less than 3D, where D is the Data in accordance with the ICC-ES Acceptance Criteria for diameter of the largest helical plate measured from the Helical Foundation Systems and Devices (AC358), dated edge of the helical plate to the edge of the helical plate June 2013 (editorially revised September 2014). of the adjacent helical pile;or 4D, where the spacing is measured from the center-to-center of the adjacent 7.0 IDENTIFICATION helical pile plates. The Ram Jack' Helical Foundation & Driven Foundation 5.12 Connection of the side load bracket or the repair System components are identified by a tag or label bearing bracket as it relates to seismic forces and the the Ram Jack logo, the name and address of Gregory provisions found in 2015, 2012 and 2009 IBC Sections Enterprises, Inc., the catalog number, the product 1810.3.11.1 and 1810.3.6.1 and 2006 IBC Section description, and the evaluation report number(ESR-1854). 1808.2.23.1, and for all buildings under 2015, 2012 TABLE 1—FOUNDATION STRENGTH RATINGS OF BRACKETS' PRODUCT 'ES RI•TI•N • LI • A - - •LL•W•B CAPACITY NUMBER (inches) ips) Compression Tension Lateral 4021.1 Side load bracket 2/e 33.65' N/A N/A 4021.55 Side load bracket 31/2 55.12''5 N/A N/A 4038.1 I Side load bracket 2'/e 19.70'S NIA N/A 4039.1 274 32.Q7 NIA _ N/A 4075.1 New construction I 2'62 See Table 3A See Table 3B 1.49" 4079.1 New construction 2'/e See Table 3A See Table 38 1494' 4076 New construction 31/2 See Table 3A See Table 3B 2.79" 4093.1 Slab bracket 27/e See Table 5 N/A N/A 4550.2875.1 Tieback assembly 2'/e 27.9 20-angle(tension only)'`` 27.6 @ 30°angle(tension only)''' For SI: 1 inch=25.4 mm, 1 kip(1000 Ibf)=4.48 kN. 'Load capacity is based on full scaie load tests per AC358 with an installed 5'-0'unbraced pile length having a maximum of one coupling per 2015,2012 and 2009 IBC Section 1810.2.1 and 2006 IBC 1808.2.9.2.A 4-foot-long guide sleeve must be installed at the top of the shaft as required in Figures 3,5 and 7.Side load bracket must be concentrically loaded. Side load bracket plate must be fully engaged with bottom of concrete foundation. Only localized limit states such as mechanical strength of steel components and concrete bearing have been evaluated. 2Lateral load capacity is based on lateral load tests performed in firm clay soil per Section 4.1.1 of this report.For any other soil condition,the lateral capacity of the pile must be determined by a registered design professional. The bracket must be installed with minimum embedment of 3 inches when measured from the bottom of the concrete foundation to the bottom of the bracket plate. Minimum width of footing must be 12 inches. 3The capacities listed in Table 1 assume the structure is sidesway braced per 2015,2012 and 2009 IBC Section 1810.2.2 and 2006 IBC Section 1808.2.5. 'Tieback assemblies must be installed in accordance with Section 4.2.5 of this report. Only localized limit states such as mechanical strength of steel components and concrete bearing have been evaluated. The tieback assembly must be installed to support a minimum 6-inch-thick concrete wall. Two through bolts are required for connection between bracket sleeve and helical shaft.Bolts must be 3//.-inch diameter complying with ASTM A325 and installed snug-tight with threads excluded. 'The tabulated values are based on installation with normal-weight concrete having a minimum compressive strength of 2500 psi(17.23 MPa). N/A=not applicable. Page 14 of 15 'ESR-1854 i a , l• .e • Ce e. a , , s ,•• •age 12 of 14 TABLE 6—ALLOWABLE TENSION AND COMPRESSION LOADS FOR HELICAL PLATES(KIPS) ell .1 *let- Di-m:4 erl I el" -I wile S .ft •la • er(in he• ----- 8 63.29 79.84 10 55.51 66.29 12 39.40 65.74 14 1 42.07 60.42 For SI:1 inch=25.4 mm:1 kip=1000 lbf=4.45 kNl. lAllowable load values are for hel:cal plates made from -3/5-inch thick steel. except for the 14-inch diameter plate.which is made from 1/2-inch Thick steel. , . 4 I I 4.„, i 17 ti ' I 1 I 1 1 i I i . I 1 I , I 4 I r *A I i I I4 , 4,T,-.4,0,04 "1,40 A:, i --4,,---- .....,, ‘ 7YPTCA1 i CAD TYP ICAt SfCTION IXtf"*STUti FIGURE 1—TYPICAL HELICAL PILE AND PLATE SPACING CHARACTERISTICS 2 f4k•0 THREADED THREADED PILING - BOX-- if PIN 0rill......% 1 .411r7, 1 I Let DRIVE PIN HOLE 2 34-0 PILING INTERNAL THREADED CONNECTION 3)V•0 THREADED THREADED PILING -\ BOX /- PIN 0 ) --DRNE PIN HOLE 3 W.0 PILING INTERNAL THREADED CONNECTION FIGURE 2—TYPICAL HELICAL PILE SYSTEM INTERNAL Page 15 of 15 THREADED CONNECTION DETAIL