Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
STREET TREE TIGARD CERTIFICA TI ON Jam. / , , owner/agent for ,--)6� 72707'1/LEAs g ./ g (jp/t/sY(I' E PRIl\TT) (PERMIT HOLDER) do hereby y certi that the following location meets City of T,gard land use and development standards for sheet tree installation and is consistent with the approved site plan. PERMIT NO.: L SITE ADDRESS: 4210 -r SUBDIVISION. e&/e./ 4 - - LOT -: Pr SIGNATURE: DATE: 2-- "0-00[ TER/AGENT) RECEIVED & VERIFIED BY• G,,, //o- // / , /� DATE: ,201 ? (G11'Y OF TIGARD) .„[2, Tree location verified per approved site plan. ABuilding\i,orms\StieetFILL(utificate 05/30/2012 • Oregon Residential Specialty Code R318.2 MOISTURE CONTENT ACKNOWLEDGEMENT FORM I, � am the ene g ral contractor or the owner-builder at the following address: Site Address: � �0 �� City: Permit#: /7g/ /�`'/� 07.)1Y 7Y}L .fes(/ U Subdivision/Lot#: C��13�� �^ �7� /f9r) and/or • Map and Tax Lot#: To conform with the 2008 Oregon Residential Specialty Code (ORSC), Section R318.2 and OAR 918-480-0140, I am notifying the building official that I am aware of the moisture content Requirement of ORSC Section R318.2 and have taken steps to meet this code requirement. [Section R318.2 is provided for reference]. R3I8.2�o sture Content: Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent by dry weight of dry framing members. Signature: —r,/' Date: 2- General Con Tactor or 0 -'r-Builder • 1:\Building\Fonn\RES-MoistureSensitiveWood.doc 09/25/08 • Oregon Residential Specialty Code N1107.2 HIGH-EFFICIENCY INTERIOR LIGHTING SYSTEMS Permit No.: A st 2-0/6- goi) Jurisdiction: e0" Site Address: 22 („— Subdivision/Lot Subdivision/Lot#: ��f�s� 'r and/or Map and Tax Lot#: By my signature below, I certify that a minimum of fifty(50)percent of the permanently • installed lighting fixtures in the above mentioned building have been installed with compact or linear fluorescent, or a lighting source that has a minimum efficacy of 40 lumens per input watt. (Oregon Residential Specialty Code N1107.2)1 Signature: e-- Date: 24,)( Owner/General C tractor/Authorized Agent Print Name: d ) s'5:47 ORSC Section N1107.2.High-efficiency interior lighting systems. A minimum of fifty(50)percent o the permanently installed lighting fixtures shall be installed with compact or linear fluorescent,or a lighting source that • has a minimum efficacy of 40 lumens per input watt. Screw-in compact fluorescent lamps comply with this requirement. The building official shall be notified in writing at the final inspection that a minimum of fifty percent of the permanently installed lighting fixtures are compact or linear fluorescent,or a minimum efficacy of 40 lumens per input watt. I:\Building\Fonns\RES-HighEfficiencyLighting.doc 07/01/08 • tl 4 ter+..... m.:C°1- :hl �'YII Gt f� ,� ;�� F.-L_ All Time Heating LLC Po Box 1347. Lake Oswego, OR 97035 (503) 208-2276 rruleu Haaress: /0 ✓ � HVAC Permit #:: Builder/Owner: % _ ~---- Contact Phone Number: Mechanical Summary: Duct Tightness Verification (DTV) Tooled to conduct the duct tightness test: duct blower 0 blower door subtraction method Cl flow hood Unless all ducts are located within conditioned space, one of the following must be verified 0 ost-construction duct leakage to outdoors is sz (indicate one): Post-construction total duct leakage is < 8cfm per z 00 ft Pa 25 Pa EJ Rough-In total duct leakage with gr handler nstalledm per 1is00 ft cf 25 ftz CJ Rough-in total duct leakage without air handler installed is 5. fm per per 0 f2© 25 9 g 4 cfm 100 ft @ 25 Pa Square footage of conditioned floor area served by HVAC system: t L ft2 Test leakage measurement at 25 Pa: .�..�, cfm Formula: cfm25 x 100/ ft2 of conditioned floor area served = Duct Leakage Result cfm25 x 100/ 2f� Z— ft z ----I of conditioned floor area served = 55 cfm leakage/100 ft2 Test Conducted by: � , � HVAC Contractor: � - r - — Date Test Conducted: 2-- ���� ,�— i'� - Ar` HVAC Master # The master contractor must sign and date below. A duct leakage test has been performed on the HVAC system at the above location byme employed by me. The duct system meets the minimum leakage requirements as outlined in the International Energy Conservation Code. I am responsible to submit accurate or someone authority before final HVAC inspection. test results to the permitting 2009 HVAC Master Signature: Date: 2- — 2- -- 7Z