Lateral Analysis
For
Riverside Homes— Plan 2885 5
Walnut Ridge Lot 8—13320 SW Doe Ln
Tigard, OR 97223
May 29,2016
�� PROp4
,�C' Neto s'o
d9 SPE 'Q y.
,cc
OREGON
I N, tz,1q 32
�',IVA MOAN
Expires: 1,2.31.142
Job No:15116
* LIMITATIONS *
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L- 15
Lateral Analysis
For
Riverside Homes— Plan 2885
Job No:15116
" " ' LIMITATIONS
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L- 15
Corina
N/UNTEAN�INc.
CONSULTINGIENGINEER
3204 NE 166th Avenue I Vancouver,WA 98682
corinamaa comcast.net 503-313-3011
STRUCTURAL DESIGN CRITERIA
Governing Code: 2012 International Residential Code (IRC)
2012 International Building Code (IBC)
Dead Load:
A. Roof 15 psf
B. Floor ..10 psf
C. Exterior walls ..10 psf
D. Interior walls with gypboard each side 5 psf
Snow Load:
A. Uniformly distributed snow load .25 psf
Floor Live Load:. 40 psf
Wind Load:based on ASCE 7-10 CH27 MWFRS Directional Procedure
A. 3 Second Gust Wind Speed V=126 mph
5. Importance Factor . 1=1.0
C. Exposure B
D. Topographical Factor .Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
Seismic Load—based on ASCE 7-10 Section 12.14
A. Mapped Spectral Acceleration for short periods.....Ss=1.0
B. Mapped Spectral Acceleration for 1 sec. period S1=0.34
C. Ductility Factor ..R=6.5
D. Seismic Design Category D
Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 20012 Table 1806.2....Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
Concrete:
A. 28 days design strength F'c 3000 psi
B. Reinforcing bars ASTM A615, Grade 60
III
corina
MUNTEANti NC
CONSULTINGIENGINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet: L-1
corinamOcomcastnet 1503-3133011
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2•SDs
SEISMIC BASE SHEAR V:_ •W (EQ.12.14-11 with F=12)
R
SS mapped spectral acceleration for SS := 1.00
short periods(Sec.11.4.1) from USGS web site
S5 mapped spectral acceleration for Si := 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.4-1) F4' 1.1 Based on Soil
Fv Site coefficient(Table 11.4-2)
Fv:- 18 Site Class D
SMS F4•S5 SMs = 1.1 (Eq.11.4-1)
SM1 Fv•Si SM1= 0.61 (Eq.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS 3•SMS SDs = 0.73 > 0.50g
SEISMIC
2 CATEGORY
SDI := 3'SMI SDI = 0.41 > 0.20g D per Table 11.6-1
1.2•SDs WOOD SHEAR PANELS
V:_ W R:= 6.5 Table 9.52.2
R
1.2.0.73
V:= =6.5 •W V: 0.135•W
12.4 Seismic Load Combinations
E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS
corina
MUNTEANt,Nc
CONSULTING'ENGINEER
Plan 2885
Job No:15116 Sy:CM
3204 NE 166'"Avenue I Vancouver,WA 98682
corinam(a)comcast.net 1503-313-3011 Date:Nov 2015 Sheet L-2
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
MIL
11 — 7.4
psf psf
1111 Wind Kase
(
Shear
Length L:= 52-ft
Height Ht:= 24-ft WIND:= L•Ht.(11.psf+ 7.4.pan
SEISMIC WIND= 22963.2lb
Fr Wroof
F2 - — Wfloor
Wwall Seismic:
base Shear
Aroof 52•ft•40•ft Aroof = 2080ft2
Afloor 43•ft•40•ft Afloor= 1720ft2
WwaIIs 4.52•ft•20-ft Wwalis = 4160 ft2
SEISMIC:= (Aroof'15•psf+ Afloor•15•psf+ Wwai s•10 psf) 0.123 SEISMIC= 12127.8 lb
WIND GOVERNS DESIGN
corina
MUNTEAN�IN`.
CONSU LTI N GI ENGINEER
Plan 2885
3204 NE I660'Avenue I Vancouver,WA 98682 Job No:15116 Sy:CM
coonamCalcomcast.net i 503-313-301 Date:Nov 2015 Sheet L-3
WIND DESIGN IS EASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qZ:= .00256•KZ•KZt•Kd•V2.I (Eq.6-15)
EXPOSURE
WIND SPEED(3 second gust) 1/35:= 126 mph
IMPORTANCE FACTOR I := 1.0
TOPOGRAPHICAL FACTOR KZt:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:= .00256•KZ•KZt•Kd•V3,2•I qz= 19.69
(varies/height)
15'-20' KZ:= 0.62 qz:= .00256•KZ•KZt•Kd•V3s2.1 qZ= 21.42
20'-25'
K,:= 0.66 q7:= .00256•KZ•ICA•Kd•V3s2•I qz= 22.8
25'-30' KZ:= 0.70 qz:= .00256•KZ•KZt•Kd V3s2•I qz= 24.18
III coring
MUNTEANtiNC.
CONSULTI NGI ENGINEER
Plan 2885
3204 NE 166'"Avenue 1 Vancouver,WA 98682 Job No:15116 By:CM
connamgcomcast.net 1 503-313-3011 `'F
L-A
Date:Nov 2015 Sheet
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= 9Z•G•CP G:= 0.85 Gust factor
C, pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-15' WINDWARD P„,:= 12.4•psf•0.85.0.8 PW= 8.43 psf
LEEWARD PL := 12.4•psf•0.85.0.5 PL= 5.27 psf
15'-20' WINDWARD P„,:= 13.49•psf•0.85.0.8 P„,= 9.17 psf
LEEWARD PL := 13.49•psf•0.85.0.5 PL = 5.73psf
20'-25' WINDWARD P„,:= 14.36•psf•0.85.O.8 P„,= 9.76psf
LEEWARD PL:= 14.36•psf•0.85.0.5 PL= 6.1 psf
AT ROOF
0'-15' WINDWARD P„,:= 12.4•psf•0.85.0.3 PW= 3.16 psf
LEEWARD PL := 12.4•psf•0.85.0.6 PL = 6.32 psf
15'-20' WINDWARD P„,:= 13.49•psf•0.85.0.3 P„,= 3.44 psf
LEEWARD PL := 13.49.psf•0.85.0.6 PL = 6.88psf
20'-25' WINDWARD P„,:= 14.36•psf•0.85.0.3 P„,= 3.66psf
LEEWARD PL:= 14.36.psf•0.85.0.6 PL = 7.32 psf
25'-30' WINDWARD P,„:= 15.23•psf•0.85.0.3 P„,= 3.88 psf
LEEWARD PL := 15.23•psf•0.85.0.6 PL = 7.77 psf
111
coring
MUNTEANtiNc.
CONSULTINGIENGINEER Plan 2885
Job No:15116 By:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet L-5
corinamRcomcastnet{ 503-313-3011
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
o.44 Assume
88
Cp-0.3 psf6. 0 := 35
iSo. 7Cp--0.6
8 ft
9.17 1 .1
PO6.1
PO
Mean Roof Height
och,.
18+ 22
= 20
2
Loads at Roof roof-ave
Windward 3.44•psf•5.5•ft= 18.92 plf
Leeward 6.88•psf•5.5•ft= 37.84 pIf
Wall loads at upper level at main level
Windward 8.43psf•4•ft= 33.72pIf 8.43•psf•8.5•ft= 71.66pIf
Leeward 5.73•psf•4•ft= 22.92pIf 5.73•psf•8.5•ft= 48.71pIf
V4417 1 vS Roof A ONN!) L-6
r + , II
II
II
II
II11.
11
ktill
91 +I 47
I I I1
1 I II
711.11.1111611111111 0
`n
PRE. MFG. TRUvE$ 6►24" O.C.
.-- .-- moi/♦♦♦!.♦♦/4�=•-/,^- RDE-•••TRUSS V
- 14114,♦♦♦! l/�.•-•-•- ♦!�♦♦♦♦♦♦♦♦♦♦♦
- ♦��-�•�♦me♦♦♦♦♦♦♦♦!♦
♦♦♦♦'►♦♦!QS♦♦♦♦♦,, 4®♦♦♦♦♦•-•lti,1®V♦♦♦♦♦♦♦♦♦!♦♦!•♦♦•♦♦♦
- 1 ! ♦ ! ♦♦♦♦ ♦.'\>' ♦#
.•!♦♦♦S♦♦♦♦�►i►♦♦♦♦• ♦ ►41r,••••••••••••••••••••!/
d•444:1.4.•♦♦! ♦♦♦i/ ♦�1♦♦♦ ♦♦♦♦ ,.
d =!=♦♦♦♦a♦A♦t� .,kt40►♦♦♦!♦•♦♦♦♦♦♦♦♦♦♦♦� '�t—
nI.
1 ♦♦�♦♦♦♦♦7!•►♦♦♦ •♦♦♦
♦♦1t 9.♦.i♦♦♦♦♦tyr
♦ ♦ i♦ ♦ ►♦♦♦♦Cr 0
...�► 1♦♦♦.!!b♦♦.,
8�l4164th SAO..
■1���♦i
1 ❑
RIOOE
�.-I 1010=
-
, ► •\\
,++.401•
e••••!♦!♦♦\\
0&41141;00743110011 .i�!1♦ ♦/10 A♦♦♦• -•-iv♦♦♦♦♦♦♦`�
i♦•♦•♦♦.•♦♦4'►♦ ♦!♦♦!♦♦♦♦•'.
i♦♦ ♦♦♦! 1►ta/♦♦!♦♦♦♦♦♦ I/♦\ —
♦!!♦♦♦♦!♦♦♦♦ •4••••♦1!♦4®� ♦♦♦!♦4..♦♦♦♦♦♦\\
Z•4••♦♦♦♦• ♦♦♦♦t'4 ♦ �►•♦♦t17' ♦♦♦41. ♦♦♦\
MFG. 0 24. O.C.
:iii rr!\
o--117--1/ f l'
a.. 4- UFO. IL, -._1.. O
,+ 4 [ri 7'-4' RAISED
C ® CM. 1 ROOF 4 (10'-rsPRMA AT
lit/o.C. L,1 Villa. MI
PRE UFO. W/ I'-6' RAISED i0 .
TRU2S'yS60 Q EL ,
W`..-6 RAISED
r
t siT.
51.14.0
d
L-7
12-57516 iviii4P
, will_I+ PSS _,_ 0 01
I
I I III
III
'W.... .7..21 II
A$1
t
III
711
MASIER
BEDROOM
G.
BEDRTWO ---M---' 0 : J
i'
I7...4.\\
O III
I - - _--1- ' ar-
I
it
ECM
OATH
rH4ILA
LJ
43
'
IcI i I S
_{ P&S �_ - ...1—...-
le PAe161 IS
b
- •
Pattia'y,
7 V
' y
O O O
II a
BEDROOM BEDROOM
THREE FOUR
! A
1111.111.1111111- 1111 'mammy
l , . ,
Itl 141
e2 3151‘. ��
(& EA)SLOB. fEO S2 =R. IOW e030 Plc.
Mit
L A.- .,...
(,+1,,,, i
,.....,
, ,..,,
tie Mot'.
IWtiFAP o (, L-8
_644 toetigV
o' 'o
—J L_
Pty 33 I
Z'rb
31-wrions6.- _ 43.,„„.., -G--- a
_ __ ..._ _ ._ _
_0
11
.......~ DINING
ROOM GREAT
ROOM -....,
POCKET It== 0OFFICE 1 11
\` II
—r v
T STAIR 'I
1—--41 1-1 1 oILTAn.
1 Ii —J
'•
AL `_II ��JI_=J�---1 17
1
I1 KITCHEN ; `.�. i."'''''''
UIiii 1 TT.
H.\, I
oow --- --- 4� IIItllll
��II I11I
ll! `UIII � 11 �
40(pc ' Et
-
VI
DETAIL
==_=�sil _ , — of
I� W I.0
GARAGE I
1
I $ti
o FOS iI
r -1
4__- ....-I _ _ 0'
ISI
0 - 71 1 ct 55 tu. -,- -
II im.
pay 111III
147
111
> 11It 111
!11
dismwdmi I 1®...
ICI
t'2à ..
G
ir141. *414016.
corina
MUNTEANti NC
CONSULTING1ENCINEER Plan 2885
Job No:15116 By:CM (�
3204 NE 166'"Avenue Vancouver,WA 98682 Date:Nov 2015 Sheet L-9
corinarnacomcast.net S03-313-3011
SHEAR WALL DESIGN
Pdl PdI
Wldl
_ 0,0 P:= wind
V:= seismic
h
}
R=Hol down
Force
Based on 2012 IBC Basic Load Combinations 1605.3.1
0.6D+ W (Equation 16-11)
0.6•D+ 0.7E (Equation 16-12)
Overturning Moment: Mot:= P•h
L2
Resisting Moment: Mr:= 0.6•(Wdl + Wwan)• c2 + 0.6•Pdl•L
Mot Mr
Holdown Force R:_
L
corina
MUNTEANtiNC
CONSULTINGIENGINEER Plan 2885
Job No:15116 Sy:CM
3204 NE 166'"Avenue 1 Vancouver,WA 98682 Date:Nov 2015 Sheet L-10
connamacomcast.net 503-313-3011
Left Elevation Exterior Walls
Second Level
Wind Force P:= 2260.1b P= 2260 lb
Length ofwall L:= 5•ft+4•ft+ 19•ft L= 28ft
P
Shear v:= L v= 80.71 plf A
5
Overturning Mot:= P•8•ft•— Mot= 3228.571b•ft
Moment 28
Resisting Mr:- 0.6•(15•psf•2•ft+ 10•psf•8•ft)• (52ft)2
+ 0.6.600•Ib•5•ft
Moment
Mr= 2625lb•ft
Mot— Mr
Holdown =120.71 lb
Force 5ft
Maln Level
Wind Force P:= 4660•lb P= 4660 lb
Length of wall L:= 14.ft+ 10•ft+ 8•ft L= 32ft
P
Shear v:= — v= 145.63pIf B
8
Overturning Mot:= P•9.ft•32 Mot= 10485lb•ft
Moment
(8•ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+10.psf.17.ft)• 2 + 0.6.800•Ib•8•ft
Moment
Mr= 7680lb•ft
Mot— Mc
Holdown = 350.63 lb
8'ft
Force
IIICorina
MUNTEANL'iNc-
CONSULTINGJENGINEER Plan 2885
Job No:15116 By:CM
3206 NE 166'"Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet: L-1 1
corinam�lacomca st.net I 5O3-313-3011
Front Elevation Exterior Walls
Second Level
Wind Force P:= 2373•lb P= 2373 lb
Length ofwall L:= 3.5•ft+ 3•ft+ 3.5•ft+ 3.5•ft L= 13.5ft
P
Shear v:= — v= 175.78pIf B
L
35
Overturning Ma:= P•8'ft•— Mot= 4921.73Ib•ft
Moment 13.5
(3.5•ft)2
Resisting Mr:= 0.6•(15.psf•4•ft+ 10.psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft
Moment
Mr= 17745lb•ft
Mot— Mr
Holdown = 899.22 lb
Force 3.5 ft MSTC4853
Main Level
Wind Force P:= 2988•Ib P= 2988 lb
Length of wall L:= 2.25•ft+ 2.25•ft+ 1.5•ft+ 1.5•ft L= 7.5ft
2.25.3.5 = 7.88
P
Shear Wind v:_ — v= 398.4pIf D
L
2.25
Overturning Mot:= P•7.88•ft•75 Mot= 7063.63lb•ft
Moment
(2.25•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.800•lb•2.25•ft
Moment
MOtMr
Mr= 1292.63lb•ft
Holdown = 2564.89 lb
Force 2.25•ft
HTT5
III Corina
MUNTEANtINc Plan 2885
CONSU LTI NG1 ENGI N EER
Job No:15116 By:CM
Date:Nov 2015 Sheet L-12
3204 NE 166'"Avenue f Vancouver,WA 98682
corinama,comcastnet 1 503-313-3011
Right Elevation Exterior Walls
Second Level
Wind Force P:= 2260•lb P= 2260 lb
Length of wall L:= 8•ft+ 5•ft+ 4•ft L= 17ft
P
Shear v:= — v= 132.94pIf A
L
4
Overturning Mot:= P•8•ft•17 Mat=4254.121b.ft
Moment
(4•ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•4.ft
Moment
Mr= 1968 lb•ft
Mat— Mr
Holdown = 571.53 lb
Force Oft
Main Level
Wind Force P:= 4660.lb P= 4660 lb
Length of wall L:= 15•ft+ 8•ft+ 3•ft L= 26ft
P
Shear v:= — v= 179.23pIf B
L
8
Overturning Mat:= P•9•ft•26 Mat=12904.62lb•ft
Moment
(8•ft)2
Resisting M,:= 0.6•(15•psf•2•ft+ 10•psf•17•ft)• 2 + 0.6.800•Ib•8•ft
Moment
Mr= 7680lb•ft
Mat— Mr
Holdown = 653.08 lb
Force 8'ft'
•
corina
MUNTEANt1NC
CONSULTINGJENGINEER Plan 2885
Job No:15116 Sy:CM
3204 NE 166'"Avenue I Vancouver,WA 98682 Date Nov 2015 Sheet L-13
,orinamacomcast.net 1503-313-3011
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 2373•Ib P= 23731b
Length of wall L:= 7.5•ft+ 11oft+ 4oft L= 22.5ft
P
Shear v:= — v= 105.47p1f A
7.5
Overturning Mot:= P•8•ft•— Mot= 63281b ft
Moment 22.5
(7.5.ft)2
Resisting Mr:= 0.6•(15•psf.2.ft+ 10•psf•12•ft)• 2 + 0.6.600•lb•7.5•ft
Moment
Mr= 5231.25lb•ft
Mot— Mr
Holdown = 146.23 lb
Force 7'5'ft
Main Level
Wind Force P:= 3813•lb P= 38131b
Length of wall L:= 6•ft+ 7•ft+ 4•ft L=17ft
F'
Shear Wind v:= — v= 224.29plf S
4
Overturning Mot:= P•9•ft•17 Mot= 8074.59lb•ft
Moment
(4.ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8oft)• 2 + 0.6.800•Ib•4•ft
Moment
Holdown Mot Mr = 1370.65 lb Mr= 2592lboft
Force 4 ft
HITS
coring
MUNTEANtiNc.
CONSULTI N GI ENGINEER
Plan 2885
Job No:15116 Sy:CM
3204 NE 166'"Avenue I Vancouver,WA 98682
corinam(alcomcast.net 503-313-3011 Date:Nov 2015 Sheet: L-14
Interior Shear Walls at back of Garage
Main Level
Wind Force P:= 4069•lb P= 4069 lb
Length of wall L:= 18-ft L= 18ft
P
Shear Wind v:= — v= 226.06pIf B
L
Overturning Mat:= P•9•ft Mot= 36621lb•ft
Moment
(18•ft)2
Resisting Mr:= 0.6•(10•psf•12•ft+ 10•psf•9•ft)• 2 + 0.6.1200•Ib•18•ft
Moment
Holdown Mot Mr =180.5 lb Mr= 33372 lbft
Force 18'ft
III
coring
MUNTEANt,NC
CONSULTINGIENGINEER Plan 2885
Job No:15116 Sy:CM
3204 NE I66.Avenue I Vancouver,WA 98682 Date:Nov 2015 Sheet: L-15
connen ka comcast.net I 503-313-3011
WIND ON PORCH ROOF
126 MPH,EXP 13 w:= 6•ft•(4.43.psf+ 8.86•psf) w = 79.7 plf
( D /
I I
_ n
II IIII
II11
�I it
II L
lilt ost°"."4.4*44 C
iir_i
II II
I III II
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 11-ft
w•L2
M:= 2 M= 3987lbft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= — T:= C C= 398.71b
L 12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w•L Nail top and bottom chord of first truss to wall with
v:= p v= 72.49 pIf (2)16d nails at 16"o.c.(web to studs)