Permit (15) CITY OF TIGARD {pjwlf BUILDING PERMIT
* COMMUNITY DEVELOPMENT Permit#: BUP2016-00261
1117 ;� Date Issued: 02/16/2017
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102BD01503
Jurisdiction: Tigard
Site address: 12800 SW PACIFIC HWY
Project: Storquest Self Storage Subdivision: FREWING'S ORCHARD TRACTS Lot: 1
Project Description: Construction of a new,3-story self-storage facility. 1/17/2018: REPRINT permit to remove basement level from
plans and reduce total square footage.
Contractor: CAMPBELL DEVELOPMENT Owner: 12740 SW PACIFIC SP LLC
23026 N 16TH LANE SUITE 101 BY THE WILLIAM WARREN GROUP INC.
PHOENIX,AZ 85027 201 WILSHIRE BLVD STE 102
SANTA MONICA, OC 90401
PHONE: 623-434-8500 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: NEW Type of Const: IIB DC Provision Review,COM New-Bldg 11/16/2016 $178.50
Occupancy Grp: S-1 Occupancy Load: 219 DC Provision Review,COM New-Ping 11/16/2016 $178.50
Dwelling Units: 0 Additional Plan Review 11/16/2016 $400.00
Info Process/Archiving-Lg$2.00(over 11/16/2016 $130.00
Stories: 3 Height: 48 ft 11x17)
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 11/16/2016 $25.00
Value: $7,951,433 11x17)
Tig-Tual School CET-Non Residential 11/16/2016 $29,900.00
Additional Plan Review 11/16/2016 $180.00
Floor Areas: Permit Fee-COM-New Construction 11/16/2016 $36,064.90
Total Area: 92244 12%State Surcharge-Building 11/16/2016 $4,327.79
Plan Review-Fire Life Safety 11/16/2016 $14,425.96
Accessory Strutt: 0 Metro Const.Excise Tax 11/16/2016 $9,541.72
Basement: 0 Plan Review 11/16/2016 $23,442.19
Carport: 0 Cash Over 11/16/2016 $10,872.84
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $129,667.40
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Yes Protected Corridors: No
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: % Permittee Signature: `fA/ .012°/-94 1('
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
a
t Blinding Permit Application
Commercial �a 4 ., i IOP (o i It r I .) uri ' 1
Cityof Tigard 'N. a p. a ill r-ived ' /
NI g :Y: ar to A / Pamir No.' w 690/10 11460741
13125 SW Hall Blvd.,Tigard,OR 97223 plan Reva
Phone: 503.718.2439 Far:: 503.598.1960 AUG3 t) Datelsy 11 VI' ♦ , 5( erPermit S/r�f6-eoe v3
Inspection Line: 503.6394175 U2016 Date Ready- • (duns H See Page 2 for
Internet: www.tigard-or.gov Not, 1. 1) 1377.'WO Supplemental Information
' ""i E :; � ",i 3 i 0 ,,ALA 4.rr(
TYPE OF W( M Li i,,r�-`�l l/-Tr p fpoi REQUIRED DATA:1-AND 2-FAMILY DWELLING
®New constructiona ` Permit fees*are based on the value of the work
0Demolition performed.
❑Addition/alteration/replacementOther. Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application. i
❑I-and 2-family dwelling Ea Commercial/industrial Valuation: S j
❑Accessary building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
SITE INFORMATION AND LOCATION Total number of floors:
1�$r
Job site address: I27A0 SW PACIFIC HIGHWAY • New dwelling area: square feet
City/State/ZIP:TIGARD,OR 97223 Garage%arport area: square feet
Suite/bldg./apt.no.: Project name:STORQUEST SELF STORAGE Covered porch area: square feet
Cross street/directions to job site:The project site is located at the south Deck area: square feet
corner of SW Pacific Hwy and SW McKenzie Street Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST i
Subdivision:FREWING'S ORCHARD TRACTS ` Lot no.:1 Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all.
Tax map/parcel no.:2S102BD01503
•
equipment,materials,labor,overhead,and the profit for the
', ttf9" - DESCRIPTION OF WORK work indicated on this application.
90
4- Construction of a new,3-story over a partial basement,climate controlled self- Valuation: 3�
storage facility with integral/accessory leasing office; Existing building area: 0 feet .,7 ,.-,a. i
New building area: 1 square feet
0 PROPERTY OWNER 0 TENANT Number of stories: 3-stories over partial bsmat j
Name:12740 SW Pacific Hwy SP,LLC;attn:Jon Suddarth _ Type of construction: II-B
'. Address:5301 DTC Blvd Occupancy groups:
—
City/State/ZIP:Greenwood Village,CO 80111 Existing: retai`/restaura
144, Phone:(303)759-7008 Fax( ) New S-I Storage
®'APPLICANT
8 .. CONTACT PERSON "BUILDING PERMITTEES*
p Business name:Magellan Architecture Mane refer iaIeestiaddsJ
- Structural plan review fee(or deposit):
Contact name:Dirk McCulloch — —
Address:8383158°Ave NE,Suite 280
FLS plan review fee(if applicable):
City/State/ZIP:Redmond,WA 98052
Total fees due upon application:
Phone:(425)885.4300 Fax::(425)885-4303 Amount received
E-mail:diticf�magdlauarcbitecta.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted Photo Voltaic Solar Panel System.
Business name:Campbell Development;Attn:Vince Parravano Submit two(2)sets of roof plan with connection details
m and fare department access,along with the 2010 Oregon
Address:23026 N.16 Lane,Suite 101 Solar Installation Specialty Code checklist.
City/State/ZIP:Phoenix,AZ 85027 Permit fee(includes plan review 5180.00
and administrative fees):
Phone:(623)434-8500 x109 Fax:(623)434-9020 State surcharge(12%of permit fee): $21.60
CCB tic.:203714
Total fee due upon application: 5201.60
Authorized signature: a s,114-1,_.. ... This permit application expires if a permit is not obtained
within 180 days after It has been accepted as complete.
Print name: J :5R d1441A Date: 7/ 7//k,
/ /t * Fee methodology set by Tri-County Building Industry
Service Board.
1:1Building\Permits\BUP-COM PennitApp.doc 02/2412011 440.46131(11/0 /COM/WEB)
CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permus: BUP2016-00261
Date Issued: 02/16/2017
r r A 1 i, 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S102BD01503
Jurisdiction: Tigard
Site address: 12800 SW PACIFIC HWY '
Project: Storquest Self Storage Subdivision: FREWING'S ORCHARD TRACTS Lot: 1
Project Description: Construction of a new,3-story self-storage facility.
•
Contractor: CAMPBELL DEVELOPMENT Owner 12740 SW PACIFIC SP LLC 1
23026 N 16TH LANE SUITE 101 BY THE WILLIAM WARREN GROUP INC.
PHOENIX,AZ 85027 201 WILSHIRE BLVD STE 102
SANTA MONICA,OC 90401
PHONE: 623-434-8500 PHONE: 1
I
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM 1
Class of Work: NEW Type of Const IIB Permit Fee-COM-New Construction 11/16/2016 $40,599.80
Occupancy Grp S-1 Occupancy Load: 219 12%State Surcharge-Building 11/16/2016 $4,871.98
Plan Review 08/30/2016 $13,385.03
Dwelling Units: 0 Plan Review-Fire Life Safety 08/30/2016 $8,236.94
Stories: 3 Height: 48 ft .
Plan Review 11/16/2016 $13,004.84 ,
Bedrooms: 0 Bathrooms: 0• Plan Review-Fire Life Safety 11/16/2016 $8,002.98
Value: $8,961,524 DC Provision Review,COM New-Bldg 11/16/2016 $178.50
DC Provision Review,COM New-Ping 11/16/2016 $178.50
Additional Plan Review 11/16/2016 $400.00
Floor Areas: Info Process/Archiving-Lg$2.00(over 11/16/2016 $130.00
Total Area: 103962 11x17)
Accessory Struct: 0 Info Process/Archiving-Sm$0.50(up to 11/16/2016 $25.00
11x17)
Basement: 0
Metro Const.Excise Tax 11/16/2016 $10,753.83
Carport: 0 Tig-Tual School CET-Non Residential 11/16/2016 $29,900.00
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $129,667.40
Required• Required items and Reports(Conditions)
Fire Sprinkler: Yes Parapet: 1 Special Inspection(see plans)
Fire Alarm: Yes Protected Corridors: No
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will I
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1. rilt32.2
/- /
Issued By:�`�? / Permittee Signature: / �"'---"..
�'t/LE ,
811 503.539.4176 by 7:00 a.m.for the next available Inspection d ..
This pemrk card shall be kept kt a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection. 1
• Building Division
Accessibility: Barrier Removal Improvement Plan
f , ARI)
REQ► REMENT: OREGON REVISED STATUTE(ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings related
facilities shall be made to insure that the path of travel to the altered area an. e restroom,
telephones and drinking fountains are readily accessible to individuals wi .' abilities unless
such alterations are disproportionate to the overall alterations in terms ..cost and scope.
(2) terations made to the path of travel to an altered area may be de: .ed disproportionate to
the 'verall alteration when the cost exceeds twenty-five per-cen 5%).
VALUATION: Total of all y ovation,alteration or modification being..ne,
excluding pain :and wallpapering [1] $
MULTIPLIER .barrier removal require •ent): x .25
TOTAL BUDGET FO• :ARRIER ' OVAL: [2] $
ELEMENTS: In choosing which accessible el .. s to provide under this section,priority shall be given
to those elements that will pro '.e th .,eatest access. Elements shall be provided in the
following order.
(a) Parking $
(b) An accessible en. ce: $
(c) An accessible •ute to the altered area: $
(d) At least . accessible restroom for each sex or a single unis
restr.. : $
(e) cessible telephones: $
Accessible drinking fountains:and,
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line[2]of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
f City of Tigard
IIICOI
MMUNITY DEVELOPMENT DEPARTMENT 1
T A uD Building Permit Review — Commercial - With Land Use
VIM
Building Permit #: /G'— CX)026 I
Site Address: 4 P G Ci L►-L /--i vi.„w e j Suite/Bldg#:
Project Name: -Sto( I'S fi
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review t ,.�L.,, pa-e-t.wwk- •
Proposal: O 01»(l tT----N U ( C J►\tiA vAli eeJ n-► t+-
xVerify site address/suite#exists and active in permit system.
River Terrace Neighborhood: 0 Yes oliT No
g Land Use Case#: CJiQ 20 no- boot)! , CP02.."Z.0 16--0000 Z'
1 Plans Match Approved Land Use:
Z Site Plan % Landscape Plan 0 Other
0 Urban Forestry Plan lig Elevation Plan /� ,
Building Height: Maximum Height 41 Actual Height `/I
gConditions Met: 0 Prior to Submittal Prior to Permit Issuance
❑ Business license:
Exists: 0 Yes 0 No,applicant notified to obtain business license
Public Facilities Improvement(PFI)Permit:
Required: 0 Yes,applicant was notified 0 No Applied For: Yes 0 No,stop intake
Notes: W GLi I l 0 eb to 6 0 J(j1 h 1 C--r ek 1";v1 `fib 1 S 1-10 en-12-
Approved
-2Approved by Planning: Al 0-w, _ Date: 6 ) 7V/ / o
Revisions(after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Ap roved
Building Permit Submittal /
i Original Submittal Date: g/3'( i 1
Site Plans: # 3
Building Plans: # 5
Building Permit#: DrEnter building permit#above.
Workflow Routing: ErPlanning Lngineering D--Permit Coordinator 11Buildirig
Workflow Sign-off Ci'Sign-off for Planning(include notes from planning review)
Route Application Documents: 0—Building original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: C-----')C Date: 3/1„hj/j f°
I:\Building\Fams\BldgPermitRvw_COM WithIandUse 070915.docx
I
a 1
Engineering Review
Slope at building pad:
PFI Permit#:
Conditions"Met"prior to issuance of building permit
Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
Water Quality/Quantity Facility.
Assess Water Quality Fee in-lieu: 0 Yes No
Assess Water Quantity Fee in-lieu: 0 Yes No
LIDA Facility on lot: 0 Yes No
0 NOT A a t rov:a a nginee 'a •• Date
Notes: �� i� All . . _ 1 �. ,� !.,. 4. - ,= r�
Approved by Engineering ,iz.; Date:
Revisions(after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Permit Coordinator Review
0 Conditions"Met"prior to issuance of building permit
Approved,NOT Released: Date: 49:4/4"//Notes: Znz">( t r ti•►t 4G€ 'kc.c ell,
Revisions(after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
?4 SDC Fees Entered: Wash Co Trans Dev Tax: %..Yes 0 N/A
Tigard Trans SDC: 0 Yes ,a.N/A
Parks SDC: ' Yes 0 N/A
OK to Issue Permit
Approved by Permit Coordinator: 614'‘-be-07'1^ 112.-e-7—Th ate: ///1/C.
-* �O --/---77—, oa:770,--(2.-KS ! z 1 v ie?._ 115 e CRt2
EXc i7 H�rrtC- 3 �12 /9)ri
AlE-�✓ �!�✓p Phis..Per:
1:\Building\Forms\BldgPdmitRvw_COM_WithlandUse_070915.docx
r
T . 425485-43(x.
mageilanxx 425-8854303
838'3 1 t3th Ave.NL,.'2k
oveita exi, 9go5 .
RECAVED
22 November 2017 (updated) NOV 2 8 2017
CITY . ?Iv aARD
BUILDING DIVISION
Project: StorQuest—Tigard (Magellan Project No. 15-133)
Permit No.: BUP2016-00261
Subject: Basement Elimination Revisions
To Whom It May Concern,
The following is a summary of changes made to the referenced plan set with respect to the
elimination of the basement level for this project:
Civil:
Revisions included in Civil Plans dated 11/9/2017:
Sheet C2.0: The Grading has been revised on the west side of the building due to the
elimination of the stairway exit door. Spot grades for the door landing have been
eliminated and the contours adjusted accordingly.
Sheet C3.0: The storm lateral for the basement foundation drain has been removed from
the east side of the building. The lateral previously connected to the storm system between
Catch Basins 6 & 8.
Architectural & Structural:
Revisions included in the revised Architectural sheets dated 2017-11-10 include the
following as well as corresponding changes to the Structural (SSF) and Metal Building
Systems (Kiwi-II) drawings and supporting calculations:
Sheet A2.10, et al.: The entire basement level has been eliminated thus this sheet has
been eliminated from the drawing set. Associated section drawings, enlarged stair sections
and enlarged stair plans, etc. have been modified.
Sheet A2.20, et al.: Basement egress stair previously located between grids 14-16 and A
& B has been eliminated. This stair only served as egress from the basement level—its
G:\Projects-Current\15\15-133 StorQuest Tigard OR\Correspondence\Ghent\2017-11-22_StorQuest-Tigard_BasementElimSummary_Updated_15-133.docx
Page 1 of 3
1
magelian
425-885-4300
Fax 425485 3q3
8,83 l i Eh A+,v
Tkd maxi,ani CA€aY52
elimination does not impact the upper levels. Previous exterior stair from this omitted
stairwell at the west wall has been eliminated. Storage has been reintroduced in place of
the omitted stair on Level 1. Corresponding revisions have been made to 'North Stair#102'
as it no longer needs to extend to the Basement level. The 'North Elevator' machine room
has been brought up from the previous Basement level and located at grid 'L' between grids
16 & 17.
• Exterior elevations, Section drawings, enlarged plans, schedules and relevant
details have been revised according to the above changes.
• Storage lockers (from 8' AFF to bottom side of Level 2 slab-on-deck) have been
added throughout Level 1. Reference sheet KS-3. Storage lockers are non-
structural items and will be properly addressed in fire sprinkler design as a
deferred submittal.
• Updated foundation structural calculations related to these changes have been
provided by SSF and Kiwi-Il
Here is a listing of impacted and revised/replaced sheets within the compiled resubmittal
drawing set:
A0.10
C0.1 C4.0
C1.0 C4.1
C2.0 C4.2
C3.0
Please note that the Civil"C"sheets were not included in the original Building Permit set as
they had been approved under a separate Site Work Permit(S1T2016-00013)but have been
included in this revision submittal per the City reviewer's request.
A1.10 A4.50
A2.20 A5.20
A3.20 A5.30
A4.10 A7.10
A4.20 A9.10
A4.30 A9.30
A4.40
51-1 53.2
52.1 54.1
53.1
Continued next page...
G:\Projects-Current\15\15-133 StorQuest Tigard OR\Correspondence\Client\2017-11-22_StorQuest-Tigard_BasementElimSummary_Updated_15-133.docx
Page 2 of 3
TEL425-885-4300
mag2ilan K.425485-4303
ita�,04i.fi8thAve.'ti[z, 28,0limim nd,WA 98052
KS-1 KS-5
KS-2 KS-6
KS-2a KS-7
KS-3 KS-8
KS-4 KS-9
KS-4a D-1 through D-7
I trust that the above summary will be sufficient to complete the review of this project.
Should there be further questions or clarifications needed please do not hesitate to contact
me directly at 425-885-4300 or via email at dirk@magellanarchitects.com.
Respectfully,
Senior Project Manager
Magellan Architecture
G:\Projects-Current\15\15-133 StorQuest Tigard QR\Correspondence\Client\2017-11-22_StorQuest-Tigard_BasementElimSummary_Updated_15-133.docx
Page 3 of 3
ROGERS
ENGINEERING
Structural Engineering■Building Design■Code Consulting■Inspection Services
558 S.E.Jackson St.
Roseburg, Oregon 97470
Pk: (541) 672-0315
Fax: (541)672-1787
rojzersina rosenet.net
January 10, 2018
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Mark VanDomelen
Building Official
Rogers Engineering: Structural Review
Project: Storquest Self Storage—12740 SW Pacific Ave.
Rogers Engineering has completed a structural plan review of the submittal for the Storquest Self
Storage project on behalf of the City of Tigard. Rogers Engineering recommends approval of
the associated construction documents.
Documents are as specified on the attachment, Project Documents.
Should you have questions or need additional information,contact me at your convenience.
Respectfully Submitted,
477i)/ ,
Tom Rogers,P.E., CBO
Project Documents
Storquest Self Storage
12740 SW Pacific Ave.
These documents exclude the basement shown in the previously designed and approved
documents.
Plans prepared by Magellan Architects—Sheet A0.10 revision(5) dated 11-10-17 with drawing
index—for reference
Correspondence by Magellan Architects dated 22 November 2017 noting changes
Structural drawings by SSF Structural Engineers dated Nov. 9, 2017
Structural calculations by SSF Structural Engineers dated November 9, 2017
Drawings by KIWI II dated 2017-11-10
Structural calculations by KIWI II dated 11/20/17
Correspondence by Magellan Architects dated 20 December, 2017—plan review response
Calculation cover page by SSF Engineers with Oregon stamp
KIWI II drawing KS4a dated 2017-12-19
Response by Magellan Architects on December 26,2017 review comments—dated 2018-01-08
SSF Structural Engineers drawing S2.1 (footing added at grid 0,18)
Footing calculations by SSF Engineers (2 pages)
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
INCity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
P . Transmittal s ttal Letter
r;t,,\P n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Da A N P,‘SU14 ( e:'.a lc1 A3 e B •) DATE RECEIVED:
DEPT: BUILDING DIVISION RECFNED
FROM: 3 d, 4- P. /c --"z,,, NOV 2 $ 2017
COMPANY: -n„,,.. ki,,t ll*a 46 (n/arrc.1 C.>1..6C.>1..6a P , IAA_ BUIL 3:i DIVISION
v
PHONE: ( 1'1'1 ) 6 2-'1 - 9'O 1.6 By: Y
RE: I2.7410 Sw ?4,c 1-E c !-f wy • Bu P 2Co01.6 - C 2-6
(Site Address) ( (Permit Number)
3-1-b.'- Q 1/40-ts+ 5 t' l-c- S+o c ac,�
(Project name or subdivision name and lot number) o
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
( i) Additional set(s) of plans. (3 ) Revisions: Arc o /Sfr"c-1wb 1 / CA.'
( 3) Cross section(s) and details. (3 Wall bracing and/or lateral analysis.
( 3) Floor/roof framing. tj/A Basement and retaining walls.
(3 ) Beam calculations. ( 3 ) Engineer's calculations.
Other(explain):
REMARKS: tp(a n R w t.il ovt S . Eli t V" t o A+1 -E, g a Stir✓! t -}-
1.Gvt- I °Al./ , R�.'r.rcd sk¢a-♦ r a»c1 C4 ICT . 44,-4_ ;Ac iKcle.cl i•1
pl.. 3-e4- . D-c 1-k-z. S k"M w►•o'ry She-la'1— i S 4 I.3'. i e.c Ltd-e_.1
FOR F ICE USE ONLY
Routed to Permit echnician: Date: t ^ Initial .
Fees Due: es El No Fee Desc ption. Amount D ue:
.2 Rert� --aka <(i $ ,e ) V
$
$
$
Special
Instructions:
Reprint Permit(per PE): es ❑No [ Done
Applicant Notified: Date: Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
CITY OF TIGARD BUILDING PERMIT
: •' COMMUNITY DEVELOPMENT Permit#: BUP2016-00261
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/16/2017
7"I t;A l<.C� g Parcel: 2S102BD01503
Jurisdiction: Tigard
Site address: 12800 SW PACIFIC HWY
Project: Storquest Self Storage Subdivision: FREWING'S ORCHARD TRACTS Lot: 1
Project Description: Construction of a new,3-story self-storage facility.
Contractor: CAMPBELL DEVELOPMENT Owner: 12740 SW PACIFIC SP LLC
23026 N 16TH LANE SUITE 101 BY THE WILLIAM WARREN GROUP INC.
PHOENIX,AZ 85027 201 WILSHIRE BLVD STE 102
SANTA MONICA, OC 90401
PHONE: 623-434-8500 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: NEW Type of Const: IIB Permit Fee-COM-New Construction 11/16/2016 $40,599.80
Occupancy Grp: S-1 Occupancy Load: 219 12%State Surcharge-Building 11/16/2016 $4,871.98
Dwelling Units: 0 Plan Review 08/30/2016 $13,385.03
Stories: 3 Height: 48 ft Plan Review-Fire Life Safety 08/30/2016 $8,236.94
Plan Review 11/16/2016 $13,004.84
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 11/16/2016 $8,002.98
Value: $8,961,524 DC Provision Review,COM New-Bldg 11/16/2016 $178.50
DC Provision Review,COM New-Ping 11/16/2016 $178.50
Additional Plan Review 11/16/2016 $400.00
Floor Areas: Info Process/Archiving-Lg$2.00(over 11/16/2016 $130.00
Total Area: 103962 11x17)
Accessory Struct: 0 Info Process/Archiving-Sm$0.50(up to 11/16/2016 $25.00
11x17)
Basement: 0 Metro Const.Excise Tax 11/16/2016 $10,753.83
Carport: 0 Tig-Tual School CET-Non Residential 11/16/2016 $29,900.00
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $129,667.40
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Yes Protected Corridors: No
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19; -•r 1.8I 32.23
f.
Issued By: Permittee Signature:
all 503.639.4175 by 7:00 a.m.for the next available inspection da e.
This permit card shall be kept in a conspicuous place on the job site until completion of the project
Approved plans are required on the job site at the time of each inspection.
iiir
j BiildinPermit Application
Commercial
t t 1.0R Or"rl(.t t Sly 0V1.1'
City of Tigard > iced
,71
4 13125 SW Hall Blvd.,Tigard,OR 97223 )` +TSaie/By; (y A / Permit No.: yGi /l"!� /
g Phone: 503.718.2439 Fax: 503.598.1960 Plan Rcw�t�w Ov
DaYel$ Cher Permit:
TIGARDInspection Line: 503 639.4175 I„1(.1�i 3 t) 1016 Date ady / :I l rr„ds 61��/26-4 /3
Internet: www.tigard-or.gov H See Page 2 for
d F a` Notifie$dlMetho !� %, -"'�' Supplemental Information
TYF'EOFw �r sx 'y �'``Z
t,' 114y 1 d +'i-:-,,,,,trot, REQUIRED DATA:1-AND 2-FAMILY DWELLING
®New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement 0 Other:
equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
0 Accessory building ❑Multi-family Number of bedrooms:
❑Master builder
❑Other: Number of bathrooms:
1Ay B SITE INFORMATION AND LOCATION Total number of floors:
Job site address:'t27217SUL W PACIFIC HIGHWAY , New dwelling area: square feet
City/State/ZIP:TIGARD,OR 97223
Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:STORQUEST SELF STORAGE
Covered porch area: square feet
Cross street/directions to job site:The project site is located at the south
Deck area: square feet
corner of SW Pacific Hwy and SW McKenzie Street
Other structure area: square feet
REQUIRED DATA:COMMERCIAL.-USE CHECKLIST
Subdivision:FREWLNG'S ORCHARD TRACTS I Lot no.: I Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S102BD01503 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the •
DESCRIPTION OF WORK work indicated on this application.
Construction of a new,3-story over a partial basement,climate controlled self- Valuation: ,590
storage facility with integral/accessory leasing office; Existing building area: 0 square feet
\ New building area: 102,462 square feet
PROPERTY OWNER I ® TENANT Number of stories: 3-stories over partial bsmnt
Name:12740 SW Pacific Hwy SP,LLC;attn:Jon Suddarth
Type of construction: II-B
V\ Address:5301 DTC Blvd
Occupancy groups:
City/State/ZIP:Greenwood Village,CO 80111
Existing: retail/restaura
Phone:(303)759-7008 Fax:( )
New: S-1 Storage
tti C. El APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name:Magellan Architecture
(flegce refer to fee schedule)
Contact name:Dirk McCulloch Structural plan review fee(or deposit):
Address:8383 158'h Ave NE,Suite 280 FLS plan review fee(if applicable):
City/State/ZIP:Redmond,WA 98052 Total fees due upon application:
Phone:(425)885-4300 I Fax::(425)885-4303 Amount received:
E-mail:dirk@magellanarchitects.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Campbell Development;Attn:Vince Parravano Submit two(2)sets of roof plan with connection details
Address:23026 N.16a Lane,Suite 101 and fire department access,along with the 2010 Oregon
Solar Installation Specialty Code checklist.
City/State/ZIP:Phoenix,AZ 85027 Permit fee(includes plan review
and administrative fees): $180.00
Phone:(623)434-8500 x109 , Fax:(623)434-9020
State surcharge(12%of permit fee): $21.60
CCB tic.:203714
Authorized signature
L Total fee due upon application: $201.60
r This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: jo4 C cam, I Date: 772,7//6
,�' rrY•'� * Fee methodology set by Tri-County Building Industry
Service Board.
I:lBuilding\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
w
a
p Building Division
■
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQ► REMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings • . related
facilities shall be made to insure that the path of travel to the altered area an. + e restroom,
telephones and drinking fountains are readily accessible to individuals wi ..sabilities unless
such alterations are disproportionate to the overall alterations in terms .'cost and scope.
(2) terations made to the path of travel to an altered area may be de: ed disproportionate to
the 'verall alteration when the cost exceeds twenty-five per-cen 5%).
VALUATION: Total of all - ovation,alteration or modification being..ne,
excluding pain: g and wallpapering: [1] $
MULTIPLIER(2 ' 0 barrier removal require ent): x .25
TOTAL BUDGET FO ARRIER ' OVAL: [2] $
ELEMENTS: In choosing which accessible ele s to provide under this section,priority shall be given
to those elements that will prov'.e th- • eatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entr. ce: $
(c) An accessible .ute to the altered area: $
(d) At least .. e accessible restroom for each sex or a single unise
restro. : $
(e) • cessible telephones: $
Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
T r City of Tigard
IIIp COMMUNITY DEVELOPMENT DEPARTMENT
e
T l c A R D Building Permit Review — Commercial - With Land U s e
Building Permit #: ��0/(4'_ oc)02�I
oo
Site Address: 9 P 0 G (.. /-J-t - ivc;,,,j Suite/Bldg#:
Project Name: 51-0(cS 1-
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review ,,,, l&c.,,, �e,t.wu „
Proposal: hi/ l4 Y1 r f �) tr 1, t/,\t lit IA) "t?r(11-1 4{—
Verify site address/suite# exists and active in permit system.
yr River Terrace Neighborhood: ❑ Yes No
Xi Land Use Case#: al191"C(J,- O 00°I , SDQt.t3 I e . 000 o Z
Plans Match Approved Land Use:
Zi Site Plan % Landscape Plan ❑ Other:
❑ Urban Forestry Plan V Elevation Plan
Building Height: Maximum Height 4 J Actual Height 1 J
gConditions Met: ❑ Prior to Submittal (Prior to Permit Issuance
❑ Business License:
Exists: ❑ Yes ❑ No,applicant notified to obtain business license
iff Public Facilities Improvement(PFI) Permit:
Required: ❑ Yes,applicant was notified ❑ No Applied For: Yes ❑ No,stop intake
Notes: C n(L1 il LJ/11 to 19 iQ J Oh'd (PI-c-X t v^i)f ,j 0 ii -t1 ci rel U2_
Approved by Planning: Al 6y-w_ ._ Date: '8 ) :?V/ /6
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal (
Original Submittal Date: g / 9/(L'
Site Plans: # 3
Building Plans: # ±
Building Permit#: a-Enter building permit#above.
Workflow Routing: ['-Planning [ngineering 0--Permit Coordinator JC—Building
Workflow Sign-off: [-Sign-off for Planning(include notes from planning review)
Route Application Documents: 0-Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: C7-:\. . 0 Date: /3713de/,0
I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_070915.docx
1
i
Engineering Review
Slope at building pad:
PFI Permit#:
Conditions "Met"prior to issuance of building permit
Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes No
Assess Water Quantity Fee in-lieu: ❑ Yes No
LIDA Facility on lot: ❑ Yes No
❑ NOT A•prov:• b Engineeri !: Date
Notes: -
Approved by Engineering: jili , Date:
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
pproved,NOT Released: Date: 9/6/4°'
Notes: [„FiyLeir%T t rn,,..-L f '2 -e tu,e..-at
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
7SDC Fees Entered: / ` Wash Co Trans Dev Tax: 4Yes ❑ N/A
/ Tigard Trans SDC: ❑ Yes )?f,N/A
Parks SDC: 'Yes ❑ N/A
AfOK to Issue Permit /�_
Approved by Permit Coordinator: ( e�5/'! o-Y+--, Date: /1/7//6
% Al” --,----7)—, 02�&2 :KS /-
- nIvf? 1L5 CRI 75-
/971/1
I:\Building\Forms\BldgPemiitRvw_COM_WithLandUse 070915.docx
Site Address:
11111 Building Division
TIGARD Deferred Submittal Transmittal Letter
TO: knit DATE RECEIVED:
DEPT: BUILDING DIVISION
FROM: ti(L TG►-1{0.-Vice "LC:)
COMPANY: LUAP e/C -e-ki�Crs e, rt-
PHONE: 00 Z-7(:)%"sc.R1"'-'7 By.
RE: ,I Z jC) -1etLt ,c.._ 14-1„)/'
13I) [� ,1R(6 op i
(Site Address) (Permit/ ,se Number)
STo r Oak u est"
(Project name r subdivision name and lot number)
Valuation of Deferred Submittal: $ 1 ill! ,
ATTACHED IS THE FOLLOWING DEFERRED SU ITTAL ITEM:
Copies: Description: , )
`- rune )- _ ,.S.J.._._e,._rw., _......_......_...._. I ti _
PI Vi
Remarks: \,1
\\I
NOTE:Documents for deferred submittal e,/. shall be submitted to the registered design professional in
responsible charge who shall review them .,• forward them to the building official with a notation indicating that
the deferred submittal documents have bei reviewed and been found to be in general conformance to the design of
the building.The deferred submittal itegas shall not be installed until the design and submittal documents have been
approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2
f FOR OFFICE USE ONLY
Routed to Permit Techmc> : Date: Initials:
Fees Due: ❑ Yes . No Fee Description: Amount Due:
Deferred Submittal Fee: $
Additional fee based on valuation: $
Other: $
Total Fees Due: $ as- 83 . 4 0
Special
Instructi s:
Reprint Permit (per PE): ❑ Yes LANo ❑ Done
Applicant Notified: Date: 777)-1/1.1Initials: ;-2' �
Q a`
The fee for processing an reviewing deferred plan subaI shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in
addition to the project plan review fee based on the total project value.
I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07
'
TIGARD
City of Tigard
March 1,2018
William Warren Group, Inc.
Attn: Scott McLain
959 South Coast Dr., #200
Costa Mesa, CA 92626
Re: Permit No. BUP2016-00261
Dear Applicant:
The City of Tigard has processed a refund for overpayment of permit fees on the above
referenced permit for the following:
Site Address: 12800 SW Pacific Hwy
Project Name: StorQuest
Job No.: N/A
Refund: ® Check#227788 in the amount of$10,872.84.
0 Credit card"return"receipt in the amount of$
0 Trust account"deposit"receipt in the amount of$
Notes: A change in the scope of work to remove the basement level resulted in a reduction
in project valuation and permit fees. Overpayment of permit fees is refunded.
If you have any questions please contact me at 503.718.2430.
Sincerely,
Dianna Howse
Building Division Services Coordinator
Enc.
\Building\Refunds ais „ lfaiifaAg Pregon 97223 • 503.639.4171
TTY Relay: 503.684.2772 • www.tigard-or.gov
CITY OF TIGARD- Building Division
1/17/2018
Project: StorQuest-12800 SW Pacific Hwy
Permit#: BUP2016-00261
Removal of basement level resulted in reduction in total square footage
from 102,462 sf to 92,244 sf resulting in a refund of permit fees paid.
Project Valuation $ 8,961,524.40 $ 7,951,432.80
Fee Description Paid New Refund
Permit Fee $ 40,599.80 $ ✓ 36,064.90 $ 4,534.90 ' --
12%State Surcharge $ 4,871.98 $ ,/ 4,327.79 $ 544.19
Plan Review-Structural $ 26,389.87 $ ;/ 23,442.19 $ 2,947.68 ✓
Plan Review- Fire Life Safety $ 16,239.92 $ ,i 14,425.96 $ 1,813.96
DC Prov Review- Bldg $ 178.50 $ 178.50 $ -
DC Prov Review-Ping $ 178.50 $ 178.50 $ -
Info Process/Arch Lg$2.00 $ 130.00 $ 130.00 $ -
Info Process/Arch Sm $0.50 $ 25.00 $ 25.00 $ -
Metro Const Excise Tax
$ 10,753.83 $ ✓ 9,541.72 $ 1,212.11 ✓
Tig-Tual School CET $ 29,900.00 $ 29,900.00 $ -
Additional Plan Review $ 400.00 $ 400.00 $ -
Additional Plan Review $ - $ ✓ 180.00 $ (180.00)
Totals: $ 129,667.40 $ 118,794.56 $ 10,872.84
Cash Over
f `
Dianna Howse
From: Scott McLain <smclain@williamwarren.com>
Sent: Wednesday,January 17, 2018 3:54 PM
To: Dianna Howse
Cc: #Building Permit Technicians
Subject: RE: BUP2016-00261 - StorQuest - 12800 SW Pacific Hwy
Hi Dianna,
That is great news and thank you! Here is the ownership and mailing address for the refund check.
Ownership Entity: 12740 SW Pacific SP, LLC
Mailing address:
The William Warren Group, Inc.
Attn: Scott McLain
959 South Coast Drive #200
Costa Mesa, CA 92626
Thanks
Scott P. McLain
THE WILLIAM WARREN GROUP,INC.
StorQuest Self Storage Properties
Construction Manager
(949)677-9086 Mobile
(949)272-2841 Office
www.williamwarren.corn
From: Dianna Howse [mailto:Dianna@tigard-or.gov]
Sent:Wednesday,January 17, 2018 3:09 PM
To: 'smclain@williarnwarren.corn'<smclain@wi!liamwarren.com>
Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject: BUP2016-00261-StorQuest-12800 SW Pacific Hwy
Hello Scott,
The revised plans(removal of basement level)are ready to be picked up for this project.
The reduction from 102,462 sf to 92,244 sf resulted in a reduction of permit fees and a refund will be processed for the
difference. I have attached a file containing the refund information. Please allow 3-4 weeks to process the refund and
the check will be mailed to William Warren Properties Inc.
In order to process this refund, please provide me with the mailing address for William Warren Properties, Inc. at your
earliest convenience.
You can pick up the revised plans and permit Monday-Thursday, 8:00 am to 4:30 pm. We are closed on Fridays.
Thank you and please let me know if you have any questions.
1
. °
Dianna L. Howse
Building Division Services Supervisor
City of Tigard I Community Development
1313SSVVHall Blvd I Tigard, OR 97223
503-718-2430 Direct I 503-718-2439 Permits
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedu|e."
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
111 : M
Request for Permit Action
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 •www.tigard-or.gov
TO: CITY OF TIGARD
Building Division
13125 SW Hall Blvd.,Tigard, OR 97223
Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov
FROM: ❑ Owner ❑ Applicant ❑ Contractor frCity Staff
Check(✓)one
REFUND OR Name:
INVOICE TO: (Business or Individual) /, // L,',q/i �, / 17�— / s //,v
Mailing Address: ,5"--41 Se-it/'7/ C'C7 7' , J/2/ / C' .,2c o
City/State/Zip: CO-Pi-"5L A/C °� e f-" tel G� G,
Phone No.: 9c/' — 6 77 Afez-97,V
PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (✓):
❑
CANCEL/VOID PERMIT APPLICATION.
REFUND PERMIT FEES (attach copy of original receipt and provide explanation below).
❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below).
❑ REMOVE/REPLACE CONTRACTOR ON PERMIT(do not cancel permit).
Permit#: `'";26'/6 -- 00,2 6 /
Site Address or Parcel#: / fa 69 ,-5-et) /ate(;/fr-/
Hwy
Project Name: 57-7172-. delSubdivision Name: Lot#:
EXPLANATION: .?6-41 'fork /&/ d/' L s Gz-C�i7t�•�1 c�/`7
_ 96/,Sp
lit / re //r /-'a^/.,
hr>A G'7/E72,/0/9//t7t 7t1,Zt,v7
�5�Signature: rZ Date: /�/ //�'
Print Name: /•7nJn/, //o,12/.5' /
Refund Policy
1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of:
• Any fee which was erroneously paid or collected.
• Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort
has been expended.
• Not more than 80%of the application or permit fee for issued permits prior to any inspection requests.
2. All refunds will be returned to the original payer in the form of a check via US postal service.
3. Please allow 3-4 weeks for processing refund requests.
FOR OFFICE USE ONLY
Route to Sys Admin: Date By Route to Records: Dates J= /7 By$�i
Refund Processed: Date 2
3 /� B� Invoice Processed: Date By
Permit Canceled: Date ��$9 By,4 Parcel Tag Added: Date By
I:\Building\Forms\RegPermitAction_092314.doc
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
a
III Transmittal Letter
i (,,\RI) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: 'Da.A N eASvv, e I3..►;ld-;A. e e+.) DATE RECEIVED:
DEPT: BUILDING DIVISION
D
FROM: S co }t- P. Me. (--4v1
/�N 0 V 2 8 201[[7
COMPANY: 7-14,e. t;11,'q.v Wa.r�yt ' Ge... p _ Irtt
BUILDING DIVISION
PHONE: C i`i . ) 61-1 - ,0 8 6
By:
RE: 127 4/0 S w Pi-Fi c. iiw! • B N P Zo I.C - co 2 I
(Site Address) (Permit Number)
3-Fur G c-t- S e l-•F- S+o,r ae-
(Project name or subdivision name.and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: I Description: I Copies: I Description:
( 3) Additional set(s) of plans. (3 ) Revisions: Arc ii /S÷rKrre4 I / CI'v;1
( 3) Cross section(s) and details. (S Wall bracing and/or lateral analysis.
( 3) Floor/roof framing. tj/A Basement and retaining walls.
f 3 ) Beam calculations. ( 3 ) Engineer's calculations.
Other(explain):
REMARKS: Ft q,t R v i si ovi S . En v.1 i A A+1 - g As r wl.r vt -}--
r"Gve- I or►ly , Rev;.rr-d s1,42A-♦r a.al C' iCT . a, _ ;AclKdccl
Pl..: S•G-I- , D•L l-1-a1/4 S 6.M wto‘ry .5 hex- S A 1.. ►Jt c LK J1.4_4 •
FOR F CE USE ONLY
Routed to Permit echnician: Date: ,° '�
la
Initial •
Fees Due: es 0 No Fee Desc ption.
Amoun ue:
'2 (-(61-c —a?\ v( $ :,"'
$
$
Special $
Instructions: I
Reprint Permit(per PE): es I 0 No I 0 Done
Applicant Notified: I Date:
Initials:
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
City of Tigard
Tel: 503.718.2439
Location: Inspection Date:
12800 SW PACIFIC HWY, TIGARD, OR, 97223
Record Type: Record ID:
Commercial - Building BUP2016-00261
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - CofO
Comments:
Violation Summary:
Inspector Contractor