FINAL SUMMARY LETTER
Date: February 13, 2017
Job#: 11606463
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: River Terrace North Pump Station&Force Main#6631
Address: SW Roy Rogers Rd.—Tigard, OR
Permit#: BUP2016-00001
Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the
following item(s)per our inspection reports only:
Reinforced Concrete
Cast-In-Place Anchors, Adhesive Anchors, Expansion Anchors &Screw Anchors
Structural Masonry
Structural Steel
The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance
report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the"As-Built Condition"or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by
CTI, CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially
generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance
of the non-compliance items and as-built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:1Projects\Genera112016\T1606463102-13-17 Final Letter,doc Updated 11/30/11
Date: February 13, 2017
Job#: T1606463
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
/7/
Steven W. Leach
Project Manager
SWL/jng
cc: Clean Water Services—Mike Kebbe KEBBEM@CLEANWATERSERVICES.ORG
City of Tigard Building Division—Walter'Chip' Barnett WALTER@TIGARD-OR.GOV
Peterson Structural Engineers—Michael Puntney MIKE.PUNTNEY@PSENGINEERS.COM
Murray Smith&Associates—Eddie Kreipe EDDIE.KREIPE@MSA-EP.COM
Rotschy Inc—Nels Homola NELS.HOMOLA@ROTSCHYINC.COM
Rotschy Inc—Craig Homola CRAIGH@ROTSCHYINC.COM
Carlson Testing, Inc.
Incompleted Items List(NCL)
Feb 13,2017
T1606463.
Project Name: RIVER TERRACE NORTH PUMP STAT & FORCE MAIN #6631
Project Address: SW ROY ROGERS RD TIGARD OR
Permit No: BUP2016-00001
P.O.No: PROJECT NO. 6631
Project Manager: STEVEN W. LEACH
Item# Insp. Date Item Description Compliance CTI Sign-Off Date
Corrected
1 AV 07/07/2016 WRONG EPDXY USED - HILTI HIT-RE 500 V3 INSTEAD OF ACCEPTABLE PER SUBMITTAL STEVEN W. LLEACH 02/13/2017
HILTI HY-200. 05500-3 DATED
07/07/2016.
CC:CLEAN WATER SERVICES - MIKE REBBE
CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT
PETERSON STRUCTURAL ENGINEERS - MICHAEL PUNTNEY
MURRAY SMITH & ASSOCIATES - EDDIE KREIPE
ROTSCHY INC - NELS HOMOLA
Page: 1
G R 0
9750 SW Nimbus Avenue
Beaverton,OR 97008-7172
P 503-641-3478 fI 503-644-8034
December 2, 2016 5666-B C.O.SUMMARY LTR
Murray, Smith &Associates, Inc.
121 SW Salmon Street,Suite 900
Portland, OR 97204
Attention: Eddie Kreipe, PE
SUBJECT: Summary of Construction Observation Services
River Terrace North Pump Station and Force Main, PN 6631
Tigard,Oregon
GRI has provided geotechnical engineering services for the above-referenced project. GRI completed a
geotechnical investigation for the project, and results of the investigation were provided in a report to
Murray, Smith & Associates, Inc. (MSA), titled "Geotechnical Investigation, River Terrace North Pump
Station and Force Main, PN 6631,Tigard,Oregon"dated September 11, 2015.
The general and earthwork contractor for the project is Rotschy, Inc., of Vancouver,Washington. The civil
engineer for the project is MSA, and the structural engineer for the project is Peterson Structural Engineers,
Inc., both of Portland,Oregon.
GRI's construction observation services were limited to the pump station site. GRI conducted site visits for
the pump station project between April 22 and November 17, 2016, to observe site preparation and
benching for new embankment fill, full time installation of aggregate piers, installation of subdrainage,
placement and compaction of embankment fill, subgrade evaluation and backfilling for the wet well and a
deep manhole, and subgrade and backfilling for the valve vault/control building. Our site visits were
documented in Site Visit Reports that were distributed to MSA.
In our opinion, the work observed was completed in substantial conformance with the plans and
specifications and the recommendations provided in our report for the project. Please contact the
undersigned if you have any questions or if we can be of further assistance.
Submitted for GRI, AO PRO/%
/ 1358PB
l.-/ / I
X41 93 ‘
Renews 12/2016
A. Wesley Spang, PhD, PE, GE Keith S. Martin, PE, GE
Principal Senior Engineer
This document has been submitted electronically.
Providing geotechnical and environmental consulting services since 1984
PORTLAND OFFICE
P E 9400 SW Barnes Rd.
Suite 100
PETERSON STRUCTURAL ENGINEERS Portland,OR 97225
Phone:503.292.1635
2/2/17
Eddie Kreipe,PE
Murray, Smith&Associates
121 SW Salmon St., Suite 900
Portland OR 97204 File: PSE\14-200-10
Re: CWS River Terrace North Pump Station: Structural Observation Summary Memo
Dear Eddie:
The following memorandum has been generated to provide a final summary of PSE's structural
observations performed during the erection of the subject structure. A total of six observation reports, some
of which represented multiple visits to the site,were generated and provided to the owners for their records.
These observations were performed at specific predetermined construction milestones as outlined in the
permit documents. Based on our continued observations and subsequent communications with the design
team and contractors, it is our understanding that all elements previously mentioned in the observation
reports have been addressed, with the exception of the following items which were identified while onsite
on January 6t,2017:
1) The unistrut frame supporting electrical equipment on the main floor level was missing an anchor
bolt from each of its two base plates. These should be installed as originally designed.
2) Pipe bracing and hardware appeared to use dissimilar metals in contact with one another at several
locations. These braces were generally stainless steel with stainless hardware, or galvanized steel
with stainless fasteners.PSE does not anticipate significant corrosion,but staining may occur.
From our discussions with our client, it is our understanding that the above item #1 will be mitigated per
the original design documents, while item #2 elements will be mitigated or accepted "as-is" on a case by
case basis by the owners. Following the adjustments/acceptance of the above items, PSE has determined
that the subject structure has been constructed in compliance with the permit documents.
Thank you and please call if you have any questions.
Sincerely,
�.h` ,, G I Nt "/p
/ maw `
im,41
Michael Puntney,
Submitted via e-mail: Eddie.Kreipe(&,MSA-ep.com WARD
EXPIRES 12/31/18
www.psengineers.com
Portland, OH Tacoma.WA
VI
Mural;Smith&Associates,Inc.
EnOneeis/Planners 868 51-5t11 Avenue,Suite 1170•Portland,OR 97204.PHONE 503225.9010•FAX 503.225.9022
Walter
City of Tigard Community Development
13125 SW Hall Blvd
Tigard, Or 87223
RE: Clean Water Service's River Terrace Pump and Force Main Project No. 6631, Building
Permit#BUP2016-00001,Engineer Observation Summary Letter
Dear Walter:
This letter has been prepared to provide a summary of the Engineer of Record's observations
performed during the construction of this project. Observations during construction included
structural engineer observations performed by PSE,geotechnical engineer observations and
testing performed by GRI, and general civil, mechanical and architectural observations
performed by MSA. Summary reports from PSE and GRI have been provided to the City
seperately.
Based on observations during construction and a site walkthrough visit on 2/6/17,it is our
understanding that all previous punch list items have been addressed,with the exception of
the following:
1) Contractor to finish installation of the above grade bypass port following removal of
the temporary bypass pumps.
2) Contractor to remove erosion and sediment control measures when vegetation has
been established.
3) Doors to be keyed to CWS requirements.
It is our understanding that item#1 was addressed at the end of last week, item#2 will be
addressed this spring, and item#3 is currently being coordinated between the Contractor and
the Owner. Following acceptance of the above items,MSA has determined that the project
has been constructed in general compliance with the permit documents.
Sincerely,
Murray, Smith&Associates, Inc
L.-el, , z.Zt,t "
Eddie Kreipe,P.E.
Project Engineer
EPK:epk
G:\PDX_Projects\14\1611-River Terrace North PS&FM\0306-Periodic Observations of Construction\Observation Reports\Engineer
Observation summary Ietter.docx