Loading...
Report (30) r 1114 07) ST aa16 - 0003 , UOflO1 FIRE SAFETY SYSTEMS AQUASAFETM FLOW TEST VERIFICATION FORM I ka�... AquaSAFETM Flow Test Verification Form Alliance Important Installing contractor must submit this Member ID: 1964 completed form.Failure to do so nullifies the Company Name: Gravity Plumbing system warranty.E-mail or fax completed form to the Uponor Fire Safety Design Department Contact: Jon Hinkle at tedmisaLssodssatumnimem or 952.997.1731. Phone: 503-490-0763 For questions,contact Uponor Technical Services at 888594.7726 or technical.servicesauponor.com. Fax: 971-250-3808 Color of test orifice used: Black Job Name: Summit Ridge -I ys— Static pressure(not flowing)reading at incoming Project Number: 19070 F 00( water supply into home or at main shutoff: 78psi Job Address: [3(16,9,.. VocAP tan �' Residual pressure(flowing)reading at incoming water City: T► supply into home or at main shutoff: State,ZIP- De 1Z22_4 What time of day was the flow test taken? 3fe.. For designs not provided by Uponor,complete the following information. Flow test method used? U Bucket I3 Flow Meter Designer's Name: Patrick Brown Flow test gpm: (11 rein Company: Uponor How many gallons of water did the design predict as required?179pm Phone: 888-594-7726 Did the test meet or exceed design flow? 0 Yes 0 No Fax: 952-997-1731 Which sprinkler did you flow?Number: l D Is the warning sign permanently attached close to the Location of head: 134.41rubs, 3 main shutoff valve? Yes U No Date left in service with all valves open: 2-1-n Was this system required by code?0 Yes U No Test Witnessed and Verified by: Name -�+ natur �cupatiorl Date C sAdditional Explanations and Notes Uponor,Inc. Tel:800.321.4739 5925148th Street West Fax:952.997.1731 Apple Valley,MN 55124 USA Web:www.uponor-usa.com